ARLINGTON COUNTY CIVIC FEDERATION (ACCF) 22202 Development Summary & Amazon Update Dec 17, 2019 Current Development Activity 2 Distinct Stages of Site Plan Review (Arlington County) Conceptual Preliminary Final Applications


slide-1
SLIDE 1

ARLINGTON COUNTY CIVIC FEDERATION (ACCF)

22202 Development Summary & Amazon Update

Dec 17, 2019

slide-2
SLIDE 2

Current Development Activity

2

Conceptual Applications Preliminary Applications Final Applications* Level of Plan Development High level drawings and vision for how a particular site could redevelop More refined set of plans depicting detailed elements of the proposal Complete set of civil engineering, landscape, and architecture plans meeting County’s submission requirements Review Type Cursory Review by Staff Detailed review by staff Public Review Process may begin (LRPC/SPRC)

Distinct Stages of Site Plan Review (Arlington County)

* Final Applications are reviewed by Long Range Planning and Site Plan Review Committees (as necessary), various Commissions, and finally the County Board

slide-3
SLIDE 3

3

NORTH

1 2 3

Approved in October 2019 Approved in December 2019

22202 Development Summary

December 2019

Approved Site Plans 1 Crystal City Verizon Site 2 Met Park (Phase 6-8) 3 Crystal Houses

slide-4
SLIDE 4

4

NORTH

2 3 4

Approved in October 2019 Approved in December 2019

22202 Development Summary

December 2019

Final Site Plan Applications 4 1900 Crystal Drive Approved Site Plans 1 Crystal City Verizon Site 2 Met Park (Phase 6-8) 3 Crystal Houses

1

slide-5
SLIDE 5

5

NORTH

2 3

Preliminary SP Applications 5 River House 6 12th Street (Brookfield) 7 101 12th Street 8 2001 Richmond Highway 9 2300 Crystal Drive/ 223 23rd Street

10

2525 Crystal Drive

5 6 8 9 10 22202 Development Summary

December 2019 Approved in October 2019 Approved in December 2019

Final Site Plan Applications 4 1900 Crystal Drive Approved Site Plans 1 Crystal City Verizon Site 2 Met Park (Phase 6-8) 3 Crystal Houses

1 7 4

slide-6
SLIDE 6

6

NORTH

2 3 5 6 11

General Character Of Development 1 Residential w/ retail 2 Office w/ retail 3 Residential 4 Residential w/ retail 5 Residential w/ retail 6 Mixed Use (TBD) 7 Office 8 Residential 9 Office and Residential 10 Residential 11 Office w/ retail

AMAZON HQ2

Approved in October 2019 Approved in December 2019

Preliminary SP Applications 5 River House 6 12th Street (Brookfield) 7 101 12th Street 8 2001 Richmond Highway 9 2300 Crystal Drive/ 223 23rd Street

10

2525 Crystal Drive

22202 Development Summary

December 2019

Final Site Plan Applications 4 1900 Crystal Drive Approved Site Plans 1 Crystal City Verizon Site 2 Met Park (Phase 6-8) 3 Crystal Houses Future Applications

11

PenPlace

1 4 7 8 9 10

slide-7
SLIDE 7

Amazon’s Anticipated Growth

7

Amazon HQ2

(Source: ZGF Architects LLP)

1 3 2

slide-8
SLIDE 8

Crystal City – Amazon’s Interim Office Space

8

Amazon HQ2

Stage 1: Several existing buildings are in the process of being leased or significantly renovated to accommodate the initial Amazon workforce

241 18th Street S. 2345 Crystal Drive

Amazon currently occupies several floors in each building

slide-9
SLIDE 9

Crystal City – Amazon’s Interim Office Space

9

Amazon HQ2

Stage 1: Several existing buildings are in the process of being leased or significantly renovated to accommodate the initial Amazon workforce

1770 Crystal Drive 1800 S. Bell Street

Anticipated completion: Mid-2020 (Approximately 450,000 sf of space)

slide-10
SLIDE 10

1 2 3

4-5

Pentagon City – Amazon’s Headquarters

10

Amazon HQ2

Stage 2: Redevelopment of Metropolitan Park with Phases 6 and 7/8 (2 new buildings)

(Source: ZGF Architects LLP)

slide-11
SLIDE 11

Pentagon City – Amazon’s Headquarters

11

Amazon HQ2

Stage 2: Redevelopment of Metropolitan Park with Phases 6 and 7/8 (2 new buildings) Phase 6 Phases 7/8

Source: ZGF Architects LLP

slide-12
SLIDE 12

Pentagon City – Amazon’s Headquarters

12

Amazon HQ2

Stage 2: Redevelopment of Metropolitan Park with Phases 6 and 7/8 (2 new buildings)

Proposed Renderings of Met Park 6-8 (Source: ZGF Architects LLP)

slide-13
SLIDE 13

Pentagon City – Amazon’s Headquarters

13

Amazon HQ2

Stage 3: Redevelopment of PenPlace (multiple new buildings – likely in phases)

Met Park Phases 6-8 PenPlace

Evaluation of PenPlace Master Plan to consider:

  • 2013 adopted vision for the block
  • Guidance developed through the

Pentagon City (PDSP) Planning Study

2020 Outlook

Met Park 6-8 Final Plans & Construction

  • Final Civil Engineering Plans, Building Plans,

and Landscape Plans

  • Start of Construction
  • Anticipated completion in early 2023
slide-14
SLIDE 14

14

Pentagon City – Next Steps

Phased Development Site Plan (PDSP) will be updated through a planning study in 2020 to evaluate the local transportation network and its capacity to support future growth in this area

Pentagon City Future

slide-15
SLIDE 15

Thank You