BRADLEY LIAISON COMMITTEE PRESENTATION 13 May 2019 ENVIRONMENTAL - PowerPoint PPT Presentation

BRADLEY LIAISON COMMITTEE PRESENTATION 13 May 2019 ENVIRONMENTAL UPDATE (from Liaison meeting in February) Christine Hogarth 2 UK National air quality objectives for the protection of human health Pollutant Applies Objective


  1. BRADLEY LIAISON COMMITTEE PRESENTATION 13 May 2019

  2. ENVIRONMENTAL UPDATE (from Liaison meeting in February) Christine Hogarth 2

  3. UK National air quality objectives for the protection of human health Pollutant Applies Objective Concentration Date to be achieved measured as by (and maintained thereafter) Particles (PM10) UK 50 µg/m3 not to be 24 hour mean 31 December 2004 exceeded more than 35 times a year UK 40 µg/m3 annual mean 31 December 2004 Particles UK (except 25 µg/m3 annual mean 2020 (PM2.5) Scotland) Exposure Reduction 3

  4. Air Quality There have been no exceedances of the UK’s air quality objectives for PM 10 or PM 2.5 recorded at the four monitoring locations around the Bradley Surface Mine 4

  5. Our Blessed Lady and St Joseph Church Continuous Air Quality Monitoring Feb to May 19 - 24 hour mean values Moisture due to foggy conditions 5

  6. Church Continuous Air Quality Monitoring 28 Feb - 1 Mar 19 hourly mean Moisture due to foggy conditions

  7. Douglas Terrace Continuous Air Quality Monitoring Feb to May 19- 24 hour mean values Moisture due to foggy conditions Moisture due to foggy conditions 7

  8. Douglas Terrace Continuous Air Quality Monitoring 29 Apr- 30 Apr 19 hourly mean Moisture due to foggy conditions

  9. 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 19- 24 hour mean values Pont Road Continuous Air Quality Monitoring Feb to May 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 50 0 20/02/2019 21/02/2019 22/02/2019 23/02/2019 24/02/2019 25/02/2019 26/02/2019 Total particles (ug/m^3) 27/02/2019 28/02/2019 01/03/2019 02/03/2019 03/03/2019 04/03/2019 conditions Moisture due to foggy 05/03/2019 06/03/2019 07/03/2019 PM10 particles (ug/m^3) 08/03/2019 09/03/2019 10/03/2019 11/03/2019 Pont Road 12/03/2019 13/03/2019 14/03/2019 15/03/2019 PM2.5 particles (ug/m^3) 16/03/2019 17/03/2019 18/03/2019 19/03/2019 20/03/2019 21/03/2019 22/03/2019 23/03/2019 24/03/2019 PM1 particles (ug/m^3) 25/03/2019 26/03/2019 27/03/2019 28/03/2019 29/03/2019 30/03/2019 31/03/2019 01/04/2019 02/04/2019 03/04/2019 04/04/2019 05/04/2019 9

  10. Pont Road Continuous Air Quality Monitoring 28 Feb -1 Mar 19- hourly mean Moisture due to foggy conditions 10

  11. Low Bradley Continuous Air Quality Monitoring Feb to May 19 - 24 hour mean values Low Bradley 1400 1350 1300 1250 1200 Moisture due to foggy 1150 conditions 1100 1050 1000 950 900 850 800 750 700 650 600 550 500 450 400 350 300 250 200 150 100 50 0 Total particles (ug/m^3) PM10 particles (ug/m^3) PM2.5 particles (ug/m^3) PM1 particles (ug/m^3) 11

  12. Low Bradley Continuous Air Quality Monitoring 19 Apr 19- hourly mean Moisture due to foggy conditions 12

  13. Planning Condition - Site Noise Limits Condition 32 Noise emitted from operations on the site shall not result in noise levels greater than those listed below, except when temporary operations are taking place. Brooms Farm 55dB L Aeq , 1Hr (free field) Pont Road 55dB L Aeq , 1Hr (free field) Douglas Terrace 50dB L Aeq , 1Hr (free field) 13

  14. Noise conditions continued Condition 33 During periods of temporary operations (soil stripping, the construction and removal of baffle mounds, soil storage mounds and spoil heaps, construction of new permanent landforms and aspects of site road construction and maintenance) the Noise Monitoring Scheme shall provide that the noise emitted from operations on the site shall not result in noise levels greater than 70 dB L Aeq , 1Hr (freefield) as measured at Brooms Farm, Pont Road and Douglas Terrace. The duration of such activities shall not exceed 8 weeks in relation to each of the respective noise monitoring properties in any 12 month period. 14

  15. Site noise complies with planning condition noise limits at the Bradley site 15

  16. Noise Monitoring Brooms Farm TOTAL NORMAL PLANNING LIMIT AMBIENT DATE TIME OPERATIONS NORMAL OPS L Aeq COMMENTS SOUND LEVEL L Aeq dB dB L Aeq dB Total ambient noise level. Road traffic noise dominant and almost constant. Some birdsong. Site 28/03/2019 14:10 58.2 55 not audible. Total ambient noise level. Road traffic dominant & almost constant, birdsong & police siren. Site 18/04/2019 15:10 60.6 55 audible at times in the very few breaks of traffic - 785's tipping sub soil on restoration area. 16

