board of supervisors
play

BOARD OF SUPERVISORS 12/05/2016 Project Mission : To design a LEED - PowerPoint PPT Presentation

LINN COUNTY P U B L I C H E A L T H A N D C H I L D & Y O U T H D E V E L O P M E N T OPN Architects | West Plains Engineering | M2B Structural Engineers | Schnoor-Bonifazi Engineering & Surveying BOARD OF SUPERVISORS


  1. LINN COUNTY P U B L I C H E A L T H A N D C H I L D & Y O U T H D E V E L O P M E N T OPN Architects | West Plains Engineering | M2B Structural Engineers | Schnoor-Bonifazi Engineering & Surveying BOARD OF SUPERVISORS 12/05/2016 Project Mission : To design a LEED Platinum facility that is beautiful, healthy, and naturally lit while remaining comfortable, resilient and an asset to the community | 1 | OPN Architects, Inc.

  2. COMMUNITY INPUT #1 | 2 |

  3. VISIONING SESSION | 3 |

  4. VISIONING SESSION | 4 |

  5. PROGRAMMING | 4 |

  6. SITE DIAGRAM | 5 |

  7. MASSING DIAGRAM 1 BUFFER The initial programmatic massing is aligned along 6 th Street to create a buffer from heavy semi traffic | 6 |

  8. MASSING DIAGRAM 2 ELEVATE The volume is elevated to protect critical function programs from the flood plain | 7 |

  9. MASSING DIAGRAM 3 TUCK Child & Youth Development Services and parking are tucked under the elevated bar | 8 |

  10. MASSING DIAGRAM 4 PARKIFY Green space is maximized across the site at multiple levels, contributing to a biophilic environment | 9 |

  11. MASSING DIAGRAM 5 SCALE Child & Youth Development Services bar is pulled apart to return the rhythm and scale of the surrounding neighborhood | 10 |

  12. MASSING DIAGRAM 6 TRANSFORM The Gym opens onto the green space, transforming the space into a community asset after hours | 11 |

  13. MASSING DIAGRAM 7 SLIDE The Clinic and Lab Services are slid out from the massing to define a clear identity and wayfinding path | 12 |

  14. MASSING DIAGRAM 8 PIERCE As the Clinic is slid out, a void is created allowing a direct circulation path across the site and into the building | 13 |

  15. MASSING DIAGRAM 9 VEIL The south facing facades are veiled to allow natural daylighting while maintaining sustainability and controlling light pollution | 14 |

  16. PLANS LEVEL 1 CIRCULATION | 4 |

  17. PLANS LEVEL 1 CHILD & YOUTH DEVELOPMENT PUBLIC HEALTH | 4 |

  18. PLANS LEVEL 2 CIRCULATION | 4 |

  19. PLANS LEVEL 2 CHILD & YOUTH DEVELOPMENT PUBLIC HEALTH | 4 |

  20. PLANS LEVEL 3 CIRCULATION | 4 |

  21. PLANS LEVEL 3 CHILD & YOUTH DEVELOPMENT PUBLIC HEALTH | 4 |

  22. AERIAL DIAGRAM | 15 |

  23. MATERIALITY | 16 |

  24. PERSPECTIVE | 18 |

  25. PERSPECTIVE | 17 |

  26. PERSPECTIVE | 17 |

  27. PERSPECTIVE | 17 |

  28. PERSPECTIVE | 17 |

  29. PERSPECTIVE | 17 |

  30. PERSPECTIVE | 17 |

  31. PERSPECTIVE | 17 |

  32. PERSPECTIVE | 19 |

  33. COST ESTIMATE | 19 |

  34. NEXT STEPS APPROVE BUDGET START DESIGN DEVELOPMENT | 20 |

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend