SLIDE 1 City Counc ncil il Project ct Update | March 23rd, 2017

Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

Civic Park Pro rogr gram am Facil cility ty Alligator’s Creek Aq Aqua uatic ic Cent nter

slide-2
SLIDE 2 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps CIVIL ENGINEERING Kuhlmann Design Group | St. Louis, MO AJ Girondo III PE Carol Onest PE AQUATIC DESIGN Counsilman Hunsaker | St. Louis, MO Scott Hester PE STRUCTURAL ENGINEERING Kuhlmann Design Group | St. Louis, MO Anthony Augustine PE ARCHITECT-OF-RECORD SFS Architecture | Kansas City Kerry Newman Principal in Charge AIA LEED AP Brian Garvey Project Manager AIA LEED AP Harriet Grindel Project Architect AIA LEED AP MEP ENGINEERING Kuhlmann Design Group | St. Louis, MO Ken Hancock PE Rick Halteman PE Steve Slotten PE CONSTRUCTION MANAGER as AGENT Navigate Building Solutions | St.Louis MO Jen Kissinger Craig Schluter Todd Sweeney
slide-3
SLIDE 3 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

UND NDERST ERSTAN AND AG AGREE EE

Constr tructi tion n Phase Permit Review P & Z Review JANUARY ARY 2017 Project Design Kick Off AUGUST ST 2018 Program Facility Grand Opening Work rksho hop p 1 MAY 2018 ACAC Grand {re}Opening Work rksho hop p 2 Work rksho hop p 3 Work rksho hop p 4 Discovery Meeting Council Update Work rksho hop p 5 Work rksho hop p 6 Work rksho hop p 7 Work rksho hop p 8 Constr tructi tion n Docume ument nts Design ign Develo velopm pment nt Schem emat atic ic Design ign Bidding dding Bid Docume ument nts Issued ed Early August
slide-4
SLIDE 4 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

Engage Civic Park with a contextually appropriate, sustainable building which supports the seasonal aquatic center activities and provides a variety of flexible gathering spaces. The building should become a focal point for the community with multi-purpose spaces and the improvements to the aquatic center should enhance the user experience with fun activities for all ages.

slide-5
SLIDE 5

DESIGN

Considerations

Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

Architecture Aquatics Site W Work

slide-6
SLIDE 6 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

Increase the bather load capacity

  • f the pool by providing new

features.

New Lazy River with Beach Entry Spray Pa Pad Modify Existing Po Pool New Play Features

* * * *

Aquatics

slide-7
SLIDE 7 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps Considerations Diversity of Uses Pool Mechanical Issues Deck Replacement

Aquatics

Proposed Improvements Remove interior island of current channel Increases pool area +1,000 SF Increases pool patrons +67 New Spray Pad located north of existing pool. Accessible from interior of pool and exterior during shoulder seasons or special events New Lazy River and Zero-Depth Beach Entry Increases pool patrons +300 to 400

* * * * * *

slide-8
SLIDE 8 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

Build a new Program Fa Facility in Civic Park for events, gatherings, meetings, and classes.

Large and small group gatherings Receptions & rites of passage Multi-purpose program space Day camps

* * * *

Architecture

slide-9
SLIDE 9 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

1

OPTION

1

OPTION LOWER LEVEL BATH HOUSE UPPER LEVEL PROGRAM FACILITY Considerations Topography Separate Buildings
slide-10
SLIDE 10 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

1

OPTION

1

OPTION LOWER LEVEL BATH HOUSE UPPER LEVEL PROGRAM FACILITY
slide-11
SLIDE 11 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

2

OPTION

2

OPTION LOWER LEVEL BATH HOUSE UPPER LEVEL PROGRAM FACILITY Considerations Topography Combined or Stacked Buildings
slide-12
SLIDE 12 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

2

OPTION

2

OPTION LOWER LEVEL BATH HOUSE UPPER LEVEL PROGRAM FACILITY
slide-13
SLIDE 13 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

Provide more parking to support Civic Park events, ACAC, and the new Program Fa Facility.

Renovate or add to existing parking on east and west side of Civic Park New permanent parking off Woodlawn Modify existing parking off Civic Park Drive adjacent to ACAC

* * *

Site W Work

slide-14
SLIDE 14 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

* * * * *

P P P P

Site W Work

Parking Count Existing 254 254 Proposed 307 307 Considerations Topography Utilities Existing Trees Storm Water Increase Parking
slide-15
SLIDE 15 Introductions Project Background Mission Statement Design Considerations Concept Review Next Steps

Integrate the CMa Team into the Process Confirm Schedule & Budget Select a Building Layout Scheme to Develop Refine Aquatic and Site Layout Develop the Exterior and Interior Design

* * *

Next Steps

*

*

slide-16
SLIDE 16

Thank you.