Aug ust 26, 2020 | 6:30 - 7:30 PM AGE NDA 1. We bE x me e ting - - PowerPoint PPT Presentation

aug ust 26 2020 6 30 7 30 pm
SMART_READER_LITE
LIVE PREVIEW

Aug ust 26, 2020 | 6:30 - 7:30 PM AGE NDA 1. We bE x me e ting - - PowerPoint PPT Presentation

We lc ome to the L owma n Be a c h Ra c ke t Court Virtua l Ope n House #1 Aug ust 26, 2020 | 6:30 - 7:30 PM AGE NDA 1. We bE x me e ting fo rmat 2. I ntro duc tio n 3. Vic inity Map 4. E xisting park c o nditio ns 5. Sho re line


slide-1
SLIDE 1

L

  • wma n Be a c h Ra c ke t Court Ne w De sig n | Aug ust 2020

** this me e ting is be ing re c o rde d **

We lc ome to the L

  • wma n Be a c h Ra c ke t Court

Virtua l Ope n House #1

Aug ust 26, 2020 | 6:30 - 7:30 PM

AGE NDA

  • 1. We bE

x me e ting fo rmat

  • 2. I

ntro duc tio n

  • 3. Vic inity Map
  • 4. E

xisting park c o nditio ns

  • 5. Sho re line Re sto ratio n &

Se awall Re plac e me nt Pro je c t

  • 6. Co urt ame nitie s
  • 7. Park ame nitie s
  • 8. Surve y link
slide-2
SLIDE 2

L

  • wma n Be a c h Ra c ke t Court Ne w De sig n | Aug ust 2020

** this me e ting is be ing re c o rde d **

ME E T ING DE T AIL S:

  • 1. We ’ re he re to have fun and partic ipate in a safe

manne r!

  • 2. Yo u are all mute d. (also ke e p vide o o ff)
  • 3. At any time type in yo ur que stio ns in the c hat

fe ature and we will addre ss the m at the e nd o f the me e ting .

  • 4. T

he me e ting will be re c o rde d & po ste d o n Park’ s we bsite fo r late r vie wing .

  • ut late r.
  • 6. I

f yo u ac c e ss the me e ting by pho ne , we ask yo u dial *6 to mute yo ur audio .

We bE x Me e ting F

  • rma t
slide-3
SLIDE 3

L

  • wma n Be a c h Ra c ke t Court Ne w De sig n | Aug ust 2020

** this me e ting is be ing re c o rde d **

Introduc tions Proje c t Goa ls Sc he dule

Se a ttle Sports Comple x F

  • unda tion

Se a ttle De pa rtme nt of Ne ig hborhoods Se a ttle Pa rks & Re c re a tion HBB L a ndsc a pe Arc hite c ture

  • 1. Cre a te a sc he ma tic de sig n for a ne w ra c ke t c ourt a t L
  • wma n Be a c h Pa rk.
  • 2. E

nsure a c c e ss to a ne w c ourt is ADA a c c e ssible .

  • 3. Ma ximize pote ntia l use of c ourt with multiple c ourt a nd pa rk a me nitie s.
  • 4. Minimize disturba nc e to e xisting pa rk fe a ture s.

E nd of Aug ust (now): visio ning and analysis Mid- Autumn: 2 to 3 c o nc e pts Ne a r e nd of ye a r: F

inal sc he matic de sig n

slide-4
SLIDE 4

L

  • wma n Be a c h Ra c ke t Court Ne w De sig n | Aug ust 2020

** this me e ting is be ing re c o rde d **

Lincoln Park Pelly Place Natural Area F a u n t l e r

  • y

W a y S W 35th Ave SW Beach Dr SW Solstice Park EC Hughes Playground Southwest Athletic Complex (SWAC) Walt Hundley

  • Vic inity Ma p

A.T. Milo Park Lowman Beach

PUGET SOUND

slide-5
SLIDE 5

L

  • wma n Be a c h Ra c ke t Court Ne w De sig n | Aug ust 2020

** this me e ting is be ing re c o rde d **

Tennis Court BEACH DRIVE SW Trees

1

1 Trees Sw ings Tennis Court

2

2

3

3

Swings Existing Paths

E xisting Conditions

PUGET SOUND

slide-6
SLIDE 6

L

  • wma n Be a c h Ra c ke t Court Ne w De sig n | Aug ust 2020

** this me e ting is be ing re c o rde d **

New Trees New Trees New Path and Bench Locations New Seawall Pelly Creek Pipe Realignment Daylight Pelly Creek BEACH DRIVE SW

Shore line Re stora tion Pla n

PUGET SOUND Beach

slide-7
SLIDE 7

L

  • wma n Be a c h Ra c ke t Court Ne w De sig n | Aug ust 2020

** this me e ting is be ing re c o rde d **

BEACH DRIVE SW

E xisting CSO Utilitie s

PUGET SOUND

slide-8
SLIDE 8

L

  • wma n Be a c h Ra c ke t Court Ne w De sig n | Aug ust 2020

** this me e ting is be ing re c o rde d **

PUGET SOUND Full size court to scale

120’ 60’

PREVAILING WIND DIRECTION SUN PATH STEEP SLOPES

Opportunity Are a

1

1

2

Opportunity Area Beach

2

slide-9
SLIDE 9

L

  • wma n Be a c h Ra c ke t Court Ne w De sig n | Aug ust 2020

** this me e ting is be ing re c o rde d **

Court Ame nitie s

  • D: Game striping

B: Pickleball only E: Trike track on court C: Tennis and Pickleball combined F: Alternative court colors

slide-10
SLIDE 10

L

  • wma n Be a c h Ra c ke t Court Ne w De sig n | Aug ust 2020

** this me e ting is be ing re c o rde d **

Pa rk Ame nitie s

D: Fitness equipment B: Bike rack E: Open lawn (no court) C: Benches F: Swinging benches and/or terrace seating A: Swingset

slide-11
SLIDE 11

L

  • wma n Be a c h Ra c ke t Court Ne w De sig n | Aug ust 2020

** this me e ting is be ing re c o rde d **

T ha nk you for pa rtic ipa ting !

F

  • r g raphic s o f the se slide s, surve y link, and pro je c t update s visit:
  • ONL

I NE SU R VE Y L I NK : https://www.sur

veymonkey.c om/r /Z 2Y38R9

QR Code:

She lle y Ha da wa y

she lle yhadaway@ g mail.c o m Se attle Spo rts Co mple x F

  • undatio n

Pa me la Klime nt

pame la.klime nt@ se attle .g o v Se attle Parks and Re c re atio n (206)-465-2764

Contact: