Javier Duarte Fermilab
A L L E X P E R I M E N T E R S M E E T I N G F E R M I L A B
J U LY 9 , 2 0 1 8
C M S A N D L H C R E P O R T
C M S L H C R E P O R T
- 1
C M S A N D L H C R E P O R T A L L E X P E R I M E N T E R S M E - - PowerPoint PPT Presentation
C M S L H C R E P O R T C M S A N D L H C R E P O R T A L L E X P E R I M E N T E R S M E E T I N G F E R M I L A B J U LY 9 , 2 0 1 8 Javier Duarte Fermilab 1 L H C & C M S S C H E D U L E LHC performing a complex program
A L L E X P E R I M E N T E R S M E E T I N G F E R M I L A B
J U LY 9 , 2 0 1 8
C M S L H C R E P O R T
Javier Duarte Fermilab
going back to high luminosity production
PU, and CMS will too in the last 5h
Apr May J une
Wk
14 15 16 17 18 19 20 21 22 23 24 25 26
Mo
2 9 16 23 30 7 14 21 28 4 11 18 25
Tu We Th F r S a S u
TS 1 R ecommissioning with beam Ascension MD 1 Whitsun 1st May VdM program Interleaved commissioning & intensity ramp up S crubbing C
1200 bunches F irst S table beams E aster β*= 90 m run β
J uly Aug
27 28 29 30 31
2 9 16 23 30 MD 2 β β*= 90 m run
We are here
Status 3b, 150b, 600b DONE 1200b DONE (4h SB) 2460b DONE VdM ALICE/LHCb 70b DONE VdM ATLAS/CMS 140b DONE (went to extra time - 22h!…) 2460b “Sandwich” postponed 90m 100ns >0.5/pb DONE 90m 50ns In progress
CERN Accelerators and Schedules
Javier Duarte Fermilab
Javier Duarte Fermilab
2 1 A S U 2 8 A S U 5 D y 1 2 D y 1 9 D y 2 6 D y 2 J u n 9 J u n 1 6 J u n 2 3 J u n 3 J u n
DDtH (87C)
5 10 15 20 25
7RtDl IntHJUDtHd LumLnRsLty (fb−1 ) C06 PUeOLPLnDUy 2nOLne LuPLnosLty
DDtD LncOuded fUoP 2018-04-17 10:54 to 2018-07-06 11:00 87C LHC DHlLvHUHd: 23.74 fb−1 C06 5HcRUdHd: 22.43 fb−1 5 10 15 20 25
C0S ,ntegrated LumLnoVLty, SS, 2018,
s = 13 TeV
CMS Luminosity Public Results
2 1 A p U 2 8 A p U 5 D y 1 2 D y 1 9 D y 2 6 D y 2 J u n 9 J u n 1 6 J u n 2 3 J u n 3 J u n
DDte (87C)
5 10 15 20 25 30
3eDk DelLveUed LuPLnosLty (Hz/nb) C06 PUeOLPLnDUy 2nOLne LuPLnosLty
DDtD LncOuded fUoP 2018-04-17 10:54 to 2018-07-06 11:00 87C
5 10 15 20 25 30
C0S 3eDk LuPLnoVLty 3er DDy, SS, 2018,
s = 13 TeV
Javier Duarte Fermilab
brought down all parts of CMS detector during the ATLAS/CMS VdM scans, two sectors of HCAL Endcap Minus (HEM15 and HEM16) could no longer be
replaced, but problem persisted)
investigating, but current understanding is that there is little hope to recover these two sectors (a total of ΔΦ = 40° on the minus side
can be opened
understood
95 99
Tracker ECAL HCAL
Muon System
CMS WGM365 Report
Javier Duarte Fermilab
Javier Duarte Fermilab
results Summary of ICHEP results was sent to CERN communication office, expected to be issued on Monday Web page with summary of CMS results ready, will go public today at 4PM:
Javier Duarte Fermilab
C M S L H C R E P O R T
Javier Duarte Fermilab
It is the last opportunity to use CASTOR, in LS2 we will replace the beampipe and it will not be compatible anymore
Javier Duarte Fermilab
ATLAS + CMS_1 VdM ALICE+LHCb 90m loss maps VdM CMS_2 VdM setup (incl ALICE)
Javier Duarte Fermilab
600b ramp up.
validated and deployed at Tier0 on June 20th.
TOTEM team starting the analysis. More news during the Run Coordination Plenary session on Wed.
physics runs
Javier Duarte Fermilab
Low PU Run
FSQ studies
1nsHt3V-fYAj236wL_AZYxtp44eaiLMNPIjds7Vy675g/edit
requested by ATLAS.
separation.
Heavy Ion Run (Nov)
Javier Duarte Fermilab
17
Collect an un-biased sample for B-physics to be reconstructed during the shutdown Started with tests enabling parking at <1034 Hz/cm2 (May 9th). Since May 11th starting at <1.4 * 1034 Hz/cm2 and since June 6th starting at < 1.6 * 1034 Hz/cm2 —> Until Jun 19th recorded ~3B of events. More information at: https://indico.cern.ch/event/738079/
The total L1A rate (optimised for 100 kHz) is below 80 kHz for the highest luminosity seen so far (2.05* 1034). It is also much more linear with pile-up than what we had in 2017. Deadtime has increased with parking ~0.5% due to the increased L1 rate
Javier Duarte Fermilab