AGROLIBANO PRESENTATION REMOVED POWER LINES THAT WERE LOCATED OVER THE MELON FIELDS AND RELOCATED THEM OVER THE ROADS IN PERIMETER AREAS ALL IN THE FIELD HAVE BEEN REMODELED TO ELIMINATE THE POSSIBILITY THAT PEOPLE COULD WASH THEIR HANDS


  1. AGROLIBANO PRESENTATION

  2. REMOVED POWER LINES THAT WERE LOCATED OVER THE MELON FIELDS AND RELOCATED THEM OVER THE ROADS IN PERIMETER AREAS ALL IN THE FIELD HAVE BEEN REMODELED TO ELIMINATE THE POSSIBILITY THAT PEOPLE COULD WASH THEIR HANDS WITH WATER GATHERED IN THE COLLECTION BARREL. THE COLLECTOR BARREL IS NOW CLOSED. FIELD SANITARY FACILITIES ARE MOUNTED ON A MOBILE TRAILER WITH: 1. A PAIR OF TOILETS 2. WATER DISPENSER TO RINSE AND WASH HANDS IN A SINK WITH A CLOSED WASTE WATER COLLECTION TANK 3. DISINFECTANT SOAP DISPENSER 4. PAPER TOWEL DISPENSER AND A TOWEL DISPOSAL L CONTAINER.

  3. ALL SANITARY FACILITIES ARE MOUNTED ON MOBILE TRAILERS THAT WILL BE TRANSPORTED TO AND FROM THE FIELDS TO A DESIGNATED SANITATION AND SUPPLY AREA AWAY FROM THE FIELDS. THIS DESIGN ALLOWS ALL SERVICE TO BE PERFORMED OUTSIDE OF THE FIELDS. . C O NSTRU CT ION O F T H E S E P T I C T A NK

  4. SANITATION AND SUPPLY AREA CLEANING AND SANITATION PROCESS

  5. SANITATION AND SUPPLY AREA AGROPECUARIA MONTELIBANO HAS STRENGTHENED ITS PROTOCOL TO REDUCE RISK ON ANIMAL PRESENCE IN THE FIELDS AND HAS INSTALLED A NEW 2 METER HIGH METALLIC SMALL MESH FENCE AROUND THE LOTS WITH POTENTIAL RISK OF SMALL ANIMAL INTRUSION.

  6. FINISHED FENCES WE HAVE COMPLETELY MODIFY OUR IRRIGATION SYSTEM, DRILLING 6 NEW DEEP WELLS, SO ALL OUR CANTALOUPES ARE GROWN IN SANTA ROSA FARM AND ONLY IRRIGATED WITH WELL WATER 1 WELL BONGAS 5 2 WELL GOMEZ 2 3 WELL BONGAS 4 4 WELL PISTA 3 5 WELL BOMBA 4 6 WELL EXPERIMENTO

  7. CHLORINATION SYSTEM We installed a Chlorination system in the irrigation stations. This is a backup system, which will be used only if we experience any microbiological risk of well water. STATIONS

  8. REMOVAL OF HYDRO-COOLER AND REBUILDING THE PACKING LINES

  9. Packing House Santa Rosa Packing House Santa Rosa

  10. Packing House Montelibano Packing House Montelibano

  11. ALL FLOORS AND DRAINAGE IN THE PACKING HOUSE HAVE BEEN RENEWED Changing of Floor Surface SANTA ROSA Packing House

  12. Changing of Floor Surface SANTA ROSA Packing House Changing of Floor Surface SANTA ROSA Packing House

  13. Changing of Floor Surface MONTELIBANO Packing House MELONS WILL BE DISCHARGED INTO A TANK WITH CHLORINATED WATER (150- 200 PPM) AT ROOM TEMPERATURE. THERE IS A WRITTEN SOP TO MONITOR THE MELON FLOW AND WATER & MELON TEMPERATURE

  14. WE MODIFIED SOP FOR THE SANITATION OF BASKETS WHICH INCLUDES PRE-HARVEST DEEP CLEANING AND DISINFECTION, MONTHLY WASHING WITH BRUSHES, DAILY DISINFECTION IN DUMPING TANKS, AND DAILY DISINFECTION AFTER EACH USE

  15. WORKING TO EXCEED EXPECTATIONS…

  16. We did not plant in the tractor path row, because we determined this was the area with the highest irrigation leakage risk due to soil compaction. This represents 14% less of the planting area

  17. WASHBASIN SET Disinfecting tractor tires on the mobile toilets in the cleaning and sanitation area

  18. SANTA ROSA FARM MONTELIBANO FARM

  19. OTHER IMPROVEMENTS

  20. Field workers food and resting areas Montelibano farm Field workers food and resting areas Santa Rosa farm

  21. SIGN SYSTEM

  22. IN TOTAL WE HAVE INVESTED $ 804,281.32

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.