C S S Cleveland Innerbelt Construction Schedule 2011 Winter Begin - - PowerPoint PPT Presentation

▶
c s s cleveland innerbelt construction schedule 2011
SMART_READER_LITE
LIVE PREVIEW

C S S Cleveland Innerbelt Construction Schedule 2011 Winter Begin - - PowerPoint PPT Presentation

Innerbelt Bridge Contract Group 2 Tremont Sideyard Changes November 6, 2013 C S S Cleveland Innerbelt Construction Schedule 2011 Winter Begin Construction Innerbelt CCG1 (WB Bridge) 2013 November Open CCG1 in Bi-directional (Temporary)


slide-1
SLIDE 1

C S S

Innerbelt Bridge Contract Group 2 Tremont Sideyard Changes

November 6, 2013

slide-2
SLIDE 2

C S S

Cleveland Innerbelt Construction Schedule

2011 Winter Begin Construction Innerbelt CCG1 (WB Bridge) 2013 November Open CCG1 in Bi-directional (Temporary) Condition 2014 Winter Demolition of Existing Innerbelt Bridge 2014 Winter Begin Construction Innerbelt CCG2 (EB Bridge) 2016 Fall Open CCG2 to Eastbound Traffic and CCG1 to Westbound Traffic

slide-3
SLIDE 3

C S S

January 18, 2013 Cleveland Planning Commission Approval October 24, 2013 Tremont Stakeholder Meeting November 6, 2013 Public Meeting November or December 2013 Cleveland Planning Commission Review

Schedule for Community Engagement

slide-4
SLIDE 4

C S S

Tremont / Towpath Trail

slide-5
SLIDE 5

C S S

The Sideyard (Metroparks) Towpath Trail

13th STREET

Urban Farm (Cuyahoga Co BDD) Blueberry Hill City Overlook Parking Tremont Terrace and Street Party

Tremont / Towpath Trail – CCG1 and CCG2

Old Central Viaduct Interpretive Zone

slide-6
SLIDE 6

C S S

slide-7
SLIDE 7

C S S

Tremont / Towpath Trail TREMONT TERRACE

slide-8
SLIDE 8

C S S

Tremont Towpath Section at Old Central Viaduct – Retaining Strategy

slide-9
SLIDE 9

C S S

Tremont Sideyard NATURE PLAY – CURRENT DESIGN

Nature Play Areas Swale (Vegetated Biofilter) Vegetated Buffer Zone Fencing Primary Paths Primary Entrance with Roses Underbridge Parking Park Structure and Patio (By Metroparks) W 14TH St Crossing and Entrance Open Lawn Secondary Paths Street Trees Open Lawn

slide-10
SLIDE 10

C S S

Tremont Sideyard NATURE PLAY EXAMPLES

MetroParks plan

slide-11
SLIDE 11

C S S

Tremont / Towpath Trail – CCG1 and CCG2

The Sideyard (Metroparks) Towpath Trail

13th STREET

Urban Farm (Cuyahoga Co BDD) Blueberry Hill City Overlook Old Central Viaduct Interpretive Zone Parking Tremont Terrace and Street Party

slide-12
SLIDE 12

Original

Overview:

Revised

slide-13
SLIDE 13
  • Reroute W. 14th as two-way Street
  • More intuitive arrangement of roadway at W 14th and Fairfield
  • Creates safer intersection at W 14th/Abbey and W 13th/Abbey

Original Revised

Traffic Improvements:

slide-14
SLIDE 14

Parking Improvements:

  • Relocate parking from underneath EB Viaduct to an open and secure area.
  • 2 Additional security cameras (6 total)
  • Maintain lighting levels from original design

Original Revised

slide-15
SLIDE 15

Green Space Improvements:

Original Revised

  • Increased usable park space
  • Improved pedestrian access
  • A more cohesive community park not bounded by traffic on both sides, resulting

in an improved, larger and safer community space

slide-16
SLIDE 16
slide-17
SLIDE 17

Community Involvement:

  • Wall Aesthetics (Color and Texture)
slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20

Public Comment

Your comments will be taken into consideration for the final design!

Comments are being taken until November 20, 2013. Place the provided forms in the comment box or mail to:

Ohio Department of Transportation Public Information Office 5500 Transportation Blvd. Garfield Hts., OH 44125

slide-21
SLIDE 21

Wall Treatment Options: Option 1 - Custom Block Vertical Reveal

slide-22
SLIDE 22

Wall Treatment Options: Option 2 – Ashlar Stone Wall

slide-23
SLIDE 23

Wall Treatment Options: Option 3 – Ashlar Stone w/ “green” wall along park