BOARD OF SUPERVISORS 12/05/2016 Project Mission : To design a LEED - - PowerPoint PPT Presentation

board of supervisors
SMART_READER_LITE
LIVE PREVIEW

BOARD OF SUPERVISORS 12/05/2016 Project Mission : To design a LEED - - PowerPoint PPT Presentation

LINN COUNTY P U B L I C H E A L T H A N D C H I L D & Y O U T H D E V E L O P M E N T OPN Architects | West Plains Engineering | M2B Structural Engineers | Schnoor-Bonifazi Engineering & Surveying BOARD OF SUPERVISORS


slide-1
SLIDE 1

LINN COUNTY P U B L I C H E A L T H A N D C H I L D & Y O U T H D E V E L O P M E N T Project Mission : To design a LEED Platinum facility that is beautiful, healthy, and naturally lit while remaining comfortable, resilient and an asset to the community

BOARD OF SUPERVISORS

12/05/2016 OPN Architects, Inc. OPN Architects | West Plains Engineering | M2B Structural Engineers | Schnoor-Bonifazi Engineering & Surveying | 1 |

slide-2
SLIDE 2

COMMUNITY INPUT #1

| 2 |

slide-3
SLIDE 3

VISIONING SESSION

| 3 |

slide-4
SLIDE 4

VISIONING SESSION

| 4 |

slide-5
SLIDE 5

PROGRAMMING

| 4 |

slide-6
SLIDE 6

SITE DIAGRAM

| 5 |

slide-7
SLIDE 7

MASSING DIAGRAM

1

BUFFER The initial programmatic massing is aligned along 6th Street to create a buffer from heavy semi traffic

| 6 |

slide-8
SLIDE 8

MASSING DIAGRAM

2

ELEVATE The volume is elevated to protect critical function programs from the flood plain

| 7 |

slide-9
SLIDE 9

MASSING DIAGRAM

3

TUCK Child & Youth Development Services and parking are tucked under the elevated bar

| 8 |

slide-10
SLIDE 10

MASSING DIAGRAM

4

PARKIFY Green space is maximized across the site at multiple levels, contributing to a biophilic environment

| 9 |

slide-11
SLIDE 11

MASSING DIAGRAM

5

SCALE Child & Youth Development Services bar is pulled apart to return the rhythm and scale of the surrounding neighborhood

| 10 |

slide-12
SLIDE 12

MASSING DIAGRAM

6

TRANSFORM The Gym opens onto the green space, transforming the space into a community asset after hours

| 11 |

slide-13
SLIDE 13

MASSING DIAGRAM

7

SLIDE The Clinic and Lab Services are slid out from the massing to define a clear identity and wayfinding path

| 12 |

slide-14
SLIDE 14

MASSING DIAGRAM

8

PIERCE As the Clinic is slid out, a void is created allowing a direct circulation path across the site and into the building

| 13 |

slide-15
SLIDE 15

MASSING DIAGRAM

9

VEIL The south facing facades are veiled to allow natural daylighting while maintaining sustainability and controlling light pollution

| 14 |

slide-16
SLIDE 16

PLANS

| 4 |

LEVEL 1

CIRCULATION

slide-17
SLIDE 17

PLANS

| 4 |

LEVEL 1

CHILD & YOUTH DEVELOPMENT PUBLIC HEALTH

slide-18
SLIDE 18

PLANS

| 4 |

LEVEL 2

CIRCULATION

slide-19
SLIDE 19

PLANS

| 4 |

LEVEL 2

CHILD & YOUTH DEVELOPMENT PUBLIC HEALTH

slide-20
SLIDE 20

PLANS

| 4 |

LEVEL 3

CIRCULATION

slide-21
SLIDE 21

PLANS

| 4 |

LEVEL 3

CHILD & YOUTH DEVELOPMENT PUBLIC HEALTH

slide-22
SLIDE 22

AERIAL DIAGRAM

| 15 |

slide-23
SLIDE 23

MATERIALITY

| 16 |

slide-24
SLIDE 24

PERSPECTIVE

| 18 |

slide-25
SLIDE 25

PERSPECTIVE

| 17 |

slide-26
SLIDE 26

PERSPECTIVE

| 17 |

slide-27
SLIDE 27

PERSPECTIVE

| 17 |

slide-28
SLIDE 28

PERSPECTIVE

| 17 |

slide-29
SLIDE 29

PERSPECTIVE

| 17 |

slide-30
SLIDE 30

PERSPECTIVE

| 17 |

slide-31
SLIDE 31

PERSPECTIVE

| 17 |

slide-32
SLIDE 32

PERSPECTIVE

| 19 |

slide-33
SLIDE 33

COST ESTIMATE

| 19 |

slide-34
SLIDE 34

| 20 |

NEXT STEPS

APPROVE BUDGET START DESIGN DEVELOPMENT