Oakland Unified School District
October 10 & 11, 2017
Blueprint for Quality Schools Crocker Highlands Presentation - - PowerPoint PPT Presentation
Blueprint for Quality Schools Crocker Highlands Presentation Oakland Unified School District October 10 & 11, 2017 1 Agenda Welcome and Introductions The Process: Blueprint for Quality Schools The Data: Condition, Capacity,
October 10 & 11, 2017
2
Schools
Participants:
Community Blueprint Advisory Group Executive Planning Committee Board
April 24 Board Launches Blueprint for Quality Schools May 25 Community Kickoff Meetings Summer Community Engagement Retreats
A u g 1 7 , A u g 3 1 B l u e p r i n t A d v i s
y G r
p M e e t i n g s 1 & 2
Wk of Sept 11 Community Dialog 1 Oct 3-5 Options Planning Workshop
O c t 2 6 , N
1 5 B l u e p r i n t A d v i s
y G r
p M e e t i n g s 3 & 4
Wk of Dec 4 Community Dialog 2 Dec 12-14
Recommendations Workshop
J a n 1 7 , 2 1 8 B l u e p r i n t A d v i s
y G r
p M e e t i n g 5
Jan/Feb 2018 Board Receives Blueprint
6
Deficiency costs = building systems and components that are already past their useful life, are broken, or not code-compliant
7
Mission Critical, Code Compliance Priority 1 May become Priority 1 issues in the near term Priority 2 Short-term Requirements Priority 3 Long-term Requirements Priority 4 Enhancements Priority 5
8
healthy, safe environments with a limited budget.
Century learning spaces and design.
determine a pathway forward that brings as many students as possible into modern learning environments with fixed resources.
9
Student-to- Classroom Ratio Classroom Type Utilzation Factor Planning Capacity
10
** Current enrollment shown above includes charter students where they are co-located inside a building with an OUSD District School (1,655 students)
SRA Region Current Enrollment Projected Enrollment (5 yrs) Current Utilization Range Projected Utilization Range Central 6,691 6,620 87% -- 122% 86% -- 121% East 14,671 14,325 75% -- 106% 74% -- 103% Northeast 5,458 5,207 71% -- 97% 68% -- 92% Northwest 8,173 7,951 94% -- 129% 92% -- 125% West 3,210 3,124 52% -- 72% 51% -- 70% Total 38,203 37,227 77% -- 107% 75% -- 104%
% total school capacity in portables 2016-17 enrollment
11
Cost of repairing / cost
the building as is Total costs of repairs for 5 years Cost of priority 1 & 2 deficiencies Projected enrollment in 5 years Change in enrollment
Utilization range: from Min – Max Level of repair suggested based on the Facility Condition Index Degree to which the building is utilized within an acceptable planning range
12
Facility Building Condition Current & Projected Enrollment School Utilization Analysis
School Name Grades Served Facility Condition Index Total 5 yr Facility Condition Costs Seismeic, Saftey, & Critical Repairs Current Enrollment Projected Enrollment (5 yrs) Enrollment Change (5 yrs) Percent of Capcity in Portables 5-year Range Between the Lowest
Teacher Ratios Condition Utilization
Elementary Anthony Chabot Elementary School K-5 16% $3,926,149 $528,998 562 543
29% 91% -- 137% Good Over-utilized Crocker Highlands Elementary School K-5 65% $13,606,914 $7,744,926 459 445
7% 133% -- 198% Moderate Renovations Over-utilized Emerson Elementary School TK-5 24% $5,134,946 $2,107,089 321 324 3 37% 68% -- 98% Minor Renovations Moderate-low Henry J. Kaiser, Jr. Elementary School K-5 43% $5,563,806 $787,772 269 253
38% 89% -- 135% Moderate Renovations Over-utilized Joaquin Miller Elementary School K-5 31% $7,004,636 $629,164 434 411
21% 87% -- 131% Minor Renovations Over-utilized Montclair Elementary School TK-5 25% $9,136,007 $77,674 643 700 57 17% 114% -- 169% Minor Renovations Over-utilized Peralta Elementary School K-5 10% $1,223,068 $55,938 319 302
37% 85% -- 127% Good Over-utilized Piedmont Avenue Elementary School TK-5 39% $9,437,607 $4,310,460 329 322
6% 73% -- 107% Minor Renovations Target range Thornhill Elementary School TK-5 30% $5,668,099 $809,543 392 387
34% 81% -- 122% Minor Renovations Moderate-high
Elementary Total $60,701,231 $17,051,564 3,728 3,687
25% 91% -- 135%
Claremont Middle School 6-8 22% $7,468,859 $1,060,589 446 441
8% 90% -- 114% Minor Renovations Moderate-high Edna Brewer Middle School 6-8 69% $34,427,901 $17,131,320 809 786
0% 101% -- 128% Major Renovation Over-utilized Montera Middle School 6-8 44% $23,876,827 $10,035,655 780 770
38% 75% -- 96% Moderate Renovations Target range
Middle Total $65,773,587 $28,227,564 2,035 1,997
15% 87% -- 111%
Oakland Technical High School 9-12 65% $102,904,313 $23,275,167 2,033 1,889
13% 106% -- 135% Moderate Renovations Over-utilized Oakland Tech HS- Upper Campus (Far West HS) 9-12 47% $5,554,498 $272,469 93% % -- % Moderate Renovations
High Total $108,458,811 $23,547,636 2,033 1,889
53% 95% -- 120%
Hillcrest Elementary School K-8 71% $9,581,062 $1,105,248 377 378 1 6% 107% -- 155% Major Renovation Over-utilized
Other Total $9,581,062 $1,105,248 377 378 1 6% 107% -- 155%
$244,514,692 $69,932,011 8,173 7,951
26% 92% -- 125%
13 Condition
29% of 5-year condition costs are associated with Seismic, Safety and Critical Repairs (Priority 1 & 2 Deficiencies).
Utilization
Elementary Schools – Elementary Schools are over-utilized in the Northwest SRA region. All ES are at or over-capacity and 7/9 are projected to be 122%-198% utilized in five years. Middle Schools – Middle Schools are full and Edna Brewer MS is over-utilized. High Schools – Oakland Technical HS is over-utilized. Other Schools –Hillcrest K-8 is over-utilized.
14