cineplaza
play

Cineplaza The design for the building works around the concept of a - PowerPoint PPT Presentation

Cineplaza The design for the building works around the concept of a central plaza, which acts as a social hub for staff, students and community, stengthening the conncection between the building pus like typology with streets conecting different


  1. Cineplaza The design for the building works around the concept of a central plaza, which acts as a social hub for staff, students and community, stengthening the conncection between the building pus like typology with streets conecting different areas. As well as being used for circuclation, the streets are designed for fjlming, inspired by the Tobacco Warehouse. and the urban environment. The buidlings are arranged in a cam-

  2. The Plaza Film Streets Activities such as outdoor exhibitions and fjlming will take place in the Plaza. The buildings are arranged to maximise natural light, views. The chamfering and colonades are designed to direct people towards the plaza and create a sense of transpar- ency. Corrugated timber is used as a sustainable alternative to aluminium, already present at the site. Red brick is also used for the fmoor to resemeble both the brick from Tobacco Warehouse and fjlm streets. Materiality Campus typology

  3. 1 9. Creative writing 2 6. North side offjces 13. Technicians offjces 14. Female changing 15. Male changing 16. Plant room 17. Actor waiting room 18. Plaza 7. Storage 8. Small Classrooms room 3. Refectory 10. Film Studio 11. Storage 19. Disabled Parking 20. Delivery area 21. Bin Store 22. Parking 23.Film Streets 24. Bike rack Ground Floor Plan N 4. Open plan offjce area 5. West side offjces 2. Kitchen 13 3 4 5 6 7 8 9 10 1. Main Entrance 12 11 14 24 15 17 18 19 20 21 22 16 23 0 1 2 3 4 5 10 (m)

  4. 30 35. Sound Studio 1 and room 33.Studio sound control 32. Studio control room 31. Large classrooms 37 36 35 34 33 32 31 29 28 27 26 25 30. Informal study space 29. Waiting room 28. Meeting room 2 27. Meeting room 1 26. Upper fmoor offjces 25. Film Exhibition N First Floor Plan control room 36. Sound Studio 2 and control room 37. Roof garden 34. Storage 0 1 2 3 4 5 10 (m)

  5. Second Floor Plan N 38. Informal study space 39. Large Classrooms 38 39 0 1 2 3 4 5 10 (m)

  6. Third Floor Plan N 40 41 42 40. Cinema 41. Film libaray and archive 42. Roof garden 10 (m) 0 1 2 3 4 5

  7. Fourth Floor Plan N 43. Waiting area 44. Lecture Theatre 43 44 0 1 2 3 4 5 10 (m)

  8. West Elevation N 0 1 2 3 4 5 10 (m)

  9. South Elevation N 10 (m) 0 1 2 3 4 5

  10. East - West Section N 0 1 2 3 4 5 10 (m)

  11. Refectory and fjlm exhibition space

  12. Sketch approaching the entrance and administration building

  13. Sketch view of the Plaza

  14. Isometric N 0 1 2 3 4 5 10 (m)

  15. Bay Elevation and Detail Section Knife Plate Connector 165x150mm Glulam Beam 5 Ply CLT Panels notched 150x20mm Celing Finish Roller Blind 300x350mm Glulam Column 50x1000mm Concrete Paving 180mm Sand Beading 100mm Wood Fiber Insulation 100x100mm Block Work 3mm Floor fjnish 75mm cement screed 150mm rigid insulation Damp Proof Course 150mm Concrete raft 5Ply CLT 100mm Insulated StudWall foundation reinforced to 450mm 30mm Plysheet Bitumun based 50x50mm Vertical Battons 5mm VCL 200mm rigid insulation Metal Flashing 380x150mm Cladding Fin 32x100mm Thermally modifjed, corrugated tulip wood 50x50mm Horizontal Battons 0 1 2 3 4 5 10 (m)

  16. Structural Strategy CLT wall Insulation Insulated Stud Wall Vertical Battons Horizontal Battons Corrugated Timber Cladding and foundations Concrete Floor ing core CLT Load bear- Load bearing The same structual principles are repeated throughout the diffenent build- ground fmoor In open plan areas and beam frame Gluam post and Walls Load Bearing CLT CLT Roof Panel and beam frame and load bearing CLT panels. ings. Each building is loosley based on a grid and is made up of a glulam post 5 Ply CLT

  17. Environmental Strategy sourced from canal ature, rain water buffer Regulates indoortemper- Green Roof developement sustainable Community hub - The Plaza Openings on both sides Ventilation Cross Concrete Floors Thermal mass For underfmoor heating Planting Heat Pump Water Source hangs Glazed facades and over- and Shading Natural Light enegery consumption in procution timber cladding can be recycle and low CLT and Glulam for the structure and Timber and to improve mental well-being. For cleaner air within an industrial area Green Roof

  18. Site Analysis Campus Typology Corrugated timber as resem- blance of corrugated aluminium and brick to be used in landscap- ing Central plaza Views to canal Create access from plaza Multiple buildings centered around the around the site plaza to create streets for fjlming and a social hub for the community Film Strees Inspired from street between Tobacco Warehouse Materials Observations: Corrugated alu- Materials Buildings of historic interest Climate as well as providing a connection Observations: The site is ex- posed to direct solar gains throughout the day Views Observations: Views towards canal are of interest as other sig- nifacant buildings can be seen with nature Historic infmuence Access Observations: Current Footpath running along side of the site Noise Observations: Unplesant noise from adjacent roads minium and brick widley used

  19. Massing 1 help to guide views towards the plaza and the canal the rigid feel around the site, creating a blur between inside and out. The interior is arranged around the centre to easily around the site as well as creating a community in the centre. The colonnades add transparency and loosens Massing 4: Chamfered and reshaped. Encorparating different chamfers into the building allows the user to move Massing 3: Loosen and reshaped. The misalignment of the buildings reveals different elements to the user building and landscape. Massing 2 : Simplifjed and ordered. The rigid lay out offers little transparancy and connection between the users Massing 1 : Buildings categorised into main functions and arranged around the Plaza. Shamfers in the buildings Massing 2 Massing Massing 4 Massing 3 Massing 2 Massing 1 Massing 4 Massing 3 enable users to spill out into the streets and plaza, strengthening the connection to the urban realm.

  20. Study of how chamfered corners and colonnades are used to guide peoples movement and line of sight. Economist Building Maggies- dRMM Corrugated timber study

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.