Capital Design Advisory Committee March 30, 2016 1 Route 5 Traffic - PowerPoint PPT Presentation

Capital Design Advisory Committee March 30, 2016 1 Route 5 Traffic Calming Phase II Update AGENDA New Academic Building & Auditorium New Varsity Fields & Stadium New Campus Entrance Sign New Sidewalk for Trinity Church


  1. Capital Design Advisory Committee March 30, 2016 1

  2. • Route 5 Traffic Calming Phase II Update AGENDA • New Academic Building & Auditorium New Varsity Fields & Stadium • New Campus Entrance Sign • New Sidewalk for Trinity Church Road Capital • New solar power arrays on campus and at Design Advisory HSMC’s Mattapany /Kohut Way property. Presentation March 30, 2016 2

  3. Route 5 Traffic Calming Phase II Capital Design Advisory Presentation March 30, 2016 3

  4. Route MD 5 Pedestrian and Bike Path Revised Path Initial Layout Capital Design Advisory Presentation March 30, 2016 4

  5. Purpose: MD 5 Provide a Pedestrian and Bike safe path for Path pedestrians and bicyclists >2’-0” between the main campus Capital Design and the north field . Advisory Presentation March 30, 2016 5

  6. Challenges & Partners: MD 5 Pedestrian  Environmental stewardship and Bike Path  Preservation of archaeological resources  Access for the disabled  MD 5 traffic flow  Multiple regulatory overlays Capital Design Advisory Presentation March 30, 2016 6

  7. Southern Section: St. John’s Pond to Yaocomaco Dr. New crosswalk Reduced width shoulder New curb Porous Area of asphalt sidewalk archaeological concern QUEEN ANNE Capital Design HALL Advisory Presentation Rebuilt brick sidewalk, Transition to porous asphalt March 30, 2016 BRIDGE AT ST. JOHN’S 7 POND

  8. Proposed Typical Section St. John’s Pond to Yaocomaco Drive MD 5 Pedestrian and Bike Path Capital Design Advisory Presentation March 30, 2016  CAMPUS Looking Southward RIVER  8

  9. Center Section: Yaocomaco Drive to Boardwalk Boardwalk FISHER’S Reduced width CREEK shoulder Crosswalk Porous asphalt path Capital Design Advisory ADMISSIONS Presentation March 30, 2016 COBB HOUSE 9

  10. Proposed Typical Section Boardwalk at Fisher’s Creek MD 5 Pedestrian and Bike Path 3.5’ Minimum Capital Clearance Design Advisory Presentation March 30, 2016 Looking Southward RIVER  10

  11. Northern Section: Boardwalk to North Field NORTH FIELD New porous asphalt apron Porous asphalt path Area of archaeological concern Capital Reduced width Design shoulder Advisory Presentation March 30, 2016 Boardwalk 11

  12. Proposed Typical Section Near Areas of Archaeological Concern MD 5 Pedestrian and Bike Path Capital Design Advisory Possible Archaeological Resources Presentation March 30, 2016  CAMPUS Looking Southward RIVER  12

  13. Schedule: MD 5 Pedestrian • Currently: final design and permitting and Bike • Construction: Spring-Summer 2017 Path Cost: $1,741,000 Federal Grant $ 435,000 State Funds Capital $2,126,000 Total Design Advisory Presentation March 30, 2016

  14. New Academic Building & Auditorium New Varsity Fields & Stadium Capital Design Advisory Presentation March 30, 2016 14

  15. Rationale  Lack of laboratories for STEM programs (26% deficit) New  Inadequate facilities for Fine and Performing Arts Academic Building &  Insufficient Study Space (20% deficit) Auditorium  No large assembly/performance venue (45% space deficit = 712 seats) Capital Design Advisory Presentation March 30, 2016 15

  16. New Academic Building  Education Studies New o More space for M.Ed. Program Academic Building & o Labs for STEM in Goodpaster Hall Auditorium  Learning Commons o Modern Collaborative Study Space o Technology and Media Enhanced Project Space Capital Design  Music Academic Program Advisory Presentation o Adequate rehearsal space March 30, 2016 o Acoustic improvements

  17. 700-seat Auditorium  • Lunch-time concert series Cultural Impact • High school graduations New • Twain Lecture Series Academic Building & • Bradlee Lecture Series Auditorium • Reeves Lecture Series • Arts Alliance events • Visiting artists performances • TFMS Film Festival • Natural Science and Mathematics Capital Colloquium Design • Center for the Study of Advisory Presentation Democracy Lectures March 30, 2016 • College Open Houses • Messiah Concert

  18. 700-seat Auditorium  Economic Impact (Conferences and Hospitality) New o Navy Alliance Academic o Patuxent Partnership Building & Auditorium o Corporate and Government Events o High School use Capital Design Advisory Presentation March 30, 2016

  19. Site Plan New Academic Building & Auditorium New Glendening O’Brien Academic Hall ARC Building & Auditorium Waring Varsity Montgomery Commons Schaefer Fields & Hall Hall Goodpaster Stadium Hall Lewis Quad Capital Design Advisory • Strengthens and extends the Academic core; links to Waring Commons Presentation March 30, 2016 19

  20. Site Plan New Academic Building & Auditorium New Glendening O’Brien Academic Hall ARC Building & Auditorium Waring Varsity Montgomery Commons Schaefer Fields & Hall Hall Goodpaster Stadium Hall Lewis Quad Capital Design Advisory • Strengthens and extends the Academic core; links to Waring Commons Presentation • Locates Auditorium’s bulk near O’Brien ARC and close to parking March 30, 2016 20

  21. Site Plan New Academic Building & Auditorium New Glendening O’Brien Academic Hall ARC Building & Auditorium Waring Varsity Montgomery Commons Schaefer Fields & Hall Hall Goodpaster Stadium Hall Lewis Quad Capital Design Advisory • Strengthens and extends the Academic core; links to Waring Commons Presentation • Locates Auditorium’s bulk near O’Brien ARC and close to parking March 30, 2016 • Creates an outdoor space framed by the Crescent townhouses 21

  22. Site Plan New Academic Building & Auditorium New Glendening O’Brien Academic Hall ARC Building & Auditorium Waring Varsity Montgomery Commons Schaefer Fields & Hall Hall Goodpaster Stadium Hall Lewis Quad Capital Design Advisory • Strengthens and extends the Academic core; links to Waring Commons Presentation • Locates Auditorium’s bulk near O’Brien ARC and close to parking March 30, 2016 • Creates an outdoor space framed by the Crescent townhouses • Least costly Master Plan option 22

  23. Site Plan New Varsity Fields & Stadium New Academic Expanded Parking Building & Auditorium Varsity Fields & Stadium Turf Field Capital Grass Field Design Advisory Presentation March 30, 2016 23

  24. Concept view New Varsity Fields & Stadium New Varsity Fields & Stadium Capital Design Advisory Presentation March 30, 2016 24

  25. New Varsity Fields & Stadium Schedule: New Archaeology: Summer 2016 Academic Building & Design: Winter 2017 Auditorium Construction: Summer 2018 to Summer 2019 Varsity Fields & New Academic Building & Auditorium Stadium Schedule: Capital Design: Winter 2017 - Spring 2018 Design Advisory Construction: Summer 2019 - Winter 2021 Presentation March 30, 2016 25

  26. New Academic Building and Auditorium New Varsity Fields & Stadium New Academic Building & Cost: Auditorium $ 73.5million State Capital Funds Varsity $ 2.5million From non-state sources Fields & $ 76 million Stadium Capital Design Advisory Presentation March 30, 2016 26

  27. New Campus Entrance Sign Capital Design Advisory Presentation March 30, 2016 27

  28. Campus Entry Sign Capital Design Advisory Admissions Presentation March 30, 2016 28

  29. Campus Entry Sign Capital Design Advisory Presentation March 30, 2016 29

  30. Campus Entry Sign Capital Design Advisory Brick Base Slate with etched lettering Presentation March 30, 2016 30

  31. Campus New Campus Entrance Sign Entry Sign Schedule: Design: Summer 2016 Installation: Early Spring 2017 Capital Design Advisory Presentation March 30, 2016 31

  32. New Sidewalk for Trinity Church Road Capital Design Advisory Presentation March 30, 2016 32

  33. Kent Hall Trinity Church Road New Crosswalk Sidewalk Parish River Hall Center New Brick Sidewalk Capital Design Advisory Presentation March 30, 2016 33

  34. Trinity Church Road Sidewalk Boat House River Center New Curb and Gutter, Capital Brick Sidewalk Design Advisory Presentation Trinity Church Road March 30, 2016 34

  35. Trinity New Sidewalk for Trinity Church Road Church Road Sidewalk Schedule: Design: Fall 2016 Construction: Summer 2017 Cost: Capital Design $ 229,000 State Capital Budget FY17 Advisory Presentation March 30, 2016 35

  36. Solar Projects on Campus Capital Design Advisory Presentation March 30, 2016 36

  37. Solar Carports Solar Projects Capital Design Advisory Presentation March 30, 2016 37

  38. Solar Carports At Lot R Solar Projects Capital Design Advisory Presentation March 30, 2016 38

  39. Rooftop Solar Panels Solar at the Projects O’Brien ARC Arena Roof Michael P. O’Brien Athletic and Recreation Center Pool Roof Capital Glendening Hall Design Advisory Presentation March 30, 2016 39

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.