city of hoboken firehouse parking lot base bid item
play

CITY OF HOBOKEN FIREHOUSE PARKING LOT BASE BID Item Description - PowerPoint PPT Presentation

HOBK-00070 7/22/2015 CITY OF HOBOKEN FIREHOUSE PARKING LOT BASE BID Item Description Quantity Unit Unit Price Amount 1 CLEARING/GRADING SITE 1 LS $5,000.00 $5,000.00 2 HOT MIX ASPHALT 9.5M64 SURFACE COURSE, 2" THICK 60 TON


  1. HOBK-00070 7/22/2015 CITY OF HOBOKEN FIREHOUSE PARKING LOT BASE BID Item Description Quantity Unit Unit Price Amount 1 CLEARING/GRADING SITE 1 LS $5,000.00 $5,000.00 2 HOT MIX ASPHALT 9.5M64 SURFACE COURSE, 2" THICK 60 TON $125.00 $7,500.00 3 DENSE GRADED AGGREGATE BASE COURSE, 6" THICK 402 SY $5.00 $2,010.00 4 HOT MIX ASPHALT 19M64 BASE COURSE, 4" THICK 120 TON $125.00 $15,000.00 5 COURSE AGGREGATE NO. 4, BROKEN STONE, 18" THICK 28 SY $55.00 $1,540.00 6 9"X18" CONCRETE VERTICAL CURB 60 LF $50.00 $3,000.00 7 GEOTEXTILE, ROADWAY STABILIZATION 402 SY $2.00 $804.00 8 WASTE CLASSIFICATION TESTING & SAMPLING 1 LS $1,000.00 $1,000.00 9 CONTAMINATED SOIL DISPOSAL 170 TON $75.00 $12,750.00 10 TRAFFIC STRIPES, LONG-LIFE, THERMOPLASTIC (IF & WHERE DIRECTED) 360 LF $2.00 $720.00 TOTAL CONSTRUCTION COST: $49,324.00 K:\HOBK\00070\Calculations & Reports\Engineer's Estimate.xlsx

  2. Proposed Construction Budget Estimate For: New Storage Facility Hoboken Fire Department 201 Jefferson Street Hoboken, NJ 07030 1-Dec-14 Description Quantity Unit Unit cost Sub-total SITEWOKR: Fencing removal & rework 17.00 LF $25.00 $425.00 Asphalt demo/repair 250.00 SF $16.00 $4,000.00 Excavation 200.00 CY $40.00 $8,000.00 $12,425.00 Total Sitework: CONCRETE & STEEL Concrete Footing/Slabs 50.00 CY $450.00 $22,500.00 Concrete Stairs/Railings 1.00 Lump $12,000.00 $12,000.00 Steel Beams/Decking 1,200.00 SF $30.00 $36,000.00 CMU Walls 2,560.00 SF $20.00 $51,200.00 $121,700.00 Total Concrete: EXTERIOR WORK & FINISHES: Roofing and Framing 1,100.00 SF $15.00 $16,500.00 Sheet Metal 60.00 LF $8.00 $480.00 PVC Trim 100.00 LF $10.00 $1,000.00 Aluminum Gutters and Leaders 100.00 LF $8.00 $800.00 Waterproofing Paint Finish 2,000.00 SF $1.50 $3,000.00 Overhead Door 1.00 Lump $2,500.00 $2,500.00 Doors and Hardware 4.00 Ea $1,000.00 $4,000.00 Total Exterior Work & Finishes: $28,280.00 ELECTRICAL: Electrical power 1,200.00 SF $3.00 $3,600.00 Lighting 1,200.00 SF $6.00 $7,200.00 $10,800.00 Total Electrical: Total Construction Costs: $173,205.00 Brick Veneer Alternate #1 250.00 SF $16.00 $4,000.00 General Allowance: 10% $17,320.50 Total Project Costs: $194,525.50 46.13.005_Hoboken Fire Department Storage.xlsx 1 of 1 12/1/2014

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend