AT NMCN 29 th January 2019 - Gary Ross nmcn Overview 2 1946 1800 - PowerPoint PPT Presentation

RE-DRAWING THE BIM CURVE AT NMCN 29 th January 2019 - Gary Ross nmcn Overview 2 1946 1800 SECTORS FOUNDED EMPLOYEES 12 350m 63 REGIONAL TURNOVER GRADUATES & OFFICES APPRENTICES CONTRACTOR OF THE YEAR A positive impact on


  1. RE-DRAWING THE BIM CURVE AT NMCN 29 th January 2019 - Gary Ross

  2. nmcn Overview 2 1946 1800 SECTORS FOUNDED EMPLOYEES 12 £350m 63 REGIONAL TURNOVER GRADUATES & OFFICES APPRENTICES CONTRACTOR OF THE YEAR A positive impact on everything we touch.

  3. THE BIM CURVE

  4. The BIM Curve - Wedge ? Dimensions of 3D Managed 2D Information 1D Time A positive impact on everything we touch.

  5. IINTRODUCING BIM LEVEL 2 + 10 DIMENSIONS OF INFORMATION

  6. BIM Level 2+ ~10 Dimensions of Information 10D 1D Overall benefit Process & Governance 2D 9D Drawings from 3D Integrated lean models construction 8D 3D Integrated health & Models safety 4D 7D Integrated time Integrated asset planning management 6D 5D Integrated Integrated cost planning environment A positive impact on everything we touch.

  7. RE-DRAWING THE BIM CURVE

  8. The BIM Curve - Re-Engineered 10D 9D 8D Dimensions of 7D Managed Information 6D 5D 4D 1D, 2D & 3D Utilisation A positive impact on everything we touch.

  9. INTELLIGENT MODELLING

  10. The Intelligent 3D model A positive impact on everything we touch.

  11. Parameter Value The Intelligent 3D model 1D - Standards PAS1192/ISO19650/nmcn OP’s 2D – Length/Width 1952mm x 2014mm 2D - Position (x,y) 30083,45384 3D – Height / Volume 2072mm / 8.145 cubic metres 3D – Base Elevation (z) 10302mm ASL 4D – Phase Information Construction Phase – Build 19 th October 2019 4D – Delivery date 4:15pm 31 st October 2019 4D – Commissioning Date Midnight 19 th October 2023 4D – Warranty Expiration 4D - Lifespan 10 years 5D – CAPEX cost (List) £2042.95 19 th October 2019 5D – Invoice Date 19 th December 2019 5D – Payment Due Date 5D – Lifespan cost (OPEX) £5995.02 6D – Environmental Impact Diesel Fuel - 140 l/year - Bunded 6D – Lifespan Emissions 1.48 Tonnes of Carbon Dioxide 7D – Manufacturer Name ACME Inc. 7D – Spares Kit 2 years Spares kit included 7D – Maintenance Regime www.maintenanceguide.com 8D – Risk Assessment www.googledocs/rams/ip2432 8D – Manufacturer H&S Note www.acme.com/ip2432/warnings 21 st October 2019 12:15pm 9D – JIT Delivery Date 18 th October 2019 11:48am 9D – OSB Workshop Release 9D – OSB Lead Time 2 days 10D – Actual saving (TOTEX) £1,042.34 10D – Programme Flex -4 days 3 hours 10D – Bulk Purchase % saving 5% Capex Discount ~ £102.14 A positive impact on everything we touch.

  12. PARAMETRIC CONFIGURATORS

  13. OSB and Intelligent Parametric models Type 1 Type 2 Type 3 A positive impact on everything we touch.

  14. RE-IMAGINING CONSTRUCTION

  15. Re – defining Construction processes A positive impact on everything we touch.

  16. ANY QUESTIONS? gary.ross@nmcn.com A positive impact on everything we touch.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend