Ben Burr Trail PROJECT ALIGNMENT Project alignment Hamblen Elem School PROJECT ALIGNMENT New alignment Existing Hamblen gravel Elem School trail COMPREHENSIVE PLAN Spokane features three major transportation pathways or


  1. Ben Burr Trail

  2. PROJECT ALIGNMENT Project alignment Hamblen Elem School

  3. PROJECT ALIGNMENT New alignment Existing Hamblen gravel Elem School trail

  4. COMPREHENSIVE PLAN • “Spokane features three major transportation pathways or trails that are shared by pedestrians and bicyclists. These are the Ben Burr, Fish Lake, and Centennial trails… These three facilities serve both a recreational and transportation function for pedestrians and bicyclists.”

  5. PAST EFFORTS • Project has been under consideration for 20 years or so • In about 2005, EC neighborhood council asked city to apply for money to implement Ben Burr Trail improvements & connections • City Capital Programs applied for and received federal transportation funds • One of the requirements when receiving federal transportation funds is paving and certain width requirements

  6. PAST EFFORTS

  7. CURRENT STATUS • Project is in early stages of design • This meeting is to present preliminary design, solicit public input • Presentation is made at this early stage so public input can be incorporated • Design is on hold pending solicitation of additional public comment

  8. CONNECTIONS Existing connection to Proposed Liberty Park connection to Centennial Trail Hamblen Existing Elem School connection to Altamont Proposed connection to Proposed 11 th & Fiske connection to downtown bike network Existing connection to Hartson Proposed connection to 9 th & Altamont

  9. Segment #1 – Existing gravel trail Liberty Park Hamblen Elem School 11 th & Fiske

  10. Segment #2 – Liberty Park & 3 rd Ave. Liberty Park Hamblen Elem School 11 th & Fiske

  11. GRADE LIMITATIONS

  12. CONNECTIONS

  13. Segment #3 – Liberty Park to MLK Split path beneath Future MLK bike bridges lanes, trail when Brown develops New trail Hamblen alignment Elem School Shared use beneath freeway Liberty Park

  14. Segment #4 – MLK to Centennial Trail Existing Centennial Spur Trails Hamblen Elem School Existing Centennial Trail

  15. FUNDING AGENCY REQUIREMENTS • Shared use trail – pedestrians & cyclists • Paved • 12’ ideal, 10’ minimum paved trail width • 2’ shoulders each side • Protective railing where there are sharp dropoffs

  16. CENTENNIAL TRAIL AT MONROE BRIDGE 13’

  17. CENTENNIAL TRAIL AT MONROE BRIDGE 13’

  18. IDEAL TRAIL SECTION

  19. TRAIL SECTION THROUGH RR CUT

  20. TRAIL SECTION ON RR CUT

  21. TRAIL SECTION ON RR CUT

  22. PROJECT DETAILS • Design & ROW acquisition • Construction 2014 • Federally funded so everything more complicated

  23. FISH LAKE TRAIL - BEFORE

  24. FISH LAKE TRAIL

  25. COMMENTS • Fill out comment card or • Email jhappy@spokanecity.org or • Leave comments or get more info at: http://beta.spokanecity.org/blog/2013/10/ 25/input-sought-on-ben-burr-trail- improvements/

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend