assessment update 2012 2013 preliminary results
play

Assessment Update: 2012-2013 Preliminary Results Department of - PowerPoint PPT Presentation

Assessment Update: 2012-2013 Preliminary Results Department of Accountability School Board Meeting August 22, 2013 Department of Accountability: Anyone can measure the rain; we build arks. Federal Annual Measurable Objectives (AMO)


  1. Assessment Update: 2012-2013 Preliminary Results Department of Accountability School Board Meeting August 22, 2013 Department of Accountability: “Anyone can measure the rain; we build arks.”

  2. Federal Annual Measurable Objectives (AMO)  Replaced Annual Yearly Progress (AYP)  Measures participation and achievement levels in reading and mathematics  Reports the percent of students passing across nine subgroups at the state, division, and school levels 2 Department of Accountability: “Anyone can measure the rain; we build arks.”

  3. Federal Annual Measurable Objectives (AMO) 3 Department of Accountability: “Anyone can measure the rain; we build arks.”

  4. Federal Annual Measurable Objectives (AMO) Federal AMO’s can be met by:  Exceeding the AMO based on current year’s performance  Exceeding the AMO based on a 3 year average  Reducing the previous year’s failure rate by 10%  Having less than 30 students in a subgroup 4 Department of Accountability: “Anyone can measure the rain; we build arks.”

  5. Preliminary AMO Division Reading Performance 5 Department of Accountability: “Anyone can measure the rain; we build arks.”

  6. Preliminary AMO Division Mathematics Performance 6 Department of Accountability: “Anyone can measure the rain; we build arks.”

  7. Example of AMOs Accounting for Improvement: Patrick Henry Math 7 Department of Accountability: “Anyone can measure the rain; we build arks.”

  8. State Accreditation  Measures achievement levels in English (Reading and Writing SOLs combined), mathematics, history, and science.  Only accounts for the “All Student” pass rates in each of the four academic areas.  Accreditation benchmarks were elevated this year in grades 6-12 English (+5%), grade 3 History (+20%), and grade 3 Science (+20%) 8 Department of Accountability: “Anyone can measure the rain; we build arks.”

  9. Preliminary Accreditation Results 2013-2014 9 Department of Accountability: “Anyone can measure the rain; we build arks.”

  10. Historical Accreditation Status 10 Department of Accountability: “Anyone can measure the rain; we build arks.”

  11. Preliminary Advanced Placement (AP) Results 11 Department of Accountability: “Anyone can measure the rain; we build arks.”

  12. Scholastic Reading Inventory (SRI) Data 12 Department of Accountability: “Anyone can measure the rain; we build arks.”

  13. Phonological Awareness Literacy Screening (PALS) Cohort Report 13 Department of Accountability: “Anyone can measure the rain; we build arks.”

  14. Phonological Awareness Literacy Screening (PALS) Growth Report 14 Department of Accountability: “Anyone can measure the rain; we build arks.”

  15. Coming Soon…  SAT  ACT  WIDA ACCESS for ELLs  VA On-Time Graduation and Dropout Statistics  Additional SOL and AP analyses as data become available 15 Department of Accountability: “Anyone can measure the rain; we build arks.”

  16. Questions? Contact: Department of Accountability (703) 824-6638 or Email: clinton.page@acps.k12.va.us Department of Accountability: “Anyone can measure the rain; we build arks.” 16

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend