Capital Design Advisory Committee March 30, 2016 1 Route 5 Traffic Calming Phase II Update AGENDA New Academic Building & Auditorium New Varsity Fields & Stadium New Campus Entrance Sign New Sidewalk for Trinity Church


slide-1
SLIDE 1

Capital Design Advisory Committee

March 30, 2016

1

slide-2
SLIDE 2

2

  • Route 5 Traffic Calming Phase II Update
  • New Academic Building & Auditorium

New Varsity Fields & Stadium

  • New Campus Entrance Sign
  • New Sidewalk for Trinity Church Road
  • New solar power arrays on campus and at

HSMC’s Mattapany /Kohut Way property.

Capital Design Advisory Presentation

March 30, 2016

AGENDA

slide-3
SLIDE 3

3

Route 5 Traffic Calming Phase II

Capital Design Advisory Presentation

March 30, 2016

slide-4
SLIDE 4

4 Capital Design Advisory Presentation

March 30, 2016

MD 5 Pedestrian and Bike Path

Route

Initial Layout Revised Path

slide-5
SLIDE 5

>2’-0”

5

Purpose: Provide a safe path for pedestrians and bicyclists between the main campus and the north field.

Capital Design Advisory Presentation

March 30, 2016

MD 5 Pedestrian and Bike Path

slide-6
SLIDE 6

6 Capital Design Advisory Presentation

March 30, 2016

MD 5 Pedestrian and Bike Path

Challenges & Partners:

 Environmental stewardship  Preservation of archaeological resources  Access for the disabled  MD 5 traffic flow  Multiple regulatory overlays

slide-7
SLIDE 7

7 Capital Design Advisory Presentation

March 30, 2016

Southern Section: St. John’s Pond to Yaocomaco Dr.

Reduced width shoulder New curb Porous asphalt sidewalk New crosswalk Rebuilt brick sidewalk, Transition to porous asphalt

QUEEN ANNE HALL

BRIDGE AT ST. JOHN’S POND

Area of archaeological concern

slide-8
SLIDE 8

8 Capital Design Advisory Presentation

March 30, 2016

MD 5 Pedestrian and Bike Path

Proposed Typical Section

  • St. John’s Pond to Yaocomaco Drive

 CAMPUS Looking Southward RIVER 

slide-9
SLIDE 9

9 Capital Design Advisory Presentation

March 30, 2016

Center Section: Yaocomaco Drive to Boardwalk

ADMISSIONS COBB HOUSE Porous asphalt path Crosswalk Boardwalk Reduced width shoulder FISHER’S CREEK

slide-10
SLIDE 10

10 Capital Design Advisory Presentation

March 30, 2016

MD 5 Pedestrian and Bike Path

3.5’ Minimum Clearance

Proposed Typical Section

Boardwalk at Fisher’s Creek

Looking Southward RIVER 

slide-11
SLIDE 11

11 Capital Design Advisory Presentation

March 30, 2016

New porous asphalt apron NORTH FIELD Boardwalk Reduced width shoulder Area of archaeological concern Porous asphalt path

Northern Section: Boardwalk to North Field

slide-12
SLIDE 12

12 Capital Design Advisory Presentation

March 30, 2016

MD 5 Pedestrian and Bike Path

Proposed Typical Section

Near Areas of Archaeological Concern

Possible Archaeological Resources

 CAMPUS Looking Southward RIVER 

slide-13
SLIDE 13

Schedule:

  • Currently: final design and permitting
  • Construction: Spring-Summer 2017

Cost: $1,741,000 Federal Grant $ 435,000 State Funds $2,126,000 Total

Capital Design Advisory Presentation

March 30, 2016

MD 5 Pedestrian and Bike Path

slide-14
SLIDE 14

14

New Academic Building & Auditorium New Varsity Fields & Stadium

Capital Design Advisory Presentation

March 30, 2016

slide-15
SLIDE 15

15

Rationale

  • Lack of laboratories for STEM programs (26% deficit)
  • Inadequate facilities for Fine and Performing Arts
  • Insufficient Study Space (20% deficit)
  • No large assembly/performance venue

(45% space deficit = 712 seats)

Capital Design Advisory Presentation

March 30, 2016

New Academic Building & Auditorium

slide-16
SLIDE 16
  • Education Studies
  • More space for M.Ed. Program
  • Labs for STEM in Goodpaster Hall
  • Learning Commons
  • Modern Collaborative Study Space
  • Technology and Media Enhanced

Project Space

  • Music Academic Program
  • Adequate rehearsal space
  • Acoustic improvements

New Academic Building

Capital Design Advisory Presentation

March 30, 2016

New Academic Building & Auditorium

slide-17
SLIDE 17

Capital Design Advisory Presentation

March 30, 2016

  • Cultural Impact
  • Lunch-time concert series
  • High school graduations
  • Twain Lecture Series
  • Bradlee Lecture Series
  • Reeves Lecture Series
  • Arts Alliance events
  • Visiting artists performances
  • TFMS Film Festival
  • Natural Science and Mathematics

Colloquium

  • Center for the Study of

Democracy Lectures

  • College Open Houses
  • Messiah Concert

New Academic Building & Auditorium

700-seat Auditorium

slide-18
SLIDE 18

700-seat Auditorium

Capital Design Advisory Presentation

March 30, 2016

  • Economic Impact (Conferences and Hospitality)
  • Navy Alliance
  • Patuxent Partnership
  • Corporate and Government Events
  • High School use

New Academic Building & Auditorium

slide-19
SLIDE 19

Site Plan

New Academic Building & Auditorium

19 Capital Design Advisory Presentation

March 30, 2016

New Academic Building & Auditorium Varsity Fields & Stadium

O’Brien ARC Goodpaster Hall Schaefer Hall Waring Commons Lewis Quad Montgomery Hall Glendening Hall

  • Strengthens and extends the Academic core; links to Waring Commons
slide-20
SLIDE 20

Site Plan

New Academic Building & Auditorium

20 Capital Design Advisory Presentation

March 30, 2016

New Academic Building & Auditorium Varsity Fields & Stadium

O’Brien ARC Goodpaster Hall Schaefer Hall Waring Commons Lewis Quad Montgomery Hall Glendening Hall

  • Strengthens and extends the Academic core; links to Waring Commons
  • Locates Auditorium’s bulk near O’Brien ARC and close to parking
slide-21
SLIDE 21

Site Plan

New Academic Building & Auditorium

21 Capital Design Advisory Presentation

March 30, 2016

New Academic Building & Auditorium Varsity Fields & Stadium

O’Brien ARC Goodpaster Hall Schaefer Hall Waring Commons Lewis Quad Montgomery Hall Glendening Hall

  • Strengthens and extends the Academic core; links to Waring Commons
  • Locates Auditorium’s bulk near O’Brien ARC and close to parking
  • Creates an outdoor space framed by the Crescent townhouses
slide-22
SLIDE 22

Site Plan

New Academic Building & Auditorium

22 Capital Design Advisory Presentation

March 30, 2016

New Academic Building & Auditorium Varsity Fields & Stadium

O’Brien ARC Goodpaster Hall Schaefer Hall Waring Commons Lewis Quad Montgomery Hall Glendening Hall

  • Strengthens and extends the Academic core; links to Waring Commons
  • Locates Auditorium’s bulk near O’Brien ARC and close to parking
  • Creates an outdoor space framed by the Crescent townhouses
  • Least costly Master Plan option
slide-23
SLIDE 23

