briefing on once through cooling otc
play

Briefing on Once-Through Cooling (OTC) Dennis Peters External - PowerPoint PPT Presentation

Briefing on Once-Through Cooling (OTC) Dennis Peters External Affairs Manager ISO Board of Governors Meeting General Session July 20, 2009 The draft OTC Policy issued in March 2008 by the Water Board affects 38% of the installed generation in


  1. Briefing on Once-Through Cooling (OTC) Dennis Peters External Affairs Manager ISO Board of Governors Meeting General Session July 20, 2009

  2. The draft OTC Policy issued in March 2008 by the Water Board affects 38% of the installed generation in California. Captain Jack Malin ! 19 coastal and estuarine power Humboldt plants using OTC technology North Coast Sierra North Bay ! 16 in ISO Balancing Authority Area (BAA) Stockton Greater Bay Area ! Three in LADWP BAA Greater Fresno ! 13 in ISO transmission- To Celilo To Intermountain Kern constrained areas McCullough Diablo Canyon WEST EAST El Dorado Mohave LA Basin Big Creek ! Two nuclear plants Ventura Palo Verde SONGS San Diego SONGS USA MEXICO Slide 2

  3. Background ! Federal Clean Water Act of 1972, Section 316 (b) ! Water Board issued draft OTC policy in March 2008 ! ISO management submitted comments in May 2008 ! Implementation must ensure reliability of electric grid ! System and local reliability impacts ! Renewable integration impacts ! Timing and flexibility Slide 3

  4. CEC/CPUC/ISO submitted joint recommendations to the Water Board on May 19, 2009 ! Regional analyses versus fixed compliance schedule ! Identification of replacement infrastructure needs ! ISO analyses inform: ! CPUC procurement process ! ISO transmission planning process ! Biannual reliability review of implementation plans Final compliance will likely be a combination of generation and transmission solutions. Slide 4

  5. The Water Board incorporated the CEC/CPUC/ISO recommendations into its June 30, 2009 draft policy. 12/31/09 3/31/11 9/30/10 3/31/10 Water Board State wide Task Generator owners/ 3/31/13 Proposed Estimated Force Reports operators submit Review committee Effective Date Adoption Date Recommendations proposed reports on results to Water Board implementation of independent (becomes a bi- plans & schedules study for nuclear- annual process fueled units to thru 2021) Water Board • Nuclear-fueled units are treated differently • Costs are taken into account for efficient fossil-fueled plants and nuclear-fueled units • Regional distinctions Slide 5

  6. Management will continue to be involved throughout the process. ! Written comments ! CEC workshop on July 28 ! Public hearing on September 16 ! Statewide task force and nuclear study review committee Slide 6

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend