AT NMCN 29 th January 2019 - Gary Ross nmcn Overview 2 1946 1800 - - PowerPoint PPT Presentation

at nmcn
SMART_READER_LITE
LIVE PREVIEW

AT NMCN 29 th January 2019 - Gary Ross nmcn Overview 2 1946 1800 - - PowerPoint PPT Presentation

RE-DRAWING THE BIM CURVE AT NMCN 29 th January 2019 - Gary Ross nmcn Overview 2 1946 1800 SECTORS FOUNDED EMPLOYEES 12 350m 63 REGIONAL TURNOVER GRADUATES & OFFICES APPRENTICES CONTRACTOR OF THE YEAR A positive impact on


slide-1
SLIDE 1

RE-DRAWING THE BIM CURVE AT NMCN

29th January 2019 - Gary Ross

slide-2
SLIDE 2

A positive impact on everything we touch.

1800

EMPLOYEES

12

REGIONAL OFFICES

£350m

TURNOVER

nmcn Overview

2

SECTORS

63

GRADUATES & APPRENTICES

1946

FOUNDED CONTRACTOR OF THE YEAR

slide-3
SLIDE 3

THE BIM CURVE

slide-4
SLIDE 4

A positive impact on everything we touch.

The BIM Curve - Wedge

1D 2D 3D Dimensions of Managed Information Time

?

slide-5
SLIDE 5

IINTRODUCING BIM LEVEL 2 + 10 DIMENSIONS OF INFORMATION

slide-6
SLIDE 6

A positive impact on everything we touch.

BIM Level 2+ ~10 Dimensions of Information

1D

Process & Governance

2D

Drawings from 3D models

3D

Models

4D

Integrated time planning

5D

Integrated cost planning

6D

Integrated environment

7D

Integrated asset management

8D

Integrated health & safety

9D

Integrated lean construction

10D

Overall benefit

slide-7
SLIDE 7

RE-DRAWING THE BIM CURVE

slide-8
SLIDE 8

A positive impact on everything we touch.

The BIM Curve - Re-Engineered

Dimensions of Managed Information Utilisation

10D 9D 8D 7D 6D 5D 4D 1D, 2D & 3D

slide-9
SLIDE 9

INTELLIGENT MODELLING

slide-10
SLIDE 10

A positive impact on everything we touch.

The Intelligent 3D model

slide-11
SLIDE 11

A positive impact on everything we touch.

The Intelligent 3D model

Parameter Value 1D - Standards PAS1192/ISO19650/nmcn OP’s 2D – Length/Width 2D - Position (x,y) 1952mm x 2014mm 30083,45384 3D – Height / Volume 3D – Base Elevation (z) 2072mm / 8.145 cubic metres 10302mm ASL 4D – Phase Information 4D – Delivery date 4D – Commissioning Date 4D – Warranty Expiration 4D - Lifespan Construction Phase – Build 19th October 2019 4:15pm 31st October 2019 Midnight 19th October 2023 10 years 5D – CAPEX cost (List) 5D – Invoice Date 5D – Payment Due Date 5D – Lifespan cost (OPEX) £2042.95 19th October 2019 19th December 2019 £5995.02 6D – Environmental Impact 6D – Lifespan Emissions Diesel Fuel - 140 l/year - Bunded 1.48 Tonnes of Carbon Dioxide 7D – Manufacturer Name 7D – Spares Kit 7D – Maintenance Regime ACME Inc. 2 years Spares kit included www.maintenanceguide.com 8D – Risk Assessment 8D – Manufacturer H&S Note www.googledocs/rams/ip2432 www.acme.com/ip2432/warnings 9D – JIT Delivery Date 9D – OSB Workshop Release 9D – OSB Lead Time 21st October 2019 12:15pm 18th October 2019 11:48am 2 days 10D – Actual saving (TOTEX) 10D –Programme Flex 10D – Bulk Purchase % saving £1,042.34

  • 4 days 3 hours

5% Capex Discount ~ £102.14

slide-12
SLIDE 12

PARAMETRIC CONFIGURATORS

slide-13
SLIDE 13

A positive impact on everything we touch.

OSB and Intelligent Parametric models

Type 1 Type 2 Type 3

slide-14
SLIDE 14

RE-IMAGINING CONSTRUCTION

slide-15
SLIDE 15

A positive impact on everything we touch.

Re – defining Construction processes

slide-16
SLIDE 16

A positive impact on everything we touch.

ANY QUESTIONS?

gary.ross@nmcn.com