23 Capital Design Advisory Presentation

March 30, 2016

New Academic Building & Auditorium Varsity Fields & Stadium

Turf Field Grass Field Expanded Parking

Site Plan

New Varsity Fields & Stadium

slide-24
SLIDE 24

24 Capital Design Advisory Presentation

March 30, 2016

New Varsity Fields & Stadium

Concept view

New Varsity Fields & Stadium

slide-25
SLIDE 25

25

New Varsity Fields & Stadium

Schedule: Archaeology: Summer 2016 Design: Winter 2017 Construction: Summer 2018 to Summer 2019

New Academic Building & Auditorium

Schedule: Design: Winter 2017 - Spring 2018 Construction: Summer 2019 - Winter 2021

Capital Design Advisory Presentation

March 30, 2016

New Academic Building & Auditorium Varsity Fields & Stadium

slide-26
SLIDE 26

26

New Academic Building and Auditorium New Varsity Fields & Stadium

Cost: $ 73.5million State Capital Funds $ 2.5million From non-state sources $ 76 million

Capital Design Advisory Presentation

March 30, 2016

New Academic Building & Auditorium Varsity Fields & Stadium

slide-27
SLIDE 27

27

New Campus Entrance Sign

Capital Design Advisory Presentation

March 30, 2016

slide-28
SLIDE 28

28

Admissions

Capital Design Advisory Presentation

March 30, 2016

Campus Entry Sign

slide-29
SLIDE 29

29 Capital Design Advisory Presentation

March 30, 2016

Campus Entry Sign

slide-30
SLIDE 30

30 Capital Design Advisory Presentation

March 30, 2016

Campus Entry Sign Brick Base Slate with etched lettering

slide-31
SLIDE 31

31

New Campus Entrance Sign

Schedule: Design: Summer 2016 Installation: Early Spring 2017

Capital Design Advisory Presentation

March 30, 2016

Campus Entry Sign

slide-32
SLIDE 32

32

New Sidewalk for Trinity Church Road

Capital Design Advisory Presentation

March 30, 2016

slide-33
SLIDE 33

33 Capital Design Advisory Presentation

March 30, 2016

Trinity Church Road Sidewalk

New Brick Sidewalk New Crosswalk

Kent Hall Parish Hall River Center

slide-34
SLIDE 34

34

River Center Trinity Church Road New Curb and Gutter, Brick Sidewalk

Boat House

Capital Design Advisory Presentation

March 30, 2016

Trinity Church Road Sidewalk

slide-35
SLIDE 35

35

New Sidewalk for Trinity Church Road

Schedule: Design: Fall 2016 Construction: Summer 2017 Cost: $ 229,000 State Capital Budget FY17

Capital Design Advisory Presentation

March 30, 2016

Trinity Church Road Sidewalk

slide-36
SLIDE 36

36

Solar Projects on Campus

Capital Design Advisory Presentation

March 30, 2016

slide-37
SLIDE 37

37

Solar Carports

Capital Design Advisory Presentation

March 30, 2016

Solar Projects

slide-38
SLIDE 38

38

Solar Carports At Lot R

Capital Design Advisory Presentation

March 30, 2016

Solar Projects

slide-39
SLIDE 39

39 Capital Design Advisory Presentation

March 30, 2016

Solar Projects

Glendening Hall

Pool Roof Arena Roof

Rooftop Solar Panels at the O’Brien ARC

Michael P. O’Brien Athletic and Recreation Center

slide-40
SLIDE 40

40

College Solar Projects

Schedule: Design: Summer 2016 Construction: Fall 2017 - Winter 2017 Costs: Power Purchase Agreement will fund the installation of the equipment. MEA grant funds four (4) EV charging stations. Decision to be based on financial evaluation.

Capital Design Advisory Presentation

March 30, 2016

Solar Projects

slide-41
SLIDE 41

41

HSMC Solar Arrays

Capital Design Advisory Presentation

March 30, 2016

Solar Projects

slide-42
SLIDE 42

42 Capital Design Advisory Presentation

March 30, 2016

Solar Projects

slide-43
SLIDE 43

43 Capital Design Advisory Presentation

March 30, 2016