SLIDE 1
Californias Desert Renewable Energy Conservation Plan What it Means - - PowerPoint PPT Presentation
Californias Desert Renewable Energy Conservation Plan What it Means - - PowerPoint PPT Presentation
Californias Desert Renewable Energy Conservation Plan What it Means for Wind and Solar in Southern California 2 8 J a n u a r y 2 0 1 5 Presenter: Andrew C. Bell Partner, Marten Law San Francisco E - abell@martenlaw.com D - 415 . 684
SLIDE 2
SLIDE 3
Andrew C. Bell
Presenter: Partner, Marten Law San Francisco E - D - abell@martenlaw.com 415 . 684 . 9350
SLIDE 4
DRECP 22.5 Million acres Renewables species permitting Conservation Comments due 23 Feb. 2015
SLIDE 5
Outline
Background Basic Framework Land Use Categories Alternatives Permitting Process Implications for Wind and Solar
SLIDE 6
Background – Origin of the DRECP
17 November 2008 Memorandum of Understanding among:
- California Energy Commission
- California Department of Fish & Wildlife
- United States Fish & Wildlife Service
- Bureau of Land Management
Creation of the Renewable Energy Action Team (REAT)
SLIDE 7
Basics – What is it Made of?
Draft DRECP published on 26 September 2014. A combined programmatic document consisting of:
- Proposed BLM Land Use Plan Amendment (LUPA)
- Proposed USFWS General Conservation Plan (GCP)
- Proposed CDFW Natural Community Conservation Plan (NCCP)
- NEPA draft EIS with USFWS and BLM co-lead agencies
- CEQA draft EIR with CEC lead agency
SLIDE 8
Basics – Covered Activities
Pre-construction, Construction, O&M and Decommissioning of:
- Solar (PV and thermal)
- Wind
- Geothermal
- Transmission within existing corridors
- Gen-ties
- Substations and switchyards
Conservation activities
- Includes implementation of project mitigation.
SLIDE 9
Basics – Covered Species
37 Covered species.
- 23 currently listed under CESA or FESA, including desert tortoise,
mohave ground squirrel, Yuma clapper rail, Bakersfield cactus.
- 7 California fully protected species, including golden eagle and
California condor.
- “No surprises” assurances for 14 species not yet listed.
SLIDE 10
Basics– Incidental Take Permitting Paths
Permitting Mechanism Varies by Lands and Statutes Involved: Federal Endangered Species
- GCP if no federal nexus
- FESA Section 7 if federal nexus
California Endangered Species
- NCCP
County participation
SLIDE 11
Land Use Categories
Development Focus Areas DRECP Plan-Wide Reserve Lands Study Area Lands
SLIDE 12
Development Focus Areas
Lands within which Streamlined Incidental Take Authorization Under the DRECP can Occur.
- Primary streamlining advantage is for private land projects lacking
a federal nexus.
- Potential for NEPA/CEQA tiering.
SLIDE 13
Study Area Lands
Lands within DRECP but not (yet) covered by DRECP:
- Future Assessment Areas – potential subsequent DRECP
amendment.
- Special Analysis Areas – designation decided in Final DRECP.
- Variance Lands – BLM Solar PEIS.
SLIDE 14
DRECP Plan-Wide Reserve Lands
Existing conservation areas. BLM Land Use Plan Amendment Conservation Designations:
- National Landscape Conservation System (NLCS)
- Areas of Critical Environmental Concern (ACECs)
- Wildlife Allocations
Conservation Planning Areas.
SLIDE 15
Preferred Alternative 2,024,000 acres of DFAs
SLIDE 16
Preferred Alternative Acreage by DFA
SLIDE 17
Alternative 1 1,070,000 acres of DFAs
SLIDE 18
Alternative 2 2,473,000 acres of DFAs
SLIDE 19
Alternative 3 1.4 million acres of DFAs
SLIDE 20
Alternative 4 1.6 million acres of DFAs
SLIDE 21
No Action Alternative 6,285,000 acres available for development
SLIDE 22
Permitting Inside DFAs
SLIDE 23
Avoidance and Mitigation Conservation Management Actions (CMAs)
SLIDE 24
Some survey requirements would vary by location. Desert tortoise example.
SLIDE 25
Permitting – BLM Grandfathering Provisions
Certain BLM projects within a DFA are exempt from the DRECP.
- Projects with a ROD before publication of Draft DRECP.
- Projects located within a SEZ that are “pending projects” under the
Solar PEIS.
- Projects with a draft EIS published no later than 25 November
2014, with limitations.
SLIDE 26
Implications - Wind
SLIDE 27
Implications - 4,000 MW of wind through 2040 instead
- f 12,500 MW
70% of potential wind
- ff limits
SLIDE 28
Implications - Solar
Of 2 million acres sought by LSA and CEERT, less than half would be available under the preferred DRECP alternative. Remainder rejected on the basis of resource conflicts. 575,000 acres of BLM variance lands would be placed off limits as well, leaving a remainder of 13,000 acres.
SLIDE 29
Implications – Avoidance and Mitigation Requirements
SLIDE 30
Implications – Riparian Setback Example
SLIDE 31
Implications – Riparian Setback Example
SLIDE 32
Implications – Riparian Setback Example
SLIDE 33
Implications – Riparian and Dune Setback Example
SLIDE 34
Implications – “Soft Zoning”
DRECP compliance mandatory on BLM lands. Technically voluntary on private lands, but less so in practice. Projects deemed inconsistent with DRECP goals likely subject to lengthier, more restrictive review by USFWS and CDFW, with greater risk of challenge.
SLIDE 35
Implications – The need for a robust, project- level “rebuttable presumption” framework.
SLIDE 36
Implications - Interagency Plan-Wide Conservation Priority Areas
SLIDE 37
Conclusion
Substantial reduction of developable land. Tightened limitations over the remainder. drecp.org drecp.databasin.org
SLIDE 38
martenlaw.com
Washington | California | Oregon | Idaho