Item 12 Backflow Prevention City Code Updates (Part 12 Cross Connection Control) Tara McGowan, Program Supervisor Jessica Davis, Project Manager Michael Gustafson, Senior Attorney February 15, 2017 Electricity | Natural Gas | Water |


slide-1
SLIDE 1

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

Backflow Prevention City Code Updates (Part 12 Cross Connection Control)

Tara McGowan, Program Supervisor Jessica Davis, Project Manager Michael Gustafson, Senior Attorney February 15, 2017

slide-2
SLIDE 2

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  • Backflow prevention

program

  • New state regulations
  • Proposed City Code

changes

  • Next steps

Agenda

slide-3
SLIDE 3

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  • Safe drinking water supply

– Clean Water Act, 1972 – Colorado Drinking Water Regulations, Colorado Department

  • f Public Health and Environment

(CDPHE) regulations

  • Our customers trust us

Safe Drinking Water

slide-4
SLIDE 4

Item 12

Electricity | Natural Gas | Water | Wastewater

Normal Condition

What is backflow?

slide-5
SLIDE 5

Item 12

Electricity | Natural Gas | Water | Wastewater

Backflow Hazards

What is backflow?

slide-6
SLIDE 6

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

Sources of Hazards

  • Auto repair shop
  • Auxiliary water source
  • Blood banks
  • Boilers
  • Car wash
  • Chemical processes
  • Dental facility
  • Display fountain
  • Dry cleaning/laundries
  • Fire suppression systems
  • Greenhouse
  • Hair salons
  • Hospitals
  • Industrial
  • Irrigation
  • Laboratories
  • Livestock facility
  • Manufacturing facility
  • Medical facility and clinics
  • Mortuaries
  • Pet store
  • Pool
  • Restaurants
  • Veterinary
slide-7
SLIDE 7

Item 12

Electricity | Natural Gas | Water | Wastewater

  • Air Gap Separation

Backflow Protection Methods

slide-8
SLIDE 8

Item 12

Electricity | Natural Gas | Water | Wastewater

  • Double Check Valve Assembly (DC)

Backflow Protection Methods

slide-9
SLIDE 9

Item 12

Electricity | Natural Gas | Water | Wastewater

  • Reduced Pressure Principle Assembly (RP)

Backflow Protection Methods

slide-10
SLIDE 10

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  • New commercial customers since 2001

– 4,600 existing commercial customers – 8,300 assemblies

  • Responsibility and cost = customer
  • Assemblies must be tested annually
  • Utilities tracks assemblies and testing
  • City Code and Standards

Existing Backflow Prevention Program

slide-11
SLIDE 11

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  • CDPHE Regulation 11.39 adopted

January 1, 2016

  • Survey all commercial customer by

2020

– Total of ~14,600 customers

  • 100% testing by 2020

– 20,000 assemblies

  • Annual reporting to CDPHE
  • Response to violations

New State Regulations

slide-12
SLIDE 12

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

Helping Customers Succeed

Customer

Postcards Letters Phone calls Site visits Hotline Email Website Newsletter YouTube Variances Extensions Stakeholder Education CSFD and PPRBD City Code Standards

slide-13
SLIDE 13

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

Key Revisions:

12.1.101, 12.4.201, 12.4.1202: Definitions

– Approved Backflow Prevention Assembly – Approved Backflow Prevention Method – Backflow – Backflow Prevention Assembly – Backflow Prevention Method – Certified Backflow Prevention Assembly Tester – Cross Connection – Degree of Hazard – Premises – User

Proposed City Code Changes

slide-14
SLIDE 14

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

Key Revisions:

12.4.1201: Scope and Applicability

– Clarifies that one purpose is to comply with State Regulations – Confirms that Code takes precedent over Utilities’ Standards

12.4.1203: Unlawful Acts

– Includes an Approved Backflow Prevention Method as an acceptable means to protect against cross connections

Proposed City Code Changes

slide-15
SLIDE 15

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

Key Revisions:

12.4.1204: Plan Approval

– Clarifies when a customer needs to submit design plans and information to Utilities

12.4.1205: Installation

– Removes redundant provision

12.4.1205 (New): Inspection

– Clarifies the extent of Utilities’ liability after inspection

Proposed City Code Changes

slide-16
SLIDE 16

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

Key Revisions:

12.4.1207 (New): Requirements

– Reflects new requirements for when and where a customer must install a backflow prevention method or assembly

  • New commercial customers
  • Existing commercial customers who are modifying the service line or

plumbing which creates a cross connection

  • Existing commercial customers if there is a hazard at their premises
  • Residential customers if a hazard is discovered at their premises
  • Public users (other public water suppliers)
  • CEO may provide exceptions

Proposed City Code Changes

slide-17
SLIDE 17

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

Key Revisions:

12.4.1209 (New): Testing

– Clarifies testing requirements

12.4.1210 (New): Installation Repair and Testing

– Clarifies that service standards and specifications govern installation, maintenance, repair and replacement – Provides timeframe for customer compliance before enforcement action is taken

Proposed City Code Changes

slide-18
SLIDE 18

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

Key Revisions:

12.4.1212 (New): Cross Connection Survey

– Clarifies Utilities’ authority to survey customers to identify cross connections

12.4.1213 (New): Enforcement; Remedies

– Removes requirement that a customer receive first Imminent Hazard Order before administrative fines are assessed

Proposed City Code Changes

slide-19
SLIDE 19

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

Housekeeping Revisions:

12.4.1208 (New): Management Plan 12.4.1211 (New): Recordkeeping 12.4.1213 (New): Enforcement

Proposed City Code Changes

slide-20
SLIDE 20

Item 12

Electricity | Natural Gas | Water | Wastewater Electricity | Natural Gas | Water | Wastewater

  • Continued outreach to stakeholders
  • 2/28: City Council first reading
  • 3/14: City Council second reading
  • 4/1: City Code changes take effect

Next Steps

slide-21
SLIDE 21

Item 12

Electricity | Natural Gas | Water | Wastewater