SLIDE 10 2020 Carmichael Water Rate Study August 17, 2020 Board Meeting 10
Detailed Capital Spending - Production
FY2021/22 FY2022/23 FY2023/24 FY2024/25 FY2025/26 FY2026/27 FY2027/28 FY2028/29 FY2029/30 FY2030/31 Production
1 Existing Well/Pump Replacement $150,000 2 New Wells - share w/ SSWD and 1 new well $750,000 $750,000 SWTP 3 Membrane Replacement $150,000 $150,000 $75,000 $75,000 $675,000 $225,000 $335,000 $180,000 $180,000 $90,000 4 SCADA Improvement w/ PLC Upgrade $500,000 5 6 Block Skid Replacement (2nd) $200,000 6 Breaker Replacement (Multiple) $100,000 7 48 Block Replacement or Upgrade $300,000 $300,000 8 Filter (90 Block) replacement $0 Reservior Storage & Well Pumps 9 Dewey BP station - pump replacement, A/C, electrical $200,000 10 Dewey Tank Rehab & Painting $250,000 11 Willow Park Well Pump Replacement $150,000 12 GW Study - additional wells and treatment $150,000 Water Production General 13 Vehicles - 2 vehicles in 10 years $45,000 $45,000 14 Building A/C - control froom $45,000 15 Compressor Replacement - last of 3 $100,000 16 Furniture & Carpet - BWTP $45,000 17 300 hp RW Pumps (3) $100,000 $100,000 $100,000 16 Chemical Tank Rehab $75,000 18 Chemical Feed Pumps $25,000 19 Security Upgrade $100,000 20 Instrumentation Upgrade $45,000 $50,000 21 Generator Replacement or Upgrade $300,000 22 Electrical Transfer Gear Replacement $1,000,000 Techinical Services & Reports 23 SCADA Upgrade Study $75,000 24 BWTP Intake Capacity Study (Ranney) $400,000 Total Operating Expenses $1,150,000 $1,225,000 $1,560,000 $1,375,000 $820,000 $525,000 $705,000 $655,000 $380,000 $190,000
Detailed Capital Spending – Distribution Vehicles and Equipment
Asset Description Current Age Purchase Cost Current Miles/Hours 21/22 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30 30/31 Dodge 3500 Flatbed, Welding and Cutting 19 $30,573 27,106 75,000 Ford F‐150 Pickup, Superintendent 18 $21,301 63,865 34,000 Ford F‐150 Pickup, Mounted Sign Board 13 $15,610 76,113 35,000 Ford F‐550 Service Truck, Utility 4 $63,000 26,711 70,000 Ford F‐550 Service Truck, Utility 4 $63,000 28,040 70,000 Ford F‐550 Service Truck, Utility 3 $64,000 18,542 70,000 Ford F‐150 Pickup, On‐Call 2 $26,500 11,761 35,000 New Holland Ford Yard Loader 18 37,588 $ 1,316 70,000 John Deere 310SE Backhoe 20 65,450 $ 3,569 John Deere 410G Backhoe 14 65,457 $ 3,273 140,000 John Deere 410G Backhoe 13 66,627 $ 2,932 150,000 Ditch Witch 1230 Trencher w/1 Axle Trailer 24 8,584 $ N/A 9,500 Tow Master 2 Axle Trailer 16 6,590 $ N/A 12,000 Ditch Witch 800 gal Vacuum Excavator 3 32,167 $ 626 65,000 Vac‐Tron 500 gal Vacuum Excavator 1 45,835 $ 25 70,000 Valve Exercising Trailer TBD TBD TBD 70,000 Target Pac‐IV Concrete Saw 26 3,473 $ N/A 7,000 Wacker Compactor BS62Y 25 2,300 $ N/A 5,500 Bomeg Compactor 20 2,464 $ N/A 5,500 Wacker Compactor BS600 24 2,654 $ N/A 5,500 Millermatic Vintage Welder 24 2,584 $ N/A 5,000 Miller Bobcat 225NT Welder/Generator 23 2,840 $ 175 10,000 7,000 Light Tower Trailer 18 5,632 $ N/A 7,500 Pierce Arrow Tool 17 2,500 $ N/A 3,000 3,200 Pipe Locator 18 4,200 $ N/A 5,000 5,000 5,000 Pipe Tapping Machine 22 2,500 $ N/A 5,000 Pipe Tapping Machine Air Operator 20 4,500 $ N/A 5,200
Detailed Capital Spending – In-House Services
Asset Description 21/22 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30 30/31 Cost 2010 Service Line Replacements 302,000 303,400 309,600 312,600 315,900 319,100 328,500 331,800 338,400 341,800 3,203,100 $ Main Line Valve Replacements 85,300 86,200 88,400 89,600 90,200 101,600 105,300 106,200 108,800 110,300 971,900 $ Fire Hydrant Replacements 68,200 69,500 70,800 72,200 73,600 75,000 76,400 77,800 79,300 80,800 743,600 $ Impacts from Sac County Projects 125,000 125,000 125,000 125,000 125,000 125,000 125,000 125,000 125,000 125,000 1,250,000 $