  17. Brooms Farm ambient sound levels 18 Apr 2019 Sirens 17

  18. Ambient Noise Monitoring at Pont Road TOTAL AMBIENT NORMAL PLANNING LIMIT DATE TIME SOUND LEVEL OPERATIONS COMMENTS NORMAL OPS L Aeq L Aeq dB L Aeq dB dB Total ambient sound level. Traffic main noise source - incl buses & delivery vans. 28/03/2019 09:34 68 55 Some birdsong. Site not audible Mainly road traffic & birdsong. Site audible as working in Area B - dozer tracks, 16/04/2019 08:50 65.3 51.5 55 dump trucks & PC3000 Mainly road traffic, birdsong & resident activity. PC3000 engine and occasional 18/04/2019 14:48 65.5 51.8 55 clunk of bucket audible plus occasional dozer tracks. 18

  19. Noise Monitoring at Pont Road 18 Apr 2019 Birdsong Road Traffic 19

  20. Ambient Noise Monitoring at Douglas Terrace PLANNING LIMIT TOTAL AMBIENT SOUND NORMAL OPERATIONS PLANNING LIMIT TEMPORARY OPS DATE TIME LEVEL L Aeq dB L Aeq dB NORMAL OPS L Aeq dB L Aeq dB NOTES Total ambient sound. Site audible - mainly engines & occasional dozer track. Some birdsong & 28/02/2019 10:05 Bttm of bank 45.2 50 70 constant buzz from electricity cables/pylon. Some birdsong & aircraft taken out, unable to take out all birdsong. Site audible - dump truck 19/03/2019 10:16 Bttm of bank 50.3 49.3 50 70 engines, broad band reversing alarm, occasional dozer tracks. Av wind speed 4m/s affecting reading at times. *Wind speed affected reading at top of bank - tripod fell over Total ambient sound including aircraft, road traffic & birdsong. Site audible - dump truck engines, 28/03/2019 13:11 Top of bank 49.7 50 70 occasional dozer tracks, PC3000 engine at times. Some wind noise on mic Total ambient sound including aircraft, road traffic & birdsong. Site audible - dump truck engines, 13:18 Bttm of bank 48.2 50 70 occasional dozer tracks, PC3000 engine at times. Some wind noise on mic Total ambient sound 49.8 dBA includes birdsong, aircraft & buzz from electricity cables. Aircraft 02/04/2019 08:56 Top of bank 49.8 49.3 50 70 removed giving 49.3 dBA. Site audible - PC3000 on lift 3, occasional dozer tracks & broad band reversing alarms Total ambient sound including birdsong, road traffic & resident activity in garden. Site audible - dozer 12/04/2019 15:07 Top of bank 48.5 50 70 tracks but not constant, PC3000 engines at times & occasional 1st bucket into skip Total ambient sound including birdsong, road traffic & aircraft. Site audible - dozer tracks but not 15:26 Bttm of bank 47.6 50 70 constant, PC3000 engines & broad band reversing alarms Total ambient sound including birdsong, aircraft, road traffic & buzz from electricity cables very 16/04/2019 09:42 Top of bank 47.6 50 70 noticeable. Site audible - dozer tracks but not constant & PC3000 engine audible but not dominant Total ambient sound including birdsong, aircraft, road traffic & buzz from electricity cables very 09:48 Bttm of bank 47.1 50 70 noticeable. Site audible - dozer tracks but not constant & PC3000 engine audible but not dominant Total ambient sound including birdsong, aircraft, occasional road traffic & buzz from electricity cables. 17/04/2019 10:44 Top of bank 45.7 50 70 Site audible - dozer tracks but not constant & dump trucks working on backfill & subsoil restoration. Total ambient sound including birdsong, aircraft, occasional road traffic & buzz from electricity cables. 10:50 Bttm of bank 45.2 50 70 Site audible - dozer tracks but not constant & dump trucks working on backfill & subsoil restoration. Total ambient sound including birdsong, aircraft, some road traffic & buzz from electricity cables. Site 02/05/2019 14:53 Top of bank 48.2 50 70 audible - dozer tracks & dump trucks working on backfill & subsoil restoration. Total ambient sound including birdsong, aircraft, some road traffic & buzz from electricity cables. Site audible - dozer tracks & dump trucks working on backfill & subsoil restoration plus woks in area B 14:56 Bttm of bank 42.9 50 70 20

  21. Noise Monitoring at Douglas Terrace 19 Mar 2019 Examples of birdsong 21

  22. Ambient Noise Monitoring Our Blessed Lady and St Joseph Church * TOTAL NORMAL AMBIENT DATE TIME OPERATIONS L Aeq COMMENTS SOUND LEVEL dB L Aeq dB Total ambient noise level. Traffic noise dominant, birdsong & vehicle 28/03/2019 09:55 54.2 passing church. Activity from plant workshop audible at times. Total ambient noise level. Traffic noise dominant, birdsong & aircraft. 17/04/2019 09:44 50.6 Site visible with dump trucks & dozer working on sub soil restoration area but just audible during gaps in road traffic. 22