Business Name : Dena Industrial Group Adress : Head office : Toos - - PowerPoint PPT Presentation
Business Name : Dena Industrial Group Adress : Head office : Toos - - PowerPoint PPT Presentation
Business Name : Dena Industrial Group Adress : Head office : Toos Industrial Estate, phase no.1, South kooshesh St. M ashhad, Iran Factory1 : Chenaran Industrial Estate , Sanat no.20 .Chenaran ,(M ashhad),Iran Factory2 : Toos Industrial
Content
- 1. Introduction…
… … … … … .........
- 2. Foreign business partners....
- 3. Products…
… … … … … … … … … … .
- 4. Production Phases…
… … … … ..
- 5. M achinery and equipment...
- 6. Human Resource
- 7. Quality management system
- 8. Photos…
… … … … … … … … … … … ..
- Holding - Poly Sooleh Holding includes eight company.
- With over 25 years of experience, DENA Co and POL
YSOOLEH Co.
- The production capacity of the DENA company for steel structures is 2500 tons
and Polysooleh is 5000 tons in one working shift per month.
- DENA Sooleh is located on 100,000 square meters land and has over 30,000
square meters of production facilities.
- Polysooleh is located on 150,000 square meters land and has over 60,000
square meters of production facilieties.
With
- ver
25 years of experience, DENA and Polysooleh is active in manufacturing and installation of steel structures such as industrial plants and residential-commercial high-rises. This company is currently, Using from the presence
- f
experienced engineers and technicians, who are quite knowledgeable about up to date standards and regulations. They start off the projects by calculation and design procedure for static structures which leads to preparing precise technical drawings. The production capacity of our company for manufacturing, shot blasting, transport and assembling of steel structures is over 7500 tons in one working shifts per month; This is possible only by having more than 250,000 square meters area and over 90,000 square meters of production facilities. The features which distinguish DENA Co. from other companies are: our high production capacity, high quality and speed of production and installation of
- structures. These important features are achieved by the help of its skilled
personnel, modern equipments and powerful management principles.
Business Name Representative Address Business Reg. No. Established Date Incorporated Date Business Category Business Products Factory Size Number of Employees Shinwoo Heavy Industriies Co., Ltd. Ahn,Byoung-Ku Daeji agriculture & Industrial Complex, Daeji-myeon, Changyeong-gun, Gyeongsangnam-do Tel, 055)532-8300 Fax, 055)532-8360 M oro Agriculture & Industrial Complex, Gunbuk-myeon, Haman-gun, Gyeongsangnam-do Tel, 055)5840666 Fax, 055)584-0667 609-81-595166 2003, 07, 01 2003, 06, 24 M anufacturing, Wholesale and Services Cranes, Pumps, Industrial automation equipments Land: 6,710m² / Building: 3,829m² Land: 23,140m² / Building: 10,560m² 380
Head Office Haman Factory Changyeong Haman
Projects
Projects
Certificate
Certificate
Head Office
Daeji Agriculture & Industrial Complex, Daeji-myeon, Changyeong-gun, Gyeongsangnam-do T el, 055)532-8300 Fax, 055)532-8360
Haman Factory
M oro Agriculture & Industrial Complex, Gunbuk-myeon, Haman-gun, Gyeongsangnam-do T el, 055)584-0666 Fax, 055)584-0667
■ History
- Dec. 2005 : Company established as PRIM E HEAVY INDUSTRY (Korea)
J
- an. 2006 : Company established as PRIM E HEAVY INDUSTRY (China)
- Nov. 2006 : Certificate of registration for ISO 9001
- Dec. 2013: Awarded $5 million Tower of Exports
J
- ul. 2015: Certificate of Conformity of Factory Production Control (CE M arking)
- Dec. 2015: Awarded $10 million Tower of Exports
- Feb. 2016: Certificate of registration for ISO 14001
- Feb. 2016: Research and development department established
■ Engineering (Investment Company)
J
- an. 2006 : J
UYOUNG ENGINEERING CO., L TD : 3D Structure and Shop Dwg.
