CERN Info Point 2 Status Cosmic data taking finished. SM-II (sector 0) Un-installation done. Disassembly done. Problems investigated Takus slide. SM-I (sector 8) un-installation done. Disassembly started.


slide-1
SLIDE 1

CERN Info

slide-2
SLIDE 2

Point 2 Status

  • Cosmic data taking

finished.

  • SM-II (sector 0)

Un-installation done. Disassembly done. Problems investigated Taku’s slide.

  • SM-I (sector 8)

un-installation done. Disassembly started. will finish on Wednesday.

  • Sector 17

Gas leak investigation Nora’s slide.

  • Mini-frame PP0 (pre-trigger)

disconnection done.

  • Wiener campaign nearly end (last 12 went Wiener).
  • Thanks for big efforts: Kengo, Sylwester, Kenshi,

Nora, Joerg, StefanS, Yvonne, Dousatsu, Masahiro, Taku, Thomas, Kathrin, Tom, Kai, Chilo, Jochen, Markus, Ana, Bernd, Peter, Tobias, Norbert.

slide-3
SLIDE 3

Detector Status by End of Shutdown (Arturo) ALICE Status

3/5 PHOS 8/18 TRD 18/18 TOF 7/7 HMPID 1/6 EMCAL 1 2 3 4 5 6 7 9 8 11 12 13 14 15 17 1 2 3 4 10 16

slide-4
SLIDE 4

Point 2 Plan

  • SM-I (sec. 8) disassembly finish = Wed.
  • Shipping SM-II (and part of SM-I) chambers to GSI = Wed.
  • SM-III

In the rotator already. Move to CR on Thu. and start on Fri.

  • Sec. 7 final preparation ~ Nov. 17.

Installation to sec. 7 = Nov. 24, 25. Service connections & commissioning = Nov. 26, till end of Dec.

  • Shipping rest of the chambers & 2 (or 1?) hulls … when SM-VI arrives.
  • SM-VI

Arrival … End of Nov. (expectation). Testing … whole Dec. Installation to Sec. 1 … end of Dec. or beg. Jan.

  • Sec. 8 LV patch cords installation ~ Nov.
  • SM-I and SM-II Sec. 8 + 0 installation ~ end of Feb.
  • Gas system leak tightness tests necessary (scan all sectors in BSF) ~ Nov..
  • Cooling solving for Sec. 10.
  • Commissioning and cosmic runs with sectors 0, 1, 7, 8, 9, 17 (+10, 16?).
  • End of shutdown … May 1st.
slide-5
SLIDE 5

Nora’s slide

slide-6
SLIDE 6

Leak‐Hun)ng
in
SM
17


Tests:
 1.
By‐passing
all
layers
(all
inlets
into
manifold)
 
 all
)ght
–
leak
s)ll
there
 2.
Disconnec)ng
exhaust
 
 result:
leak
must
be
in
exhaust
between
manifold
and
gasplant
 
 
 didn’t
find
it
so
far
b/c
of
underpressure
 3.
Replacing
aluminium
ring
of
exhaust‐connec)on
at
babyframe
with
O‐ring
 
 leak
s)ll
there
 4.
Sniffing
tubes
and
connec)ons
(also
the
welding)
in
CR5
 
 couldn’t
find
any
leak
 5.
Disconnec)ng
exhausSube
totally
 
 system
)ght
‐>
tube
must
be
the
problem
 6.
Replacing
tube
 
 system
)ght
(FINALLY!!!!)
 
 found
hole
in
the
tube
‐>
happened
(probably)
b/c
of
spark
from
TOF
power
 Connec)ng
SM
back
on


slide-7
SLIDE 7

Taku’s slide

slide-8
SLIDE 8

SM00 disassembly and check

List of problems in SM00

TRD weekly meeting on 13.10.08

slide-9
SLIDE 9

Investigation of the problems

Cooling problem:

S2L5 S3L5

We found strong bent of cooling tubes

http://phenix.cns.s.u- tokyo.ac.jp/~gunji/tmp/cooling_pipes_sm00l5.pdf

Optical output problem:

S0L2A

fiber (20) broken

confirmed with other ORIs and other fibers

S3L2A

fiber not connected at patch panel behind No problem after connecting fiber at patch panel

S4L4AB

fiber problem

confirmed with other ORI and other fibers

S4L5B

seems OK at surface test

slide-10
SLIDE 10

Investigation of the problems

DCS board dead:

S2L5

flashing firmware using JTAG failed with some errors Need to investigate more detail in KIP

New problem happened during disassembly

DCS board on S3L5 can never be on.

0.8V instead of ~5V at the input of DCS board PDB is reason (no power from PDB to DCS of S3L5)

confirmed that DCS board is fine by using another line of the power.