April 3, 2017 Brian C. Burch, PE Division 14 Engineer Outline - - PowerPoint PPT Presentation

april 3 2017
SMART_READER_LITE
LIVE PREVIEW

April 3, 2017 Brian C. Burch, PE Division 14 Engineer Outline - - PowerPoint PPT Presentation

Joint Legislative Transportation Oversight Committee April 3, 2017 Brian C. Burch, PE Division 14 Engineer Outline Introduction Overview Capital Program Pre-Construction & Design Capital Program Construction Maintenance Program


slide-1
SLIDE 1

Joint Legislative Transportation Oversight Committee April 3, 2017 Brian C. Burch, PE • Division 14 Engineer

slide-2
SLIDE 2

Outline

2

Introduction Overview Capital Program – Pre-Construction & Design Capital Program – Construction Maintenance Program Division Challenges Summary – Key to Success

slide-3
SLIDE 3

3

  • Population: 354,442
  • Road miles: 4,938
  • Bridges: 1,901
  • Permanent and temporary employees: 614
slide-4
SLIDE 4

4

Major Industries and Schools

slide-5
SLIDE 5

Personnel

  • NCDOT Personnel: 15
  • Embedded Consultant: 2
  • Prime Consultants: 23

Capital Program

Pre-Construction

Capital program delivery responsibilities: $2.1 Billion over 10 Years FY 18 Expenditures: $14.4 Million Developing 44 Projects

5

49 STIP projects 93 bridge projects 14 smaller projects I-26 from I-40 to US 64 (Four Seasons Blvd) - 18.5 miles Project Cost: $208.4M A-009 Corridor K from NC 28 to US 74 18.1 mile ADHS Route Project Cost: $864M Upcoming and significant projects Balfour Parkway from NC 191 to US 64 4.6 mile Project Cost: $156.8M

slide-6
SLIDE 6

Capital Program

Construction

6

25 Roadway projects 30 Bridge projects c NC 107 Modernization from SR 1002 to NC 281 (R-4753) Project Cost: $34.9 Million NC 294 Modernization from SR 1312 to SR 13 (R-3622B) Project Cost: $8.7 Million Significant projects under construction: US 64 Caldwell Street Unbalanced Couplet in Brevard (U-5104) Project Cost: $3.9 Million US 64 Modernization from McNeely Bridge to Indian Creek (R-2409C) Project Cost: $12.2 Million Personnel NCDOT:

  • Engineers: 12
  • Inspectors: 52

CEI:

  • Engineers: 1
  • Inspectors: 66
slide-7
SLIDE 7

Maintenance Program

Maintenance and Operations

7

Personnel NCDOT:

  • Engineers: 13
  • Inspectors: 6
  • Roadway and Bridge, Traffic Services,

IMAP - $33 Million

  • Roadside Environmental - $7.7 Million
  • Bridge Preservation - $3.3 Million
  • Pavement Preservation - $8 Million
  • Contract Resurfacing - $37 Million
slide-8
SLIDE 8

HMIP Underway 2017-2018 RMIP Underway 2017-2018

8

Maintenance Program

RMIP and HMIP Program Delivery

Routes Resurfaced 540 lane miles Routes AST 942 lanes miles Routes Crack Sealed 204 lane miles Shoulder Work 1,200 shoulder miles Culverts Replaced 16,000 linear feet Signs Replaced 85,000 square feet Pavement Markings 16,000,000 linear feet Tree Line 1,970 shoulder miles

slide-9
SLIDE 9

Maintenance Program

Division Challenges – Cost of Resurfacing

  • Limited Number of Pavement Contractors and Suppliers
  • Extreme Distances Between Asphalt Plant and Project
  • Statewide Average $/Ton - $53.43
  • Division 14 Average $/Ton - $85.94

9

slide-10
SLIDE 10

Division Opportunities and Challenges

Division 14 Opportunities - ADHS

  • Appalachian Development Highway System

established by the Appalachian Regional Commission in the 1960’s.

  • Network of Highway Corridors to Create

Economic Opportunities and Jobs in Appalachia

  • Corridors A & K Left to Complete in NC
  • Corridor A – 7.5 Miles to Complete
  • Corridor K – 18.1 Miles to Complete
  • ADHS Funding in NC - $269M
  • 43.6% Work Outside the County (Clay & Graham)

10

slide-11
SLIDE 11

Division Opportunities and Challenges

Division 14 Challenges - Modernization

11

It is important to understand the geographical features that effect all transportation in the mountainous areas of the state

  • Geographical Constraints create Maintenance and Construction Challenges
  • Modernization of Existing Routes are Extremely Costly
  • R-4753 - $ 9.25M/Mile to Improve 2-lane NC 107 – Adding Paved Shoulders
  • R-2822B - $ 3.1/Mile to Improve NC 143 – R-R-R Standards
  • R-5839 - $ 27.8/Mile to Improve NC 28 – R-R-R Standards
slide-12
SLIDE 12

Division Opportunities and Challenges

Division 14 Challenges - Modernization

12

  • Modernization of NHS Routes
  • Very Expensive to Modernize
  • Lack Paved Shoulders & Standard Guardrail
  • Inadequate Pavement Structure
  • Inadequate Auxiliary Lanes (Storage/Tapers)
  • Considered our “Best Routes” – Lack of Interest in Upgrades
  • Carry High AADT
  • $84 Million in Needs
slide-13
SLIDE 13

Division Opportunities and Challenges

Division 14 Challenges – Rockfall/Slides/Floods

13

It is important to understand the geographical features that effect all transportation in the mountainous areas of the state

  • NC 28 Slide near Fontana Dam - $1.3 Million
  • US 129 Retaining Wall - $1.7 Million
  • Various Routes in Transylvania County - $600,000
  • Need to Repair Rockfall Protection on I-40 - $30,000
slide-14
SLIDE 14

Division Opportunities and Challenges

Division 14 Challenges - Terrain

  • Maintenance on Substandard Roadways/Bridges
  • Limited Area for Highway Workers to Perform Activities Safely
  • Equipment and Personnel have to Continually Reposition to Allow Safe Passage of

Traffic

  • Widths of Snowplows have to be Considered When Operating on Narrow Roads
  • Bridge Deck Overlays/Rehabilitation are Problematic
  • Resurfacing Can Exacerbate Shoulder Drop-offs

14

slide-15
SLIDE 15

Summary – Keys to Success

15

  • Project Delivery in Division 14
  • Complete ADHS – A-0009 and A-0011C
  • Work with Agency Partners
  • Maintenance and Operations
  • Be Accountable
  • Work Safely – Traffic Control
  • Respond to Emergency Situations
  • Have Adequate Personnel and Equipment for Initial Response
  • Retain Subject Matter Experts to Provide Solutions
  • Utilize Contractors for Construction of Repairs
slide-16
SLIDE 16

Thank you

16