cape town
play

Cape Town December 2011 February 2017 Page 1 Page 1 Overview - PowerPoint PPT Presentation

Avocet Mining PLC Cape Town December 2011 February 2017 Page 1 Page 1 Overview Page 2 Page 2 Overview of projects Inata Gold Mine Producing mine with exploration o potential Inata Mineral Resources of 3.3 o Moz, excluding Souma


  1. Avocet Mining PLC Cape Town December 2011 February 2017 Page 1 Page 1

  2. Overview Page 2 Page 2

  3. Overview of projects Inata Gold Mine Producing mine with exploration o potential Inata Mineral Resources of 3.3 o Moz, excluding Souma Reserve of 340k oz, LoMP runs to o end 2019 Souma, Pali and Ouzeni Deposits Souma deposit 20km from Inata process o plant – currently 0.7Moz US$11-14m funding needed to add Souma o and other satellite deposits to Inata LoMP Target is to add 5-600k oz reserve and 5-7 o years to the mine life Tri-K Development Project o Exploitation permit granted 27 March 2015, Mining Convention signed 19 Dec 2016 o Joint Venture signed with Managem in October 2016 to complete a feasibility study for a CIL project with a 1m oz reserve by Q1 2018 – leaving Avocet with 30% interest o Construction capex expected to be US$200-300m Page 3

  4. Avocet Group Avocet Mining • Corporate head office • London and Oslo listing PLC - UK head office Souma and Tri-K project - Inata Gold Mine Ouzeni/Pali – Guinea – Burkina Faso Burkina Faso • In production since 2009 • Satellite deposits to Inata – • Mining permit for Heap Leach • 3 yrs of reserves remaining, 240k under exploration permits granted March 2015 • Souma most prospective – 675k • JV signed with Managem Oct 2016 oz at cash cost of cUS$900/oz (75- • Managem to obtain 70% interest by 85k oz pa) resource, expected to increase, • Debts of US$60m - bank debt of 20km from site. completing BFS for a CIL plant, • Funding of US$10-12m US$24m (Ecobank and Coris), trade increasing reserve to 1moz and creditors of US$29m, government exploration capex required investing US$10m • Ouzeni/Pali 15km from Inata • Capex for CIL plant est US$200- debts of US$7m • Funding of US$1-2m 300m . Avocet to contribute its post- exploration and capex required debt share to retain 30% interest Page 4

  5. Listed on London and Oslo Share price Au US$/oz AVM share price v Gold Price 2016 (pence) AVM 140 1,500 120 Gold price 1,400 Ticker: AVM.L 100 1,300 80 60 1,200 40 1,100 20 Ticker: AVM.OL 1,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Listing date: London – Dec 2011 (previously AIM) Oslo Børs – June 2010 Shares in issue: 20,949,671 Market capitalisation : US$16m Elliott 1 Major shareholder: 13.5% 5 th Floor, 15 Old Bailey, London EC4M 7EF Registered office: 1 Elliott is also interested in Ordinary Shares held through contracts for difference (CFDs), representing a further 14.2% of the Compa ny’ s issued share capital Page 5

  6. Burkina Faso – Inata, Bélahouro and Souma Page 6 Page 6

  7. Burkina Faso – 8 mines in operation Inata located c 200km North of Ouagadougou in the Soum province. Access is via road, and takes c 6hrs Page 7

  8. Inata • Inata commenced production in Dec 2009 – after initial success, combination of falling gold prices, rising costs, and metallurgical issues impacted profitability and reduced profitability • Focus since 2013 has been reducing costs, however this has also limited expansion work to extend mine life • Latest Inata LoMP shows reserve of 340k oz, and production continuing to 2019 but not beyond – which will make repaying the mine’s US$60m of creditors challenging • Additional deposits identified at Souma and Pali/Ouzeni – which require US$11-14m of funding to be developed • Souma/Ouzeni/Pali targeted to add 500-600k oz production and extend mine life by 5-7 years – significantly improving economics of the mine, and the prospects for shareholders and creditors Page 8

  9. Inata production – past, future and potential Inata historic actuals '000 oz US$/oz Targeted production from Inata LoMP 180 1,600 (reserve) new deposits (unverified) 160 1,400 140 1,200 120 1,000 Pali/ 100 Souma 800 Ouzeni 80 600 60 400 40 200 20 0 - 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Production Cash cost Av realised gold price Page 9

  10. Overview – plan of mine area • Open pit mining across five main pits (Inata North, Central, South-East, Far South and Minfo) • Owner-operator mining fleets – although equipment is ageing North Pit • Processing via conventional CIL plant – nameplate capacity 1.6mtpa Plant • Original mine licence covered 26km 2 - TMF1 Central Pit increased by 50% in 2014 • Water sourced from purpose-built barrage (Gomdé) TMF2 South Pit • Site includes office block, accommodation camps, canteen etc Minfo Pit Filio Page 10

