Community)Informa.onal)Mee.ng)for) Proposed)Traffic)Calming)Plan)on) Queen)Elizabeth)Boulevard) October(15,(2014( 7:00pm( 1( Introduc7on(from(Task(Force( Why(were(here?( ( ( Community(concerns( ( ( Community(outreach(and(feedback( (


slide-1
SLIDE 1

Community)Informa.onal)Mee.ng)for) Proposed)Traffic)Calming)Plan)on) Queen)Elizabeth)Boulevard)

October(15,(2014( 7:00pm(

1(

slide-2
SLIDE 2

Introduc7on(from(Task(Force(

2(

Why(we’re(here?(

( (

Community(concerns(

( (

Involvement(with(traffic(calming(&(FCDOT(

( (

Community(outreach(and(feedback(

( (

slide-3
SLIDE 3

Mee7ng(Goals(

3(

EXPLAIN(

( (

INFORM(

( (

  • FCDOT(will(explain(traffic(calming(process(
  • Please(hold(ques7ons(7ll(the(end(of(the(

presenta7on((

  • Q&A(with(FCDOT(aYer(presenta7on((
slide-4
SLIDE 4

Residen7al(Traffic(Administra7on( Program((RTAP)(Process(Overview(

Community( Driven( Process(

Led(by(the( community(task( force((with( guidance(from( FCDOT)(

Implementa7on(of(traffic(calming(measures( based(on(standard(traffic(engineering(principles,( public(safety,(and(financial(viability(

4(

slide-5
SLIDE 5

Residen7al(Traffic(Administra7on( Program((RTAP)(Process(Overview(

Must(meet(qualifying(criteria(

Local(

  • r((

Collector( Volume(of( 600(–(6,000( in(24(hours(

Average(Speed(≥(30(mph( OR( 85th(Percen7le(Speed(≥(35(mph( (

5(

slide-6
SLIDE 6

Primary(Steps(in(the(RTAP(Process(

Step(1(

Study(ini7a7on(c(Request(for(ini7al(engineering( review(and(traffic(study(from(HOA(/(CA(/(Community(

Step(2(

FCDOT(conducts(formal(traffic(count(and(speed(study( Total(Volume( Northbound(average(speed( Southbound(average(speed( Northbound(85th(percen7le(speed( Southbound(85th(percen7le(speed( 1182( 28( 29( 34( 36( N(&(S( Analysis( 33%( 0(–(25(mph( 26(–(35(mph( 36(–(46(mph( +47(mph(( 56%( 7%( 3%(

6(

slide-7
SLIDE 7

Primary(Steps(in(the(RTAP(Process(

Step(3(

FCDOT(Engineering(Review(of(Roadway(/( Conceptual(Plan(Development( Virginia(Department(of(Transporta7on(Requires:( (

  • All(proposed(traffic(calming(devices(MUST(be(at(least(

500’(from(exis7ng(stop(condi7ons,(exis7ng(devices,( and(proposed(devices( (

  • There(MUST(be(at(least(1200’(between(mul7cway(

stop(condi7ons(

7(

slide-8
SLIDE 8

Primary(Steps(in(the(RTAP(Process(

FCDOT(Speed(Control(Devices( Speed(Humps((NOT(BUMPS)(

8(

slide-9
SLIDE 9

Primary(Steps(in(the(RTAP(Process(

FCDOT(Speed(Control(Devices( Ver.cal) Deflec.on) ( Speed(Humps( Speed(Tables( Raised(Crosswalks( Horizontal)Deflec.on) ( Raised(Median(Islands( Chicanes( Chokers( Mul7cWay(Stops( Traffic(Circle( Pavement(Markings(

9(

slide-10
SLIDE 10

Primary(Steps(in(the(RTAP(Process(

Step(3(

FCDOT(Engineering(Review(of(Roadway(/( Conceptual(Plan(Development(

10(

slide-11
SLIDE 11

Primary(Steps(in(the(RTAP(Process(

Step(3(

FCDOT(Engineering(Review(of(Roadway(/( Conceptual(Plan(Development(

11(

slide-12
SLIDE 12

Primary(Steps(in(the(RTAP(Process(

Step(3(

FCDOT(Engineering(Review(of(Roadway(/( Conceptual(Plan(Development(

12(

slide-13
SLIDE 13

Primary(Steps(in(the(RTAP(Process(

Step(3(

FCDOT(Engineering(Review(of(Roadway(/( Conceptual(Plan(Development(

13(

slide-14
SLIDE 14

Primary(Steps(in(the(RTAP(Process(

Step(3(

FCDOT(Engineering(Review(of(Roadway(/( Conceptual(Plan(Development(

14(

slide-15
SLIDE 15

Primary(Steps(in(the(RTAP(Process(

Step(3(

FCDOT(Affected(Resident(Form((

15(

slide-16
SLIDE 16

Primary(Steps(in(the(RTAP(Process(

Step(4(

Community(Mee7ng(to(present(proposed( traffic(calming(plan(

16(

slide-17
SLIDE 17

Primary(Steps(in(the(RTAP(Process(

Step(5(

Ballot(Process(to(vote(on(final(plan(

Mailed'to'your'residence'at'a'later'date,'and'must'be'returned'to'District' Supervisor’s'office'by'mail'or'in'person' Map(of( proposed( loca7ons(( Ballot( cover( leler(( Ballot(

17(

slide-18
SLIDE 18

Primary(Steps(in(the(RTAP(Process(

Step(6(

Upon(community(approval,(the(proposed(traffic( calming(plan(is(presented(to(the(Fairfax(County( Board(of(Supervisors(for(endorsement(( 50%( minimum(( return(

60%(of( returned( ballots( must(vote( “YES”(

PASS)

18(

slide-19
SLIDE 19

Primary(Steps(in(the(RTAP(Process(

Step(7(

Installa7on(of(endorsed(traffic(calming(plan(by( Department(of(Public(Works(and(Environmental( Services( Typically(( 60(–(90(( days(aYer( endorsement( Installa7on( takes(1(–(2( days(

No(parking(at( device( loca7ons( week(of( installa7on(

19(

slide-20
SLIDE 20

Follow(Up(Studies(

20(

slide-21
SLIDE 21

Follow(Up(Studies(

21(

slide-22
SLIDE 22

Ques7on(and(Answer(

22(

(

  • One(speaker(at(a(7me((
  • Ques7ons(are(directed(to(moderator((
  • Three(minutes(per(speaker((
  • Please(raise(your(hand(
  • Contact(Task(Force(representa7ve(for(

further(ques7ons/comments(aYer( mee7ng(

slide-23
SLIDE 23

Conclusions((

  • For(any(ques7ons(or(concerns(regarding(your(specific(plan,(please(

contact(your(task(force(chair(

  • For(any(ques7ons(regarding(the(program(or(its(process,(please(visit(

Fairfax(County's(website(at(hlp://www.fairfaxcounty.gov/fcdot/ rtap.htm((

23(