AMPO Conference, October 2017 Dave Hutchinson, Executive Director
AMPO Conference, October 2017 Dave Hutchinson, Executive Director 1. - - PowerPoint PPT Presentation
AMPO Conference, October 2017 Dave Hutchinson, Executive Director 1. - - PowerPoint PPT Presentation
AMPO Conference, October 2017 Dave Hutchinson, Executive Director 1. I T S THE LAW SO WE HAVE TO 1. I T S THE LAW SO WE HAVE TO 2. M AKE IT ABOUT MONEY Performance Measures Invest resources in IMPLEMENTATION projects cts to
- 1. IT’S THE LAW SO WE HAVE TO
- 1. IT’S THE LAW SO WE HAVE TO
Invest resources in
projects cts
to achieve individual
targets ts
that collectively will make progress toward national
goals ls.
- 2. MAKE IT ABOUT MONEY
Performance Measures IMPLEMENTATION
- Reviewed 2040 Long Range Transportation
Plan Goals
- Collected and analyzed consistent, readily
available data
- Aligned MPO project prioritization with
mandated performance measures
- Implemented new scoring criteria with 2017
call for projects
- 2. MAKE IT ABOUT MONEY
Desoto Bridge $7.5 Million for PD&E
SAFETY/SECURITY: High Crash Location Evacuation Route INFRASTRUCTURE CONDITION: Fair MOBILITY/CONGESTION/RELIABILITY: Low Reliability High Congestion ECONOMY/FREIGHT: High Truck Volume Major Commuter Route ENVIRONMENT/LIVABILITY: No Pedestrian/Bike Facilities
- 3. IT’S A CHANCE TO CHANGE FOR THE BETTER
Spec ecia ial l Flood
- d Hazar
zard d Area ea
INFRASTRUCTURE CONDITION
stat ate e of good repair air
RESILI SILIENC NCY: Impr prove ve the e resili siliency ency and nd reli liabili bility ty of the trans anspor
- rtati
ation
- n sys
ystem tem and nd redu duce ce or mitiga tigate te stormw rmwater ter impacts pacts of surface ace trans anspor
- rtati
ation
- n.
FA FAST T Act
- 4. TAKE YOUR TIME AND TELL THE STORY
MAP 21 / FAST Act SAFETY AND SECURITY
Significant reduc ucti tion
- n in
traf affic ic fatali lities ties and nd seriou rious s injuri uries es on all public roads
Most t danger angerous
- us metro
- area
ea for wa walki lking g in the e Uni nited ted St States tes
Dan ange gerou
- us
s by Design ign 2016
#10 10
Flori rida a Top 20 Coun unti ties es Pedestr estrian ian and nd Bicy cycle cle Injur juries es and nd Death aths
8
- 4. TAKE YOUR TIME AND TELL THE STORY
Safety Audits $116,000 for Planning
SAFETY TARGETS:
Number of fatalities Rate of fatalities Number of serious injuries Rate of serious injuries Number of non-motorized fatalities and non-motorized serious injuries
- 4. TAKE YOUR TIME AND TELL THE STORY
2017-2018 2017-2018 2018
Performance Measures TIMELINE
- Februar
ruary 27, 2018 18
- Safety, Security
Performance Measure Targets
- Novemb
ember er 16, 2018 18
- Infrastructure, Freight,
Mobility, Congestion, Reliability Performance Measure Targets
- 4. TAKE YOUR TIME AND TELL THE STORY
MA MAP-21 21 (2012)
2)
Mov
- ving
ing Ahe head ad fo for Progress ss in the 21 21st t Centu tury y Act
FAS AST Act ct (2015)
5)
Fixing America’s Surface Transportation Act
Inv nves est resources rces in projec ects ts to to achieve e indiv ividu idual al targ rgets ets th that collecti ectivel ely y will make e progress ess to toward national
- nal goals.
- 5. BE THE BROKEN RECORD. BE THE BROKEN RECORD.
- 5. BE THE BROKEN RECORD. BE THE BROKEN RECORD.
In Invest t re resour
- urces
ces in n
pr proje jects cts
to ac achi hieve ve ind ndividua idual l
tar argets gets
Th That at coll llectiv ctively ely will l make ake pr progress ress towar ard d na nati tional nal
goal als.
- 6. BORROW FROM THE BEST
October 21, 2015 2015 AMPO Annual Conference
Performance-Based Planning Weighting Performance Measures as a Method to Refine Project Evaluation
Chattanooga-Hamilton County/N. GA Transportation Planning Organization
- 6. BORROW FROM THE BEST
Chattanooga-Hamilton County/N. GA Transportation Planning Organization
- 7. DIG FOR DATA
2015 Na Nati tiona
- nal
l Bridge idge Inventor entory
- Re
Read adil ily y avai availa labl ble
- Ea
Easily y un unde derstood tood
- Gener
neral ally ly ac accepted epted
- Cons
nsis istent tent ac across ss jur urisd sdic iction tions
- Sup
uppl plem ement ntal al to re requ quired red da datas asets ts
- 8. SEEK OUT NEW STAKEHOLDERS
- 9. COMMITTEES ARE KEY
- TEC
ECHNI HNICAL AL ADVISO VISORY RY COMMITTEE MITTEE WO WORKSH RKSHOPS PS
- BO
BOARD ARD SUB UB-COMM COMMIT ITTEE TEE
- 10. EXPERTS ARE ALWAYS FROM OUT OF TOWN