HEAD OFFICE :
ADDRESS : Room 706, 17 YEOUIDAEBANG-RO 65-GIL, YEONGDEUNGPO-GU, SEOUL, KOREA (07332) CONTACT No. : TEL. +82-2-2068-3111 / FAX. +82-2-2068-3112
KOREA FACTORY
ADDRESS : 64 DEONDEURE-GIL YEOJ U-SI, GYEONGGI-DO, KOREA (12659) CONTACT No. : TEL. +82-31-882-3118 / FAX. +82-31-882-3178
CHINA FACTORY
ADDRESS : NO.1 NANNING ROAD, ECONOM IC DEVELOPM ENT ZONE, PENGLAI, SHANDONG PROVINCE, CHINA (265609) CONTACT No. : TEL. +86-535-598-0288 / FAX. +86-535-598-0266
DE SCRIPT ION SE CT ION F ACT ORY
W160 M X L250M FACTORY SIZE
KOREA FACTORY
40,000 ㎡ FACTORY AREA 1,500TON / M ONTH (18,000 TON / YEAR) FABRICATED OF STEEL STRUCTURE 500TON / M ONTH (6,000TON/ YEAR) FABRICATED OF EQUIPM ENT 2,400TON / M onth (28,000ton/ YEAR) H3,000 X W1,000 X WEB 60t X FNG 80t WELD BUIL T-UP FOR H-SHAPE
DE SCRIPT ION SE CT ION F ACT ORY
W200m x L250m F ACTORY SIZE
CHINA FACTORY
50,705 ㎡ FACTORY AREA 1,500TON / M ONTH (18,000 TON / YEAR) FABRICATED OF STEEL STRUCTURE 500TON / M ONTH (6,000TON / YEAR) FABRICATED OF EQUIPM ENT 2,400TON / M onth (28,000ton / YEAR) H3,000 X W1,000 X WEB 60t X FNG 80t WELD BUIL T-UP FOR H-SHAPE
Projects
Projects
Projects
12.7 BASF /YEOSU CFBC POWER PLANT
Projects
Certificate
China Factory
(YANTAI)
Korea Factory (YEOJ U)
- Industrial structures:
Construction of industrial plants and warehouses, such as:
SAM AN DAROU PRODUCTION PLANT
.
M ASHHAD INTERNATIONAL FINANCIAL & ECONOM ICAL CENTER P
AZH
ZAVEH CEM ENT PLANT BOJNOURD AIRPORT KHAY
AM - STEEL PLANT
- Residential and office towers:
High-rise structures , multi-storey structures, And commercial towers such as :
M ASHHAD M ALL HOTELS& COM M ERCIAL COM PLEX P
ADIDEH SHANDIZ HOTELS& COM M ERCIAL COM PLEX
- Steel bridges:
Bridges over existing highways, such as sarakhs Bridge.
- Preparation of shop drawings:
- First in the engineering management office, the plans are closely surveyed. Then
by using advanced software, the experts prepare the plans in order to obtain the approval of the clients;
- At the same time, they develop a scheduled plan of the works, volumes and
weights of different required materials, also making estimates of standards and development procedures of the plan;
- The required instructions will be issued according to the scheduled plan for the
supply of necessary materials;
- M aterial supply process: according to the client orders
- Ironwork :
- Steel Sheets is usually supplied by domestic providers such as Zob Ahan
Esfahan, M obarakeh Steel facilities and Kaavian Steel company.
- Some of the hot rolled sections that are not produced in Iran they are
purchased from reliable sources outside of Iran ensuring the client’s approval. Quality certificates of all the materials is presented to the client upon request.
- Bolts & Nuts and paint:
- Bolts, Nuts and paints are the main required materials which their specifications are
stated in the contract and usually purchased from domestic sources or imported from
- utside, according to our restrict principle of keeping our client satisfied.
- M eanwhile the interests of the client is ensured and quality certificates of the
purchase is placed at the disposal of the client.
- Testing the materials:
- All items entering the factory are inspected by the quality control department for
quantity and quality, to ensure compliance with technical specifications before being docked and transported to warehouses.
- Essentially, the issuance of factory warehouse receipt is subject to the approval
- f quality control unit.
- In addition,
samples of the imported products are sent
- ff to accredited
laboratories for additional tests in order to expand the scope of this unit’s activities to ensure satisfaction of the client.
- Cutting:
Each component of a structure is identified and cut into their suitable sizes and thickness using multiple tools, resulting in pieces with specific characteristics and edges that are later joined together according the main plan.
- Assembling:
The already cut components are joined together according to the shop drawings in an
- ther unit using special tools and equipments. Joined components are then connected
to each other by spot welding. At the end of this stage the appearance of the piece is completed.
- Welding:
Discharged components from the assembly unit are transferred to the welding units and according to the procedure specified in the technical documentation known as the Treaty of Welding Procedure S ystem are welded together.
- Cleaning:
In this stage, components are taken to another unit, where trained and experienced staff perform welding tack, cleaning and grinding activities on them. The components discharged from this stage, which are transferred to painting unit, should be free of any extra slag, spater, arc etc.
- Sand blasting/ shot blasting:
The cleaned components are transferred to sand blasting/shot blast unit and in accordance with the technical specifications of the contract are blasted with silica sand
- r steel pellets.
- Painting:
The cleaned components from the sand blasting unit must be immediately transferred to the paint shop. Different paints depending on their chemical basis or shades defined in terms of their thickness of dry film are applied on the components in a dust- free environment.
- Packing and Shipping:
The final phase of construction includes the packing of the painted parts. Our qualified personnel carry out this stage so that during the transfer no damage is ocurred, which ultimately may lead to non-compliance or failure in one of the dimensions of the parts. At the same time, placing protective material prevents damage to the paint during the
- transfer. Proper arrangement of painted pieces together maximizes the load capacity, as
well as saving the costs of the shipment.
- Installation:
steel structure pieces sent to the project site are installed by our qualified installation personnel in accordance with the approved plans.
- Inspection and supervision:
Steel structure pieces sent to the project site are inspected by our experienced personnel to comply exactly to the approved drawings.
- Planning and project control:
Loads sent to the project site are installed in accordance with approved plans and features by our qualified and skilled installation personnel
TRANSFER EQUIPM ENT
- Overhead Crane, capacities: 2, 5,
10, 16, and 25 ton; Site M obile Crane, capacity: 10 ton;
- Kato Crane, capacity: 30 ton;
- Lift Truck, capacities: 3 to 35 ton;
Number Facilities 2 Gantry Crane 37 Overhead 1 Up to 25 Ton Lift truck 1 Up to 20 Ton 1 Up to 17 Ton 2 Up to 10 Ton 2 Up to 7 Ton 2 Up to 3 Ton 1 Backbreaking Trailer 4 Insole 1 Tractor 1 Tow truck
PRODUCTION M ACHINERY
- 7 in 1 cutting and punching machine;
- Brake Press machine , capacities: 300 and 500 ton;
- Guillotine,3mm, 20 to 30 mm cutting ;
- Guillotine,2mm, 6 mm cutting ;
- Guillotine,6mm, 20 to 25 mm cutting ;
- Large Radial Press M achine;
- 60,250 ton Kick Press;
- Guillotine, 6m, 20 to 25 mm cutting capacity; M agnetic Drill;
- Z Punch; Straightener;
- Hydraulic Press, 250 ton; Box Production Line;
- Automatic H Beam Straightening Line;
PRODUCTION M ACHINERY
- Shot Blaster, 300* 300 cm, 20 nozzles; Decoiler Wheel, up to 16 mm thickness;
- Lathe, 1.5m;
- CNC Lathe;
- Beveling machines;
- Hack Saw M achine;
- Z Punch; Straightener; Hydraulic Press, 250 ton;
- Box Production Line;
- Air Cutting M achine;
- CNC Drilling M achine;
- Radial Drilling M achine ;
- Plate Straighter;
PREPRATION EQUIPM ENT
- Castellated
Beam Production M achine; Friction Saw;
- Band Saw for column cutting;
Number Facilities 2 Roll 4 63 Ton Impact Press 1 M ultifunctional 1 160 Ton Hydraulic Press 1 200 Ton 1 250 Ton 1 40 Ton 1 1.5 m exfoliation 1 Exfoliation page 2 2000 * 6 Guillotine 5 3000 * 25 2 6000 * 20 2 CNC Air Cuting 4 Straighter 17 Rail/ Electric 2 Fire Saw 1 Narrow 1 Z Punch 56 Simple manual Grinding Stone 2 walled 2 CNC Radial Drill 14 Simple Radial 2 column Radial 1 Triaxial 37 magnet
ASSEM BLE EQUIPM ENT
- Double-Nozzle Submerged
Welding M achine;
- Single-Nozzle Submerged Welding
M achine;
- Welding Rectifier;
- CO2 Welding M achine;
- Automatic Air Cutting M achine;
- Sandblasting;
- Diesel Welding M achine;
- Sandblasting Compressor;
- Automatic H Beam Welding Line;
Number Facilities 121 CO2 Welding machine 6 Electroslag 14 Submerged 1 20 mm Straighter 1 40 mm 1 M ecanical Box M aker 3 Hydraulic 2 H M aker 3 Beveling machine 2 Shot blasting machine
INACCESSIBLE EQUIPM ENT
- 400-KVA ; Emergency Power
Generator;
- CO2 Tank, capacity: 25 ton;
- 2-M W power transformer;
- Argon and oxygen tanks, capacity:
13 ton;
- Shot Blasting, 110* 150 cm, 6
nozzles;
Number Facilities 2 CO2 Tank 1 Argon 2 Oxygen 3 7.5 m³/ h Compressor 3 8.3 m³/ h 6 315 KVA Power transformer
Number personnel 2 PHD graduate 6 M Sc graduate 32 Bachelor degree 17 T echnical operator 230 Skilled workers
- IM S M anagement Systems
- ISO 9001 : 2008
- ISO 3834 - 2
- ISO 14001 : 2004
- OHSAS 18001 : 2007