MassDOT Highway Projects Briefing
for the
Briefing for the 495/MetroWest Partnership Transportation - - PowerPoint PPT Presentation
MassDOT Highway Projects Briefing for the 495/MetroWest Partnership Transportation Committee Meeting Tuesday, September 26, 2017 Overview Projects in Planning/Design Construction Projects Resurfacing Projects Recently Completed
for the
2 9/26/2017
3 9/26/2017
4 9/26/2017
slated to be advertised in FY 2020 as a design-build
from 2020-2023.
alternatives for evaluation and public comment as part of the environmental review stage of this project, in order to identify a preferred alternative.
preferred alternative will be advanced to the 25% design stage.
website providing more details on the project and anticipates holding public information meetings in the near future.
495I-90InterchangeImprovements.aspx
5 9/26/2017
6 9/26/2017
9/26/2017
($13 million) The project is at 25% design stage and listed on 2020 TIP.
interchange improvement project is at the preliminary design stage. An Interchange Modification Report was submitted to FHWA for review.
is currently programmed in FY 2018 of the Boston TIP utilizing Statewide Congestion Mitigation Air Quality (CMAQ) funds.
project is at the 25% design stage and construction funding has yet to be identified.
million) The is programmed on the FY 2021 Boston TIP.
Proposed 27 Miles - Phase I ($2.3 million) Construction funding has not been identified.
25% design phase and appears on the 2019 TIP.
($2.4 million) Project is in the preliminary design phase and construction has not been identified
Project is listed on the 2020 TIP.
11 9/26/2017
changes to the ramping system and replacement of four bridges. Conceptual design
TIP in FY 2017 and was advertised on 6/24/2017. The bid opening is set for 11/7/2017.
stage and is programmed on the FY 2019 TIP with a Spring/Summer 2019 advertisement
Wayland Town Line. ($ 8 million)The project is currently at the 25% design stage is currently programmed in FY 2019 on the TIP.
25% design phase.
White Bagley Road. Total estimated project cost is $4.7 million and the project was recently advertised on 9/9/2017.
design stage and is programmed on the FY 2018 TIP with a December 2017 advertisement date.
progressing to the 75% design phase, and construction is currently unfunded.
12 9/26/2017
awarded Skanska-McCourt with the bid price of $39.6 million.
abandoned toll collection structures and roadside infrastructure no longer needed following the implementation of the 1-90 All Electronic Tolling System at Interchange 9 (Sturbridge), 10 (Auburn), 10A (Millbury), 11 (Millbury), 11A (Hopkinton), 12 (Framingham) and 13 (Framingham/Natick). The roadway will be reconstructed to accommodate vehicles using the new roadway alignment.
30, 2017 and work is currently on schedule.
13 9/26/2017
project ($9.9 million) April 2018 completion.
Spring/Summer 2018 completion.
scheduled to reopen in late 2017, with final project completion in 2018
Interstate and Related Work on I-495 (NB & SB), ($6.7 million) Project completion. April 2018 completion.
(Washington Street) Over the Assabet River. ($4.5 million) Bridge is currently closed to traffic but scheduled to reopen in October 2017, with final project completion in 2018.
Related Work on I-290 ($12.9 million) September 2018 completion.
completion
14 9/26/2017
Hudson, Washington Street Bridge
the Intersection of Routes 9 and 20. ($2 million) Contract recently awarded, August 2018 completion.
million) March 2019 completion.
290 ($14 million) August 2019 completion.
million) July 2019 project completion.
million) October 2018 completion.
15 9/26/2017
Westborough, Rte. 9 resurfacing
16 9/26/2017
17 9/26/2017
18 9/26/2017