CEA- IRFU : HIGHLIGHTS ON ACCELERATOR AND MAGNETS Anne-Isabelle Etienvre Head of Irfu 10/01/2018 IRFU:OVERVIEW 17 ERC 975 publications 65 active patents ~ 950 FTE Institut de recherche sur les lois fondamentales de lunivers


  1. CEA- IRFU : HIGHLIGHTS ON ACCELERATOR AND MAGNETS Anne-Isabelle Etienvre Head of Irfu 10/01/2018

  2. IRFU:OVERVIEW 17 ERC 975 publications 65 active patents ~ 950 FTE Institut de recherche sur les lois fondamentales de l’univers Accelerators, 115 FTE GANIL Supra. Magnets DACM Astrophysics DAp Accelerators, 165 FTE 180 FTE Accelerators, Space technologies Astrophysics Supra. Magnets Supra. Magnets DEDIP DPhN Detectors, electronic, 140 FTE Nuclear Physics Detectors, Electronics, 75 FTE computing Nuclear Physics Computing DPhP DIS Particle Physics 100 FTE Systems engineering 130 FTE Particle Physics Engeneering

  3. GENERAL STRATEGY Basic Research in Physics in link with large scale facilities Researches into the fundamental laws of the Universe Co-Leader in France with CNRS (INSU & IN2P3), Universities Goals: 4 key questions and associated technology • What are the ultimate constituents of matter? • What is the energy content of the Universe? • How is the Universe structured? • What are nuclear matter self-organisation processes? Broader approach, large scale facilities and Cryotechnologies Goals: 2 specific technological topics • Superconducting Magnets • Particle Accelerators | PAGE 3

  4. LARGE PLATFORMS @ SACLAY (50 000 M 2 ) DETECTORS SPACE Clean rooms for space Large migromegas detectors instruments integration and tests integration and tests (LHC UPGRADES) Clean room - 130m² Magnets and accelerators Computing Synergium - 25 000m² HPC cluster Integration halls, Node of Grid@LHC clean rooms cryostats B 126 Page 4

  5. IRFU@GANIL Ganil: joint installation CEA/CNRS Spiral2 : RFQ: first beam, excellent performances Cryomodules: commissioniong ongoing 10/01/2018 5

  6. XFEL : ACHIEVEMENT OF THE CRYOMODULES INTEGRATION LAST CRYOMODULE LEFT SACLAY IN JULY 2016 EXCELLENT OPERATING GRADIENT 10/01/2018 6

  7. SPIRAL2 - GANIL FIRST BEAM THROUGH THE RFQ IN 12/2015 EXCELLENT RFQ PERFORMANCES  Protons, deutons  Transmission & emittance + (Q/A=1/3)  Next steps: Deuteron, 18 O 6 + , 58 Ni 19 CRYOMODULES  12 cryomodules delivered and installed  Tests ongoing 10/01/2018 7

  8. ESS : IMPORTANT MILESTONES SOURCE & LEBT Control system Doppler (delivered to Catania) Emittancemeter RFQ : CONSTRUCTION STARTED CRYOMODULES (9 MEDIUM , 21 HIGH):  Excellent tests performed on cavity prototypes  First couplers tested: good results  Collaboration with CNRS/IPNO 10/01/2018 8

  9. IFMIF- LIPAC (BROADER APPROACH) SOURCE AND INJECTOR DELIVERED TO JAPAN (ROKKASHO) Commissioning ongoing (114 mA, emittance 0.26 pi.mm.mrad - protons) CAVITIES, COUPLERS : PRODUCTION ONGOING 10/01/2018 9

  10. SARAF : SOREQ APPLIED RESEARCH ACCELERATOR FACILITY IRFU RESPONSIBLE FOR SUPERCONDUCTING LINAC CONSTRUCTION  Final proton/deuton energy: 35/40 MeV  Saraf phase 2 goal: nuclear physics, neutron science, medical applications CDR PASSED SUCCESFULLY IN JULY 2016 : TOWARDS CONSTRUCTION  Cavities and couplers, solenoid package, rebuncher b =0.091 b =0.181 2.6 MeV 7 MeV 11.8 MeV 24.8 MeV 40.0 MeV RFQ MEBT CM1 CM2 CM3 CM4 3.85 m 4.73 m 4.59 m 4.59 m 4.98 m 4.98 m 28.7 m 1 Phase I - 2010 Phase II - 2022 10/01/2018 0

  11. JT60 (BROADER APPROACH) CONTEXT:  Superconducting Tokamak JT60-SA  Construction of 18 (+2) coils (IRFM/IRFU) – 15 tons, 4.5 K CRYOGENIC TESTS  Nominal conditions ( 27.5 kA)  All steps succesful ( fast discharge, quench) OUTER INTERCOIL STRUCTURES INTEGRATION FIRST COILS LEFT SACLAY  NAKA • 2 COILS INSTALLED ON THE TOKAMAK 1 10/01/2018 1

  12. MAGNETS: HIGHLIGHTS R3B GLAD  Magnet delivered to GSI , commissioning ISEULT: WHOLE BODY MRI MAGNET AT 11.7 T  Commissioning ongoing SUPER FRS  24 superferric dipoles for FAIR  Magnet detailed design and specification finalized DESIGN OF THE SUPERCONDUCTING COIL FOR THE 43 T LNCMI HYBRID MAGNET (CNRS/LNCMI- GRENOBLE) 1 10/01/2018 2

  13. HL LHC AND BEYOND MQYY R&D ON HIGH FIELD MAGNETS  NbTi (MQYY magnets)  Nb3Sn (Fresca2, EuroCircol,..) cable behavior tests coils wound at Saclay, impregnated at CERN  HTS (EUCARD2,..) insert dipole protection Costheta Design (CEA) 1 10/01/2018 3

  14. LHC DETECTOR UPGRADES: STRONG INVOLVEMENT ATLAS AND CMS DETECTOR UPGRADES  New Small Wheel : large Micromegas detectors (ATLAS muon spectrometer)  1/3 out of 1200 m 2 , large detectors surface (3 m 2 ), high precision (40 mm)  Clean room facility for the integration @ Saclay  PHASE 2 : inner detector (CMOS), electromagnetic calorimeter, muon spectrometer R&D FOR ILC  Important developments since 2002  Prototypes tested at KEK  Diphase CO2 cooling 1 10/01/2018 4

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.