ARLINGTON COUNTY CIVIC FEDERATION (ACCF) 22202 Development Summary - PowerPoint PPT Presentation

ARLINGTON COUNTY CIVIC FEDERATION (ACCF) 22202 Development Summary & Amazon Update Dec 17, 2019 Current Development Activity 2 Distinct Stages of Site Plan Review (Arlington County) Conceptual Preliminary Final Applications


  1. ARLINGTON COUNTY CIVIC FEDERATION (ACCF) 22202 Development Summary & Amazon Update Dec 17, 2019

  2. Current Development Activity 2 Distinct Stages of Site Plan Review (Arlington County) Conceptual Preliminary Final Applications Applications Applications* High level More refined Complete set of civil drawings and set of plans engineering, landscape, Level of Plan vision for how depicting and architecture plans Development a particular detailed meeting County’s site could elements of the submission requirements redevelop proposal Cursory Review Detailed review Public Review Process Review Type by Staff by staff may begin (LRPC/SPRC) * Final Applications are reviewed by Long Range Planning and Site Plan Review Committees (as necessary), various Commissions, and finally the County Board

  3. 22202 Approved in Development Summary October 2019 December 2019 1 Approved Site Plans 3 1 Crystal City Verizon Site 2 Met Park (Phase 6-8) 2 3 Crystal Houses Approved in December 2019 3 NORTH

  4. 22202 Approved in Development Summary October 2019 December 2019 1 Approved Site Plans 4 1 Crystal City Verizon Site 2 Met Park (Phase 6-8) 2 3 Crystal Houses Final Site Plan Applications Approved in December 2019 4 1900 Crystal Drive 4 3 NORTH

  5. 22202 Approved in Development Summary October 2019 December 2019 1 6 7 Approved Site Plans 5 1 Crystal City Verizon Site 5 2 Met Park (Phase 6-8) 2 3 Crystal Houses Final Site Plan Applications Approved in December 2019 4 1900 Crystal Drive 4 Preliminary SP Applications 5 River House 8 3 12 th Street (Brookfield) 6 101 12 th Street 7 9 8 2001 Richmond Highway 2300 Crystal Drive/ 9 223 23 rd Street 10 2525 Crystal Drive 10 NORTH

  6. 22202 Approved in Development Summary October 2019 December 2019 11 1 6 7 Approved Site Plans 6 1 Crystal City Verizon Site 5 2 Met Park (Phase 6-8) 2 3 Crystal Houses Final Site Plan Applications Approved in December 2019 4 1900 Crystal Drive General Character Of Development 4 Preliminary SP Applications 1 Residential w/ retail 5 River House 8 2 Office w/ retail 3 12 th Street (Brookfield) 3 Residential 6 4 Residential w/ retail 101 12 th Street 7 5 Residential w/ retail 9 8 2001 Richmond Highway 6 Mixed Use (TBD) 2300 Crystal Drive/ 9 7 Office 223 23 rd Street AMAZON 8 Residential 10 2525 Crystal Drive HQ2 10 9 Office and Residential 10 Residential Future Applications 11 Office w/ retail PenPlace 11 NORTH

  7. Amazon HQ2 Amazon’s Anticipated Growth 7 3 2 1 (Source: ZGF Architects LLP)

  8. Amazon HQ2 Crystal City – Amazon’s Interim Office Space 8 Stage 1 : Several existing buildings are in the process of being leased or significantly renovated to accommodate the initial Amazon workforce 241 18 th Street S. 2345 Crystal Drive Amazon currently occupies several floors in each building

  9. Amazon HQ2 Crystal City – Amazon’s Interim Office Space 9 Stage 1 : Several existing buildings are in the process of being leased or significantly renovated to accommodate the initial Amazon workforce 1800 S. Bell Street 1770 Crystal Drive Anticipated completion : Mid-2020 (Approximately 450,000 sf of space)

  10. Amazon HQ2 Pentagon City – Amazon’s Headquarters 10 Stage 2 : Redevelopment of Metropolitan Park with Phases 6 and 7/8 (2 new buildings) 4-5 3 2 1 (Source: ZGF Architects LLP)

  11. Amazon HQ2 Pentagon City – Amazon’s Headquarters 11 Stage 2 : Redevelopment of Metropolitan Park with Phases 6 and 7/8 (2 new buildings) Source: ZGF Architects LLP Phases 7/8 Phase 6

  12. Amazon HQ2 Pentagon City – Amazon’s Headquarters 12 Stage 2 : Redevelopment of Metropolitan Park with Phases 6 and 7/8 (2 new buildings) Proposed Renderings of Met Park 6-8 (Source: ZGF Architects LLP)

  13. Amazon HQ2 Pentagon City – Amazon’s Headquarters 13 Stage 3 : Redevelopment of PenPlace (multiple new buildings – likely in phases) 2020 Outlook Evaluation of PenPlace Master Plan to consider: PenPlace • 2013 adopted vision for the block • Guidance developed through the Pentagon City (PDSP) Planning Study Met Park 6-8 Final Plans & Construction • Final Civil Engineering Plans, Building Plans, and Landscape Plans • Start of Construction • Anticipated completion in early 2023 Met Park Phases 6-8

  14. Pentagon City Future Pentagon City – Next Steps 14 Phased Development Site Plan (PDSP) will be updated through a planning study in 2020 to evaluate the local transportation network and its capacity to support future growth in this area

  15. Thank You

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.