Belle II several slides from Computing T. Hara Thomas Kuhr 1 - - PowerPoint PPT Presentation

belle ii
SMART_READER_LITE
LIVE PREVIEW

Belle II several slides from Computing T. Hara Thomas Kuhr 1 - - PowerPoint PPT Presentation

Belle II several slides from Computing T. Hara Thomas Kuhr 1 LMU Mnchen Search for New Physics There must be so far unobserved particles or forces Direct search: Production of new particles ATLAS, CMS @ LHC Indirect


slide-1
SLIDE 1

1

Belle II Computing

Thomas Kuhr LMU München several slides from

  • T. Hara
slide-2
SLIDE 2

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 2

Search for New Physics

➔ There must be so far unobserved particles or forces 

Direct search: Production of new particles ATLAS, CMS @ LHC →

Indirect search: Contribution of virtual new particles to observed processed Flavor physics →

Mass Coupling direct indirect

slide-3
SLIDE 3

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 3

B D →

(*)τν

➢ World average of R(D), R(D*) 4.1σ away from SM prediction

slide-4
SLIDE 4

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 4

Belle II @ SuperKEKB: 50 ab-1

8 x 1035 cm-2 s-1

SuperKEKB (LHC) Belle: 1 ab–1 LHC Run 3: 0,3 ab-1

slide-5
SLIDE 5

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 5

Belle II Detector

electrons (7GeV) positrons (4GeV)

KL and muon detector:

Resistive Plate Counter (barrel) Scintillator + WLSF + MPPC (end-caps)

Particle Identifjcation

Time-of-Propagation counter (barrel)

  • Prox. focusing Aerogel RICH (fwd)

Central Drift Chamber

He(50%):C2H6(50%), small cells, long lever arm, fast electronics

EM Calorimeter:

CsI(Tl), waveform sampling (barrel) Pure CsI + waveform sampling (end-caps)

Vertex Detector

2 layers DEPFET + 4 layers DSSD

Beryllium beam pipe

2cm diameter

TDR: arXiv:1011.0352

Tracking Velocity detector Calorimeter Magnet Muon detector Muon Photon Charged particle

slide-6
SLIDE 6

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 6

B D →

(*)τν @ Belle II

➢ Challenge: Reconstruction of decays with neutrinos

slide-7
SLIDE 7

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 7

Time Line

item

slide-8
SLIDE 8

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 8

First Collisions on April 26

slide-9
SLIDE 9

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 9

Data Flow

item

slide-10
SLIDE 10

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 10

Resource Estimates

item

slide-11
SLIDE 11

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 11

Belle II Collaboration

item

slide-12
SLIDE 12

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 12

Computing Model

item

slide-13
SLIDE 13

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 13

Expected Network Traffic

item

slide-14
SLIDE 14

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 14

Computing System

item

slide-15
SLIDE 15

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 15

Production System

item

slide-16
SLIDE 16

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 16

Monitoring

item

slide-17
SLIDE 17

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 17

MC Production Campaigns

item

slide-18
SLIDE 18

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 18

Summary

Exciting physics potential with 50 ab-1 at Belle II

Two orders of magnitude higher data volume than at Belle

Distributed computing system based on

➔ Existing technologies: DIRAC, LFC, CVMFS, ... ➔ Own development: DIRAC extensions, gbasf2 client, ... ➢

DIRAC provides interface to ARC-CEs

slide-19
SLIDE 19

NorduGrid Conference, 04.06.2018 Thomas Kuhr Seite 19

Belle II Virtual Reality