community board 8 manhattan
play

Community Board 8 Manhattan Land Use Committee July 8, 2020 BSA - PowerPoint PPT Presentation

Community Board 8 Manhattan Land Use Committee July 8, 2020 BSA Special Permit Application for PCE (Gym) Use BSA Cal No 2020-48-BZ 237-241 East 86th Street, Manhattan Applicant: Barrys Bootcamp LLC Representative: Akerman LLP, Frank St.


  1. Community Board 8 Manhattan Land Use Committee July 8, 2020 BSA Special Permit Application for PCE (Gym) Use BSA Cal No 2020-48-BZ 237-241 East 86th Street, Manhattan Applicant: Barry’s Bootcamp LLC Representative: Akerman LLP, Frank St. Jacques 1

  2. BSA Special Permit Application for PCE Use This application seeks a special permit from the Board of Standards and Appeals for a 7,273 square foot physical culture establishment (“PCE”), a Barry’s Bootcamp, on portions of the first and cellar floors of 237-241 East 86th Street, Manhattan (the 2 former Laytner’s Linen space).

  3. Zoning Map The site is located on East 86th Street in a C2-8A zoning district. 3

  4. Tax Map The proposed location for Barry’s Bootcamp is on the north side of East 86th St. just west of 2nd Ave. The site is improved with a 18-story mixed residential and commercial building on a 9,440 square foot lot. 4

  5. Area Map The location for the proposed gym on East 86th St. is consistent with the mixed-use character of the surrounding area, which has compatible commercial, office, and multifamily residential uses. 5

  6. Photographs of the Site & Surrounding Block 6

  7. First Floor Plan This application seeks to permit the operation of a new 7,273 square foot Barry’s Bootcamp gym on the first and cellar floors of the building. It would operate from 5:30 AM to 8:00 PM on Monday through Friday, and 7:00 AM to 5:00 PM on Saturdays and Sundays. The gym would contain a fitness studio, reception, “fuel bar” and lockers on the first floor. 7

  8. Cellar Floor Plan The gym would contain a “flex lab” for stretching classes and pre-/post- class stretching and changing rooms with showers lockers on the cellar floor. 8

  9. Sound Attenuation – Wall Detail Plans 9

  10. Sound Attenuation – Wall, Ceiling, & Floor Detail Plans 10

  11. Elevation and Sign Details 11

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend