RE-DRAWING THE BIM CURVE AT NMCN 29 th January 2019 - Gary Ross
nmcn Overview 2 1946 1800 SECTORS FOUNDED EMPLOYEES 12 £350m 63 REGIONAL TURNOVER GRADUATES & OFFICES APPRENTICES CONTRACTOR OF THE YEAR A positive impact on everything we touch.
THE BIM CURVE
The BIM Curve - Wedge ? Dimensions of 3D Managed 2D Information 1D Time A positive impact on everything we touch.
IINTRODUCING BIM LEVEL 2 + 10 DIMENSIONS OF INFORMATION
BIM Level 2+ ~10 Dimensions of Information 10D 1D Overall benefit Process & Governance 2D 9D Drawings from 3D Integrated lean models construction 8D 3D Integrated health & Models safety 4D 7D Integrated time Integrated asset planning management 6D 5D Integrated Integrated cost planning environment A positive impact on everything we touch.
RE-DRAWING THE BIM CURVE
The BIM Curve - Re-Engineered 10D 9D 8D Dimensions of 7D Managed Information 6D 5D 4D 1D, 2D & 3D Utilisation A positive impact on everything we touch.
INTELLIGENT MODELLING
The Intelligent 3D model A positive impact on everything we touch.
Parameter Value The Intelligent 3D model 1D - Standards PAS1192/ISO19650/nmcn OP’s 2D – Length/Width 1952mm x 2014mm 2D - Position (x,y) 30083,45384 3D – Height / Volume 2072mm / 8.145 cubic metres 3D – Base Elevation (z) 10302mm ASL 4D – Phase Information Construction Phase – Build 19 th October 2019 4D – Delivery date 4:15pm 31 st October 2019 4D – Commissioning Date Midnight 19 th October 2023 4D – Warranty Expiration 4D - Lifespan 10 years 5D – CAPEX cost (List) £2042.95 19 th October 2019 5D – Invoice Date 19 th December 2019 5D – Payment Due Date 5D – Lifespan cost (OPEX) £5995.02 6D – Environmental Impact Diesel Fuel - 140 l/year - Bunded 6D – Lifespan Emissions 1.48 Tonnes of Carbon Dioxide 7D – Manufacturer Name ACME Inc. 7D – Spares Kit 2 years Spares kit included 7D – Maintenance Regime www.maintenanceguide.com 8D – Risk Assessment www.googledocs/rams/ip2432 8D – Manufacturer H&S Note www.acme.com/ip2432/warnings 21 st October 2019 12:15pm 9D – JIT Delivery Date 18 th October 2019 11:48am 9D – OSB Workshop Release 9D – OSB Lead Time 2 days 10D – Actual saving (TOTEX) £1,042.34 10D – Programme Flex -4 days 3 hours 10D – Bulk Purchase % saving 5% Capex Discount ~ £102.14 A positive impact on everything we touch.
PARAMETRIC CONFIGURATORS
OSB and Intelligent Parametric models Type 1 Type 2 Type 3 A positive impact on everything we touch.
RE-IMAGINING CONSTRUCTION
Re – defining Construction processes A positive impact on everything we touch.
ANY QUESTIONS? gary.ross@nmcn.com A positive impact on everything we touch.