ANGLO PLATINUM LIMITED ANGLO PLATINUM LIMITED CONCENTRATORS CONCENTRATORS
ANALYST AND FUND MANAGER VISIT ANALYST AND FUND MANAGER VISIT 27 May 2005 27 May 2005
ANGLO PLATINUM LIMITED ANGLO PLATINUM LIMITED CONCENTRATORS - - PowerPoint PPT Presentation
ANGLO PLATINUM LIMITED ANGLO PLATINUM LIMITED CONCENTRATORS CONCENTRATORS ANALYST AND FUND MANAGER VISIT ANALYST AND FUND MANAGER VISIT 27 May 2005 27 May 2005 Location Location Concentrators Concentrators capacity and context
ANALYST AND FUND MANAGER VISIT ANALYST AND FUND MANAGER VISIT 27 May 2005 27 May 2005
Capacity 30 day month Throughput aver pm 2004 RS Tailings retreatment 400,000 362,000 Frank Plant 155,000 145,000 Waterval Plant 360,000 351,000 Klipfontein Plant 120,000 109,000 Waterval UG2 Plant 400,000 419,000 Ivan Plant 120,000 141,000 Mortimer Merensky Plant 80,000 80,000 Mortimer UG2 Plant 250,000 233,000 Amandelbult Mer Plant 340,000 288,000 Amandelbult UG2 Plant 220,000 210,000 Amandelbult Opencast Plant 30,000 40,000 BRPM Plant 200,000 198,000 PPL Plant 385,000 373,000 LPM UG2 Plant 50,000 64,000 LPM Merensky Plant 80,000 85,000 Modikwa Plant 200,000 197,000 Total 3,390,000 3,295,000 Total number of Employees 3,233 Group Average Cash cost per ton milled R 42 Group Average Cash cost per Refined Pt ounce R 683
Concentrators – Concentrators – capacity and context apacity and context
Concentrator
Safety Achievements Safety Achievements
Le Lebowa bowa
Amandelbult Amandelbult - 101 IFD Mortimer - Mortimer - 281 IFD Iva Ivan
Klipfontein Klipfontein
Wval Wval UG2 UG2
Wval Wval Mer Mer
Frank Frank
PPL PPL
(IFD – Injury Free Days) Klipfontein won the MMMA safety competition for Category A for having Zero reportable injuries for the period June 03 to July 04. All the other Rustenburg concentrators received a MMMA certificate
July 04
Concentrating Strategy Concentrating Strategy
SHE Strategy SHE Strategy
and Environment in terms of Systems, People and Infrastructure.
Growth in capacity Growth in capacity
Strategic focus on Recovery Strategic focus on Recovery
Process Stability Process Stability
Process Control Drive Process Control Drive Pl Plant rec ant recipes Expert Control Systems Expert Control Systems Particle size measurement Particle size measurement as primary control input as primary control input Pl Plant:Mi ant:Mine bu ne buff ffer er
Process Process Optimisation ptimisation
Pl Plant su ant surveys rveys Circuit configuration- Circuit configuration- 2 2 concentrate & Cr concentrate & Cr2O3 Open circuit cleaning Open circuit cleaning Chemical & mineralo Chemical & mineralogical siz gical size by size on F, T and C by size on F, T and C routinely routinely Modelling Modelling of circuits
Ore typing at pilot pla e typing at pilot plant Reagent Reagent protocols protocols
New technology New technology
Grinding testing Grinding testing programme programme DMS test DMS test programme programme Reagent Reagents development development Launders & circuit desi Launders & circuit design gn
plants – Technical support, DML & Consulting Metallurgist & R&D ARC- AARL developments – Process Control Group
Enhanced process focus – Fit for Future
Recovery Imperatives Recovery Imperatives
Concentrator Manager
Plant Manager Technical Manager Resident Engineer HR Co-ordinator Accountant Shifts Day Shift Leader Section Engineer Environmental Technician Tailings Dam Metallurgist
Metal Accounting Occupational Hygiene Technologist
More focussed More focussed structure structure
Improve Smelter Recovery Improve Smelter Recovery
Mass P Pull vs Rec vs Recover very P Prof
50. 50.00 00 60. 60.00 00 70. 70.00 00 80. 80.00 00 90. 90.00 00 100. 00.00 00 110. 10.00 00 0. 0.00 00 1. 1.00 2.00 00 3. 3.00 00 4. 4.00 00 5. 5.00 6.00 00 Ma Mass P Pull Recovery Recovery KU KU20 LV LVG2 CZD CZD512 KU20 M 20 MP-REC LV LVG2 T TREND CZD CZD TRE TREND
Cost Reduction Cost Reduction
Rustenburg Rustenburg Section ection Anglo Platinum Concentrators Anglo Platinum Concentrators
Concentrator profile supports mining profile
Concentrator Tons Treated
20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 2002 2003 2004 Tons 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% %UG2 Underground Tons Tailings UG2% (excluding WLTR)
Rustenburg Rustenburg Section ection
Combined Head Grade (4E) Excluding Western Limb Tailings
3.00 3.20 3.40 3.60 3.80 4.00 4.20 4.40 4.60 4.80 2002 2003 2004
Combined
Anglo Platinum Concentrators Anglo Platinum Concentrators
Rustenburg Rustenburg Section ection
Head Grade (4E)
2.00 3.00 4.00 5.00 6.00 2002 2003 2004 Platreef Merensky UG2 Tailings
Anglo Platinum Concentrators Anglo Platinum Concentrators
Rustenburg Rustenburg Section ection
Recoveries (4E)
72.00 74.00 76.00 78.00 80.00 82.00 84.00 86.00 88.00 2002 2003 2004
10.00 15.00 20.00 25.00 30.00 35.00 40.00 Platreef Merensky UG2 Tailings
Anglo Platinum Concentrators Anglo Platinum Concentrators
Rustenburg Rustenburg Section ection
Concentrator Cash Cost per Ton Milled
0.0 10.0 20.0 30.0 40.0 50.0 60.0
Year R/t milled
R/ton milled 38.8 40.5 42.1 2002 2003 2004
Anglo Platinum Concentrators Anglo Platinum Concentrators
Rustenburg Rustenburg Section ection
Concentrator Cash Cost per Equivalent Refined Pt OZ
100 200 300 400 500 600 700 800 Year R/Pt oz R/Pt oz 543 607 683 2002 2003 2004
Anglo Platinum Concentrators Anglo Platinum Concentrators
Key Business Issues Key Business Issues