Capt. Mark Tyler Voss Middle School UPDATE BACKGROUND Voss MS - - PowerPoint PPT Presentation

capt mark tyler voss middle school
SMART_READER_LITE
LIVE PREVIEW

Capt. Mark Tyler Voss Middle School UPDATE BACKGROUND Voss MS - - PowerPoint PPT Presentation

Capt. Mark Tyler Voss Middle School UPDATE BACKGROUND Voss MS will be located on 142 acres near Bergheim at the intersection of FM 3351 and SH 46. To be constructed with a capacity for 1,500 students and approximately 115 adult


slide-1
SLIDE 1
  • Capt. Mark Tyler Voss Middle School

UPDATE

slide-2
SLIDE 2

BACKGROUND

  • Voss MS will be located on 142 acres

near Bergheim at the intersection of FM 3351 and SH 46.

  • To be constructed with a capacity for

1,500 students and approximately 115 adult staff.

  • When the school opens, in the Fall of

2019, we will open with grades 6 & 7 with a projected enrollment of 474.

  • Primary access with be from SH 46

with roadway improvements to include turning lanes, school zone flashers, and a lighted intersection.

  • Secondary access is currently in

negotiation with plans to provide driveway and utility easement access from FM 3351.

slide-3
SLIDE 3
slide-4
SLIDE 4

Pot

  • table

le Water and and Fir Fire Flow de demands

RETAIL SERVICE FROM GUADALUPE BLANCO RIVER AUTHORITY (GBRA)

  • We have secured a long term water

supply agreement for retail water from

  • GBRA. BISD will pay for capital cost to

extend pipeline from Cordillera Ranch to school tract.

  • Water development also reserves

sufficient water capacity from the western Canyon Lake resources for future needs and development at this site.

  • Water development includes fire

protection and on-site storage (Fire Tank w/fire pump) as required by building codes and Kendall County Fire Marshall.

slide-5
SLIDE 5

Wastewater

  • The chart to the right shows estimated

wastewater strength for Voss MS, with showers and cafeteria, is calculated in gallons/person/day with design flow, peak flow, & oxygen demand…along with ammonia & oxygen demand loading

  • Permitting and Planning for a Type 1 Reuse

authorization, under 30 TAC chapter 10, is underway with PUBLIC NOTICE of BISD’s application for a TLAP permit.

  • Our goal is to reclaim/reuse all treated

effluent as an irrigation source using the standards under 210.33, “…use includes irrigation where the public may be present at the time irrigation takes place…i.e. residential yards, landscape, public parks, golf courses, school yards, or athletic fields…in some cases, even crops can be irrigated with type 1 treated effluent.”

slide-6
SLIDE 6
slide-7
SLIDE 7