An Anglo Platinum Group Company
World Leader in Platinum
An Anglo Platinum Group Company World Leader in Platinum RUSTENBURG - - PowerPoint PPT Presentation
An Anglo Platinum Group Company World Leader in Platinum RUSTENBURG PLATINUM CIRCUIT Pt Pd Pd Rh Rh Ir Ir Ru Ru Os A Au PMR PMR Cu Cu Low Grade Ni Ni RBMR Co Co Residues Metallics Na 2 Na 2 SO SO 4 4 Smelters
An Anglo Platinum Group Company
World Leader in Platinum
Concentrators Smelters RBMR Cu Cu Ni Ni Co Co Na Na2
2SO
SO4
4
Metallics
Mines PMR PMR
Low Grade Residues
Pt Pd Pd Rh Rh Ir Ir Ru Ru Os A Au
RUSTENBURG PLATINUM CIRCUIT
PMR FLOWSHEET
Dissolve Platinum SX Pt - Sidestream Ruthenium Distillation Ru - Sidestream Iridium SX Ir - Sidestream Value Recovery Effluent Storage Pure Metal Handling Despatch/Sales Rhodium Extraction Rh - Sidestream Osmium Level 3 Pd - Sidestream Palladium SX Au - Sidestream Gold SX
LTIFR 2000 - 2004
0.2 0.4 0.6 0.8 1 1.2
Rate
LTIFR 1 0.54 0.11 0.12 2000 2001 2002 2003 2004
SHE STRATEGY
18 001:1999 and ISO 9001:2000 status.
six Platinum rules.
SHE ACHIEVEMENTS
Rustenburg Section
RE REFINED P PLATINUM O OUNCES
1,000 1,500 2,000 2,500 3,000
Pt Pt O Oz pa pa (000)
R efined P t Ounces 1,871 2,109 2,251 2,307 2,453 2000 2001 2002 2003 2004
Rustenburg Section
CA CASH CO COST P PER R REFINED P Pt OU OUNCE
100.00 150.00 200.00 250.00 300.00 350.00 400.00 R and nd per R R efine ned P P t O Ounc nc e C ost / P t Oz 320.00 310.00 334.00 345.00 329.00 2000 2001 2002 2003 2004
Cash On Mine Cost
CASH COSTS 2004
Stores 31% Toll treatment 12% Sundries 11% Utlities 7% Labour 39%
PM PMR T TOTAL C CAPI PITAL PR PROFILE
200 300 400 500 600 700
Capex R R M Millio lion
E xpansion capex 4 22 165 520 395 Security Ongoing C apex 15 81 10 Other Ongoing C apex 8 11 18 16 38 2000 2001 2002 2003 2004
CAPITAL EXPENDITURE
PMR Capacity Increase Project Capex Profile
100,000 200,000 300,000 400,000 500,000 600,000 2001 2002 2003 2004 2005 2006 Year Capex RM 2001 2002 2003 2004 2005 2006
Latest Cost Forecast to completion: R1 238 319
PROJECT SAFETY RECORD PROJECT SAFETY RECORD
– Two Restricted Work Cases (RWC) and 11 Lost Time Injuries (LTI) to date. – Total hours worked on site: 6 215 604 – Total hours since last LTI: 1 204 064 – LTIFR (incl. RWC): 0.35 – Number of contractors on site: 235
ORIGINAL PROJECT APPROACH - Y2000
T Pt in 2000 to 3.5 million oz T Pt in 2006.
that addressed, in order of priority, identified constraints. Various areas of PMR would become constrained at different times between 2000 and 2006.
areas were expanded and were to be addressed in time to meet the constraint.
million oz T Pt equivalent production if ever required was not compromised. Modular approach to be taken where possible.
CHANGED BUSINESS SCENARIO – Y2003
– Group-wide initiative to rationalize capital expenditure on all projects. – 2.9 M oz T Pt equivalent production pa the next milestone (Y2006).
– Business benefits could be derived immediately from new / enhanced process areas e.g. new Rhodium treatment processes.
UNIQUE PROJECT FEATURES
– Live plant containing flammable, corrosive and / or explosive chemicals. – Hazards present in areas dictated timing and scopes of work.
– Construction / engineering more difficult and time consuming inside higher security areas of PMR due to security requirements. – Major new plant areas (utilities, new process areas) built outside security areas then incorporated into existing PMR at hot commissioning stages.
– Major study & scoping phase of project initiated first to identify capacity constraints. – Process / utility areas of PMR sub-divided into 32 sub-projects, all of which were constrained or affected at different times leading up to 2006. – 32 separate sub-projects, at different project phases, running concurrently.
– Security of process and commercial information a project priority.
CHANGE IN PROJECT COSTS – Y2003
(18.97%) (16.82%) Variance (296) (222) Variance (ZAR) 1 264 1 098 LCF 1 560 1 320 Approved Nominal Money Terms (ZAR millions) Constant mid 2002 Money Terms (ZAR millions)
HOW WAS THIS ACHIEVED?
identified.
project in Y2001, reached successful conclusion of first major phase.
CURRENT STATUS OF THE PMR EXPANSION PROJECT
being optimised. Commissioning of the second half is to start in July 2005.
completed in 2006.