city code updates part 12 cross connection control
play

City Code Updates (Part 12 Cross Connection Control) Tara McGowan, - PowerPoint PPT Presentation

Item 12 Backflow Prevention City Code Updates (Part 12 Cross Connection Control) Tara McGowan, Program Supervisor Jessica Davis, Project Manager Michael Gustafson, Senior Attorney February 15, 2017 Electricity | Natural Gas | Water |


  1. Item 12 Backflow Prevention City Code Updates (Part 12 Cross Connection Control) Tara McGowan, Program Supervisor Jessica Davis, Project Manager Michael Gustafson, Senior Attorney February 15, 2017 Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  2. Item 12 Agenda • Backflow prevention program • New state regulations • Proposed City Code changes • Next steps Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  3. Item 12 Safe Drinking Water • Safe drinking water supply – Clean Water Act, 1972 – Colorado Drinking Water Regulations, Colorado Department of Public Health and Environment (CDPHE) regulations • Our customers trust us Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  4. Item 12 What is backflow? Normal Condition Electricity | Natural Gas | Water | Wastewater

  5. Item 12 What is backflow? Backflow Hazards Electricity | Natural Gas | Water | Wastewater

  6. Item 12 Sources of Hazards • • Hospitals Auto repair shop • • Industrial Auxiliary water source • • Irrigation Blood banks • • Laboratories Boilers • • Livestock facility Car wash • • Manufacturing facility Chemical processes • • Medical facility and clinics Dental facility • • Mortuaries Display fountain • • Pet store Dry cleaning/laundries • • Pool Fire suppression systems • • Restaurants Greenhouse • • Veterinary Hair salons Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  7. Item 12 Backflow Protection Methods • Air Gap Separation Electricity | Natural Gas | Water | Wastewater

  8. Item 12 Backflow Protection Methods • Double Check Valve Assembly (DC) Electricity | Natural Gas | Water | Wastewater

  9. Item 12 Backflow Protection Methods • Reduced Pressure Principle Assembly (RP) Electricity | Natural Gas | Water | Wastewater

  10. Item 12 Existing Backflow Prevention Program • New commercial customers since 2001 – 4,600 existing commercial customers – 8,300 assemblies • Responsibility and cost = customer • Assemblies must be tested annually • Utilities tracks assemblies and testing • City Code and Standards Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  11. Item 12 New State Regulations • CDPHE Regulation 11.39 adopted January 1, 2016 • Survey all commercial customer by 2020 – Total of ~14,600 customers • 100% testing by 2020 – 20,000 assemblies • Annual reporting to CDPHE • Response to violations Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  12. Item 12 Helping Customers Succeed Postcards Letters Phone calls Site visits City Code Hotline Standards Email Customer Website CSFD and Newsletter PPRBD YouTube Stakeholder Variances Education Extensions Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  13. Item 12 Proposed City Code Changes Key Revisions: 12.1.101, 12.4.201, 12.4.1202: Definitions – Approved Backflow Prevention Assembly – Approved Backflow Prevention Method – Backflow – Backflow Prevention Assembly – Backflow Prevention Method – Certified Backflow Prevention Assembly Tester – Cross Connection – Degree of Hazard – Premises – User Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  14. Item 12 Proposed City Code Changes Key Revisions: 12.4.1201: Scope and Applicability – Clarifies that one purpose is to comply with State Regulations – Confirms that Code takes precedent over Utilities ’ Standards 12.4.1203: Unlawful Acts – Includes an Approved Backflow Prevention Method as an acceptable means to protect against cross connections Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  15. Item 12 Proposed City Code Changes Key Revisions: 12.4.1204: Plan Approval – Clarifies when a customer needs to submit design plans and information to Utilities 12.4.1205: Installation – Removes redundant provision 12.4.1205 (New): Inspection – Clarifies the extent of Utilities’ liability after inspection Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  16. Item 12 Proposed City Code Changes Key Revisions: 12.4.1207 (New): Requirements – Reflects new requirements for when and where a customer must install a backflow prevention method or assembly • New commercial customers • Existing commercial customers who are modifying the service line or plumbing which creates a cross connection • Existing commercial customers if there is a hazard at their premises • Residential customers if a hazard is discovered at their premises • Public users (other public water suppliers) • CEO may provide exceptions Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  17. Item 12 Proposed City Code Changes Key Revisions: 12.4.1209 (New): Testing – Clarifies testing requirements 12.4.1210 (New): Installation Repair and Testing – Clarifies that service standards and specifications govern installation, maintenance, repair and replacement – Provides timeframe for customer compliance before enforcement action is taken Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  18. Item 12 Proposed City Code Changes Key Revisions: 12.4.1212 (New): Cross Connection Survey – Clarifies Utilities ’ authority to survey customers to identify cross connections 12.4.1213 (New): Enforcement; Remedies – Removes requirement that a customer receive first Imminent Hazard Order before administrative fines are assessed Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  19. Item 12 Proposed City Code Changes Housekeeping Revisions: 12.4.1208 (New): Management Plan 12.4.1211 (New): Recordkeeping 12.4.1213 (New): Enforcement Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  20. Item 12 Next Steps • Continued outreach to stakeholders • 2/28: City Council first reading • 3/14: City Council second reading • 4/1: City Code changes take effect Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  21. Item 12 Questions Electricity | Natural Gas | Water | Wastewater

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend