Dave e Wilki lkins, ns, Senior ior Vice e Pres esid iden ent, t, Hilcor lcorp p Alaska ka Al Alyesk ska Leadership dership Presenta esentation tion February ruary 14, 2018 Integrity Urgency Ownership


slide-1
SLIDE 1

Integrity • Urgency • Ownership • Alignment • Innovation Dave e Wilki lkins, ns, Senior ior Vice e Pres esid iden ent, t, Hilcor lcorp p Alaska ka

Al Alyesk ska Leadership dership Presenta esentation tion – February ruary 14, 2018

slide-2
SLIDE 2

Hilcorp Alaska Workforce

Year End 2012 255 Employees 96% Alaska Residents Year End 2013 316 Employees 97% Alaska Residents Year End 2014 505 Employees 88% Alaska Residents Year End 2015 515 Employees 89% Alaska Residents Year End 2016 502 Employees 88% Alaska Residents Year End 2017 517 Employees 89% Alaska Residents

slide-3
SLIDE 3

Hilcorp Alaska (HAK) Who are We?

  • Map here

Cook Inlet Operations

slide-4
SLIDE 4

Hilcorp Alaska (HAK) Who are We?

  • Map here

North Slope Operations

slide-5
SLIDE 5

Hilcorp Cook Inlet Basin

Gross Gas Production 2012-2018

205,490 MCFD

slide-6
SLIDE 6

Hilcorp North Slope and Cook Inlet

Oil Production 2012-2018

53,070 BOPD

slide-7
SLIDE 7

Hilcorp North Slope and Cook Inlet

Net BOED Production 2012-2018

55,928 net BOEPD

slide-8
SLIDE 8

Moose Pad – Q4 2018 (+15,000 BOPD) Liberty – Q4 2022 (+70,000 BOPD)

Hilcorp Net Production

slide-9
SLIDE 9

Milne Point: Moose Pad

  • First new pad at Milne Point since

2002

  • 50-70 wells
  • First production ~ November 2018
  • Peak production 16,000 BOPD in

2020

  • Estimated 30-50 MMBO EUR

(Estimated Ultimate Recovery)

slide-10
SLIDE 10

Milne Point: Polymer Flooding

Injector

Producer

  • FIRST EVER polymer flood implemented on the Slope
  • Estimated 50% Increased Recovery
  • 30 MMBO- 50 MMBO opportunity
slide-11
SLIDE 11

Liberty Project

70,000+ BOPD Peak Production $1 Billion+ Investment Modeled after proven technology 20-30 Years Field Life

slide-12
SLIDE 12

OOOGURUK ISLAND NIKAITCHUQ ISLAND NORTHSTAR ISLAND ENDICOTT LIBERTY ISLAND

Operated by: Caelus Constructed in 2007 Island Surface: 6 acres Water Depth: 4.5 feet Subsea Pipeline: 5.7 miles Operated by: Hilcorp Constructed in 2000 Island Surface: 7 acres Water Depth: 40 feet Subsea Pipeline: 6 miles Operated by: Hilcorp Constructed in 1987 Island Surface: 45 acres Water Depth: ~4 feet Subsea Pipeline: none Operated by: ENI Petroleum Constructed in 2011 Island Surface: 11 acres Water Depth: 8 feet Subsea Pipeline: 3.8 miles Operated by: Hilcorp Construction: tbd - 2019 Island Surface: 9.3 acres Water Depth: 19 feet Subsea Pipeline: 5.6 miles