Basin 101 Public Utilities Renewal Presented by : Public Utilities - - PDF document

basin 101 public utilities renewal
SMART_READER_LITE
LIVE PREVIEW

Basin 101 Public Utilities Renewal Presented by : Public Utilities - - PDF document

Collier County | Florida Basin 101 Public Utilities Renewal Presented by : Public Utilities Department Growth Management Department July 21, 2016 Agenda Introductions Project Descriptions Project Locations What to Expect During


slide-1
SLIDE 1

Basin 101 Public Utilities Renewal

Public Utilities Department Growth Management Department

Collier County | Florida

Presented by:

Agenda

Public Utilities Department Growth Management Department

 Introductions  Project Descriptions  Project Locations  What to Expect During Construction  Time Lines

80

July 21, 2016

slide-2
SLIDE 2

Introductions

 Project Manager

– Wastewater Team – Water Team – Stormwater Team

 Real Property Management Team  Construction Engineering and

Inspection Services Team (CEI)

 Contractor for Vanderbilt Cul-de-sacs

  • nly

Public Utilities Department Growth Management Department

Public Utilities Renewal

 Two Separate Projects

– Vanderbilt Drive/ Cul-de-Sacs – 107th, 110th Avenues North, and 8th Street

 Both include replacement/ upgrade of

– Water Mains – Wastewater (Sewer) Mains – Stormwater Drainage

 Each on different schedules

Public Utilities Department Growth Management Department

81

slide-3
SLIDE 3

Vanderbilt Drive 111th Avenue N Vanderbilt Beach Rd.

BASIN 101

107th & 110th Avenues North Project Vanderbilt Drive/ Cul-de-sacs Project

Vanderbilt Drive/Cul-de-Sacs Public Utilities Renewal

Public Utilities Department Growth Management Department

Collier County | Florida

Presented by:

82

slide-4
SLIDE 4

Project Description

 Water Mains

– Install new water main and connection services – Remove 40 year old asbestos-cement pipe

 Wastewater Mains

– New gravity sewer and cleanouts – Abandon 40 year old clay pipe

 Stormwater

– Remove and replace stormwater pipes – Renew ditches as needed

Public Utilities Department Growth Management Department

Vanderbilt Cul-de-sacs Project Location

Gulf Shore Drive Vanderbilt Drive 111th Avenue Vanderbilt Beach Rd.

83

slide-5
SLIDE 5

Phase 1

 Vanderbilt

Drive - North

Phase 2

 Flamingo Ave.  Heron Ave.  Egret Ave.  Conners Ave.

84

slide-6
SLIDE 6

Phase 3

 Vanderbilt

Drive

 Seabee Ave.  Germain Ave.  Seagull Ave.

Phase 4

 Vanderbilt

Drive – South Central

85

slide-7
SLIDE 7

Phase 5

 Willet Ave.  Tradewinds

Ave.

 Lagoon Ave.  Bayside Ave.

Phase 6

 Vanderbilt

Drive - South

86

slide-8
SLIDE 8

Phase 7

 Pine Ave.  Oak Ave.  Palm Ct.

Typical Street View

Public Utilities Renewal

87

slide-9
SLIDE 9

FIVE NEW PIPES TWO NEW PIPES & SWALE

Public Utilities Renewal

Typical Street View (continued) 107th,110th Avenues North, and 8th Street Public Utilities Renewal

Public Utilities Department Growth Management Department

Collier County | Florida

Presented by:

88

slide-10
SLIDE 10

Project Description

 Water Mains

– Install new water main and connection services – Remove 40 year old asbestos-cement pipe

 Wastewater Mains

– New gravity sewer and cleanouts – Abandon 40 year old clay pipe

 Stormwater

– Remove and replace stormwater pipes – Renew ditches as needed

Public Utilities Department Growth Management Department

107th and 110th Avenues North Project Location

6

110th Avenue N 8th Street 107th Avenue N

89

slide-11
SLIDE 11

What to Expect

Public Utilities Department Growth Management Department 14

Vanderbilt Drive/ Cul-de-Sacs 107th, 110th Avenues North, and 8th Street

What to Expect

Public Utilities Department Growth Management Department

Vanderbilt Drive/ Cul-de-Sacs 107th, 110th Avenues North, and 8th Street

90

slide-12
SLIDE 12

What to Expect

Public Utilities Department Growth Management Department 16

Vanderbilt Drive/ Cul-de-Sacs 107th, 110th Avenues North, and 8th Street

What to Expect

Public Utilities Department Growth Management Department

Vanderbilt Drive/ Cul-de-Sacs 107th, 110th Avenues North, and 8th Street

91

slide-13
SLIDE 13

What to Expect

Public Utilities Department Growth Management Department

Vanderbilt Drive/ Cul-de-Sacs 107th, 110th Avenues North, and 8th Street

Backflow Preventer and Cleanouts

Each service will receive a Backflow Preventer and a Cleanout

Public Utilities Department Growth Management Department

92

slide-14
SLIDE 14

Project Communications

 Hotline for all projects 239-839-6247  Emails addresses:

  • Vanderbilt Drive/ Cul-de-sacs:

VDCPUR@stantec.com

  • 107th, 110th Avenues North and 8th Street:

NaplesParkPUR@stantec.com

 Website to be announced

Vanderbilt Drive/Cul-de-sacs Time Line

 Board of County Commissioners approval:

July 12, 2016

 Construction to start September 2016  Expect entire construction to last

approximately 30 months (March 2019)

 Approximately 4 to 5 months per phase

Public Utilities Department Growth Management Department

93

slide-15
SLIDE 15

107th and 110th Avenues North Anticipated Time Line

 Selection of the contractor: September

2016

 Board of County Commissioners approval:

November 2016

 Construction to start January 2017  Expect construction to last approximately

12 months (January 2018)

Public Utilities Department Growth Management Department

Thank You!

The Public Utilities Renewal Team

24

94