  11. Inata – 2017 outlook and challenges • Production expected 75-85,000 oz at cash cost US$900- 1,000/oz • Key challenges are: Creditor pressure - Security threat – incidents have increased in Sahel region - Mechanical availability of mine fleet and plant - Tight margins in the context of volatile gold prices - Legal issues with workforce - Royal gold – disputed US$7m - • Mine has total debts of cUS$60m as at 31 January 2017 Ecobank loan - c US$20m – repayable c US$1m per mth - until Oct 2018 Coris Bank - 2.5bn CFA loan (US$4m) granted Oct 2016 - - repayment due end Mar 2017 Inata LoMP, excluding Souma & Pali/Ouzeni, runs to 2019. At current Trade creditors of US$28m at 31 Jan 2017 - gold prices, cash generated will Further US$1m due to as bank drafts (invoice advances) - contribute to reducing substantially, but not repaying in full, the mine’s US$1m of government royalties/taxes outstanding - debts. US$6m due in respect of restoration bond - Page 11

  12. Inata and satellite deposits 5km Souma Filio Pali Ouzeni Page 12

  13. Souma – overview • 20km from Inata Mine – within hauling distance across flat terrain • 16 km gold in saprolite anomaly 2km Dynamite • Mineral Resource currently 0.7Moz. at 1.81 g/t Gomde • High grade core of +2 g/t material Barrage Miilam • Entirely different geological setting – quartz N’Darga North hosted gold, no preg-robbing characteristics as seen at Inata Miilam Central Miilam South Page 13

  14. Souma - location 20km from Inata plant INATA PIT MINERALIZED SOUMA ZONE 0.7 Moz Au QUARTZ VEINS GOMBE DAM/ IMPOUNDMENT PERMIT BOUNDARY INATA MINE 2.5 Km FILIO, PALI, OUZENI BELAHOUROU 0.48 Moz Au Page 14

  15. Souma – current resource CLASS Tonnes Grade Au (g/t) Metal (ozs) Measured - - - Indicated 2,410,000 2.32 179,500 Meas+Indicated 2,410,000 2.32 179,500 Inferred 9,220,000 1.67 496,100 Meas+Ind+Inf 11,630,000 1.81 675,600 • A total of 676koz have been defined at Souma within five deposits • Upgrade in resource on Dynamite targeted – increase of some 100-200k ounces realistic once work complete Page 15

  16. Satellite deposit for Inata • Processing strategy for Souma is that it will serve as a satellite deposit for Inata • Ore will be trucked c 20km to Inata plant for treatment • Feasibility study will confirm details of metallurgy, costs etc • High level estimates have assumed US$4 per tonne additional haulage for the ore • US$10-12m funding needed: • US$5-7m to complete drilling and documentation for feasibility study and permit application by end 2017 US$5m capex (haul road, enhancements to • crusher, pit works) US$10-12m needed to bring Souma into production by 2020 – potentially adding 3 years of production to Inata mine life Page 16

  17. Ouzeni/Pali • Ouzeni/Pali – located 7-8km SE/7km SW of the plant respectively. • Although both lie outside the Inata mining permit, it is hoped that the government would allow an extension to the permit area to include these deposits, without the need for a full feasibility study. • A drilling campaign estimated to cost US$1-2m would be required to confirm the existing 5m tonnes of inferred resource at 1.61g/t (270k ounces) • However reserves of 100-150k ounces would not be an unreasonable outcome. Deposit Classification Tonnes Au g/t Ounces 590,000 1.81 34,400 Measured 770,000 1.29 31,900 Indicated 1,360,000 1.52 66,300 Filio Meas + Ind 1,860,000 1.39 83,400 Inferred 3,220,000 1.45 149,700 Total 2,260,000 1.83 133,500 Inferred Pali 2,260,000 1.83 133,500 Total 2,930,000 1.45 136,200 Inferred Ouzeni 2,930,000 1.45 136,200 Total Page 17

  18. Guinea – Tri-K Page 18 Page 18

  19. Tri-K location – in Siguiri basin Severstal Anglogold Ashanti (Lefa – 5.9Moz Au) (Siguiri – 5.6Moz Au) Sovereign Mines of Africa (Mandiana – 0.6Moz Au) Cassidy Kolenda Avocet (Kouroussa – 1.0Moz Au) Balandougou (TriK – 3.0Moz Au) Tri-K Permits Kankan Conakry SEMAFO (Kiniero – 0.9Moz Au) Burey Gold (Mansounia – 0.8Moz Au) Birimian geology Wega Mining Guinée permits 50km Deposit size (production + resource) Page 19

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend