Custo tom m Agricul icultur tural al Solut lutions ions
Per Perfor
- rmanc
mance e Engineer eered ed
BEEFMASTER II Joe Biggerstaff William Ryan Haar Matt Kilker - - PowerPoint PPT Presentation
Custo tom m Agricul icultur tural al Solut lutions ions BEEFMASTER II Joe Biggerstaff William Ryan Haar Matt Kilker Taylor Miller Perfor Per ormanc mance e Engineer eered ed Custo tom m Agricul icultur tural al Solut
Per Perfor
mance e Engineer eered ed
Per Perfor
mance e Engineer eered ed
Per Perfor
mance e Engineer eered ed
Per Perfor
mance e Engineer eered ed
Per Perfor
mance e Engineer eered ed
Per Perfor
mance e Engineer eered ed
Swing Forward Swing Backward
Per Perfor
mance e Engineer eered ed
9” Clearance Latch Removable
Per Perfor
mance e Engineer eered ed
33’’ Clearance 7’’ Clearance
Per Perfor
mance e Engineer eered ed
Top Squeeze Release Top Squeeze Lever Locking Notches Locking Pin
Per Perfor
mance e Engineer eered ed
Bottom Squeeze Release Bottom Squeeze Lever Cross-Over Cables
Per Perfor
mance e Engineer eered ed
Per Perfor
mance e Engineer eered ed
Cross-Over Cables Parallel Linkage Break Over Linkage Open/Close Handle
Per Perfor
mance e Engineer eered ed
Slider Wheel & Track Slider Handle Guillotine Track
Per Perfor
mance e Engineer eered ed
Rumber Cross Member
Per Perfor
mance e Engineer eered ed
Per Perfor
mance e Engineer eered ed
Max Stress
Per Perfor
mance e Engineer eered ed
ITEM COST COMBINATION RETAIL VALUE (120% mark up) Basic Chute $1,599.53 Guillotine tailgate $74.35 $1,673.88 $3,682.54 Combo tailgate $221.98 $1,821.51 $4,007.32 Scissor tailgate $189.64 $1,789.17 $3,936.16 Existing Chute $1,386.24 $3,049.73 ITEM TOTAL # TOTAL COST Cuts 379 $94.75 Saddles 32 $8.00 Punches 138 $34.50 Welds 1530.5 $505.76 Total Labor Cost $643.01 Total Material Cost $536.28 Total Cost of WW Material $906.21 Total Cost of Prodotype $2,085.50
Per Perfor
mance e Engineer eered ed
Per Perfor
mance e Engineer eered ed
Per Perfor
mance e Engineer eered ed