CITY OF SAINT PAUL Public Works Division of Street Design and Construction Griggs Scheffer Paving Project Phase I Street Design and Construction G RIGGS -S CHEFFER Project Map www.stpaul.gov/construction Street Design and Construction G


slide-1
SLIDE 1

CITY OF SAINT PAUL

Public Works

Division of

Street Design and Construction

slide-2
SLIDE 2

Griggs – Scheffer Paving Project Phase I

Street Design and Construction

slide-3
SLIDE 3

GRIGGS-SCHEFFER

Project Map

Street Design and Construction

www.stpaul.gov/construction

slide-4
SLIDE 4

Street Design and Construction

GRIGGS-SCHEFFER

Presenters

Project Manager Chris Engelmann

chris.engelmann@stpaul.gov

651-266-6084 Project Engineer Cheng Xiong

cheng.xiong@stpaul.gov

651-266-6168

slide-5
SLIDE 5

Street Design and Construction

GRIGGS-SCHEFFER

Project Schedule ▪ This 1st meeting is informational — we are reaching out to you early in our design phase for your help in identifying potential conflicts/coordination issues ▪ A 2nd public meeting will be held to review construction-related information — meeting time and location are TBD ▪ City Council approval/Public Hearing in early 2020 ▪ Design winter of 2019/2020 ▪ Start construction summer of 2020 ▪ Planned end of major construction fall of 2020

slide-6
SLIDE 6

GRIGGS-SCHEFFER

What is the Project Improving?

Street Design and Construction

▪ New concrete curb and gutter ▪ New pavement (width 32-feet) ▪ Concrete driveway aprons ▪ Sidewalk and ADA-compliant pedestrian ramps ▪ Utility upgrades ▪ Lantern-style street lighting ▪ Urban forest planting — removal of all Ash trees, dead trees, and stumps ▪ Sodded boulevards

slide-7
SLIDE 7

GRIGGS-SCHEFFER

Before and After

Street Design and Construction

slide-8
SLIDE 8

GRIGGS-SCHEFFER

Typical Residential Section

Street Design and Construction

slide-9
SLIDE 9

GRIGGS-SCHEFFER

Concrete Curb and Gutter with Catch Basins

Street Design and Construction

After Before

slide-10
SLIDE 10

GRIGGS-SCHEFFER

Bituminous Pavement

Street Design and Construction

Before After

slide-11
SLIDE 11

GRIGGS-SCHEFFER

Sidewalk Replacement

Street Design and Construction

Sidewalk Replacement and Infill ▪ 5-foot walk ▪ Field inspection to identify panels to be replaced ▪ Typically set at property line ▪ Infill in areas of road reconstruction

slide-12
SLIDE 12

GRIGGS-SCHEFFER

ADA-Compliant Pedestrian Ramps

Street Design and Construction

Fan Ramp Directional Ramp

slide-13
SLIDE 13

GRIGGS-SCHEFFER

Driveways

Street Design and Construction

Driveway aprons will be concrete regardless of any existing special material New driveway aprons will be reconstructed at 12-feet max, 30-feet beyond the garage

slide-14
SLIDE 14

GRIGGS-SCHEFFER

Grade and Sod Boulevards

Street Design and Construction

slide-15
SLIDE 15

GRIGGS-SCHEFFER

Boulevard Gardens

Street Design and Construction

If you have a boulevard garden or plants you want to salvage: ▪ Coordinate with project to identify areas you do not want sod placed ▪ Plan to remove plants in the spring before construction work begins

slide-16
SLIDE 16

GRIGGS-SCHEFFER

Lantern-style Street Lighting

Street Design and Construction

Before After

slide-17
SLIDE 17

Street Design and Construction

Buckeye Catalpa Crabapple Hackberry Honeylocust Hybrid Elm Ironwood Kentucky Coffee London Plane Oak River Birch Serviceberry

GRIGGS-SCHEFFER

Tree Planting

slide-18
SLIDE 18

Street Design and Construction

The City of Saint Paul dedicates 1% of the project cost to public art

GRIGGS-SCHEFFER

Public Art

slide-19
SLIDE 19

SAINT PAUL REGIONAL WATER SERVICES

SPRWS Engineering Service Desk

651.266.6270 1900 Rice Street Saint Paul, MN 55113 https://www.stpaul.gov/departments/water- services/lead-household-water

slide-20
SLIDE 20

LEAD SERVICE REPLACEMENT

 All Lead water services will be

replaced from the water main to the property line or water service stop box

 Replacements to stop box are only

done if there is an obstruction at the property line or if a private plumber has already replaced the water service inside property to the stop box

Saint Paul Regional Water Services

slide-21
SLIDE 21

LEAD SERVICE REPLACEMENT INSIDE PROPERTY

 Can be assessed onto taxes over

20-years

 Building owner will have to obtain

private plumber and get quotes

 Excavation of yard generally not

needed

 Costs are reduced because

restoration is done in the ROW by the project

 Plumber list and information will be

mailed to property owner addresses

 Additional information available

from the SPRWS Engineering Service Desk 651.266.6270

Saint Paul Regional Water Services

slide-22
SLIDE 22

CITY OF SAINT PAUL

Public Works Sewer Division

Design Desk 651-266-6234

https:// //www ww.st stpau aul. l.gov/d

  • v/depar

artments/ s/publi lic-works/ works/sew ewer er-util ility ity- divison/

  • n/prop
  • per

erty-ow

  • wner

er-in info format mation ion

slide-23
SLIDE 23

Sewer Division

GRIGGS-SCHEFFER

Sanitary Sewer Replacement Option

slide-24
SLIDE 24

Sewer Division

GRIGGS-SCHEFFER

Sanitary Sewer Service Issues

slide-25
SLIDE 25

Sewer Division

▪ Does your drain run slowly or gurgle? ▪ Do you have sewer odors? ▪ Do you know where your sewer service runs? ▪ Are there bushes or trees planted over it? ▪ Has your sewer line ever been cleaned and inspected? ▪ Do you have a garbage disposal and do you use it for everything? ▪ Is there a sinkhole or depression near your home, boulevard, or street?

GRIGGS-SCHEFFER

Warning Signs of a Defective Sewer Service

slide-26
SLIDE 26

Real Estate Section

▪ Rates are not determined at this time ▪ Additional information will be available later this fall

Determining the Assessment

GRIGGS-SCHEFFER

Saint Paul Streets Program

slide-27
SLIDE 27

▪ Construction approved early 2020 (Final Order) ▪ Assessment approved fall of 2020 (Ratification of Assessment) ▪ Assessment is “pending” after the Final Order is approved

▪ Visible for property owners or title companies ▪ Payments are accepted (partial or full)

▪ Assessment is “levied” after the Ratification of Assessment is approved

▪ Invoice mailed, 30-days to pay to avoid interest ▪ If not fully paid, annual installments automatically go onto property taxes ▪ Paid over 20-years with simple interest and a flat fee

▪ Delayed payment of Special Assessment for Senior Citizens or Permanently Disabled

Not a forgiveness of the assessment

Interest accrues the same as non-deferred

Assessment Process/Approval Pending Assessment Levied Assessment

GRIGGS-SCHEFFER

Assessment Schedule

Real Estate Section

slide-28
SLIDE 28

Questions

slide-29
SLIDE 29

Project Manager Chris Engelmann 651-266-6084 Project Engineer Cheng Xiong 651-266-6168 Public Works Street Lighting Ben Hawkins 651-266-6256 Parks and Recreation Forestry Unit 651-632-5129 SPRWS (Water) Service Desk 651-266-6270 Public Works Sewers Design Desk 651-266-6234 Real Estate Section - Assessments General Line 651-266-8851

Street Design and Construction

GRIGGS-SCHEFFER

Contacts