MBTA Key Bus Route Improvement Program

Community Meeting Route 73

June 7, 2012 Beech Street Center Belmont

06/07/2012 2

Welcome and introductions Safety briefing/Accommodations Key Bus Route Program overview Existing conditions Recommendations Next Steps Discussion

Agenda

2

slide-2
SLIDE 2

6/8/2012 2

06/07/2012

Introduction

Enhancements to 15 Key Bus Routes Funded by $10 million ARRA grant

3 06/07/2012 4

Coordination with municipalities Development of initial concepts Community meeting Incorporation of public comments Refinement of concepts Design and construction

Implementation Process

4

slide-3
SLIDE 3

6/8/2012 3

06/07/2012

Key Bus Route Goals

Reliability

less bus bunching, improved on-time performance

Faster service

Less stops, shorter trip times, fewer delays

Improved accessibility

for seniors and persons with disabilities

Passenger amenities

Shelters, benches, signage, trash receptacles

5 06/07/2012 6

Ongoing project initiated by Town of Belmont to improve Trapelo Rd/Belmont St corridor Full-depth reconstruction & streetscape improvements Project tentatively scheduled to be advertised for construction bids this year; construction would begin in early 2013 and last 2 years Many improvements to Route 73 will be made in coordination with the project

Town of Belmont/MassDOT Trapelo Road & Belmont Street Roadway Reconstruction

6

slide-4
SLIDE 4

6/8/2012 4

06/07/2012 7 7 06/07/2012

Bus stop too short Bus stops too close Signage issues Poorly located boarding area

Typical Conditions

slide-5
SLIDE 5

6/8/2012 5

06/07/2012

Improved Accessibility

Legal Mandate

All bus doors must open at curb Deter cars from parking in stops

Providing accessible curb access requires longer bus stops

Bus Stops must meet current guidelines for 40’ & 60’ buses

06/07/2012

Farside – 60-65ft Nearside – 90-100ft Midblock (or after left hand turn) – 100-110ft

Required Bus Stop Lengths

40’ bus

10

slide-6
SLIDE 6

6/8/2012 6

06/07/2012 11

Reliability Issues

Bus ‘bunching’ Overcrowding On-time performance

11 06/07/2012

Appropriate distance between stops Sufficient length to allow buses to pull to the curb Clear boarding/alighting area Not blocking crosswalks or driveways Considerate of adjacent traffic and parking

Preferred Bus Stop Locations

12

slide-7
SLIDE 7

6/8/2012 7

06/07/2012

Ridership – customer boardings and alightings Proximity to schools, medical centers etc Reducing traffic congestion Parking impacts Potential to add amenities – shelters, benches etc. Distance to adjacent stops

Reliability and Faster Service: Stop Location Considerations

13 06/07/2012

Optimized Bus Stop Spacing

Ideal spacing is one stop every 750-1,320 ft (4-7/mi) Resulting walk time: 4-6 min Route 73 has an average of approximately 700 ft Some stops as close as 400 ft

14

2112 2111

slide-8
SLIDE 8

6/8/2012 8

06/07/2012 15

Benefits Shortens bus trip times Improves service reliability Minimizes “stop & go” experience Provides additional parking spaces Ability to provide better stop amenities

Bus Stop Consolidation

15 06/07/2012

Improved Amenities

Shelters Benches Pavement markings Trash receptacles

16

slide-9
SLIDE 9

6/8/2012 9

06/07/2012 17

Bus Arrival Times

17 06/07/2012

Route 73: Overview

Harvard Sq. to Waverley Sq. Connects to:

MBTA Red Line MBTA Bus Routes 554, 66, & others

MBTA’s 13th busiest route

Over 6,000 avg. daily boardings

Approximately 3.9 miles long

  • Rt. 73 Stops

(not including overlap with Rt. 71) 19 IB (toward Harvard) 17 OB (toward Waverley) Peak hour headways every 5-10 minutes On-time performance 83% Weekday

Source: MBTA Service Planning, May 2012

18

slide-10
SLIDE 10

6/8/2012 10

06/07/2012

Proposed Recommendations Route 73

19 06/07/2012

Explanation of Maps

Existing Existing Proposed Proposed

20

slide-11
SLIDE 11

6/8/2012 11

06/07/2012 21

Trapelo @ Church IB Add shelter behind sidewalk.

2099

06/07/2012 22

Trapelo @ Hawthorne OB Remove stop to improve stop spacing and due to insufficient length ‐ 500’ to next stop at

  • Waverley. Reinstate 3 parking spaces.

2132

slide-12
SLIDE 12

6/8/2012 12

06/07/2012 23

Trapelo @ Beech IB Add shelter with curb extension.

2102

06/07/2012 24

Trapelo @ Bartlett IB Relocate to nearside of Harding and investigate

  • shelter. Remove 3 parking spaces; no parking gain

at existing stop.

2102

slide-13
SLIDE 13

6/8/2012 13

06/07/2012 25

Trapelo @ Poplar IB Remove stop to improve stop spacing and due to insufficient stop length – 450’ to next stop at

  • Williston. Reinstate 4 parking spaces.

2105

06/07/2012 26

Trapelo @ Common IB (Cushing Sq)

Relocate stop to proposed curb extension nearside

  • f Williston, to improve traffic flow and commercial

parking availability. Add shelter. Remove 2 parking spaces, and reinstate 2 spaces at existing stop.

2106

slide-14
SLIDE 14

6/8/2012 14

06/07/2012 27

Trapelo @ Common OB (Cushing Sq)

Relocate stop to opposite Williston to improve traffic flow and commercial parking availability. Remove 2 parking spaces. Reinstate loading zone at existing stop.

2127

06/07/2012 28

Trapelo @ Oak OB Relocate stop to midblock before Willow to improve stop spacing. Remove 5 parking spaces. Reinstate 2 parking spaces at existing stop.

2126

slide-15
SLIDE 15

6/8/2012 15

06/07/2012 29

Belmont @ Oakley OB Relocate stop to farside of Oakley. Remove 2 parking spaces, and reinstate 4 spaces at existing stop.

2125

06/07/2012 30

Belmont opp Oakley IB Remove stop due to low ridership, improve stop spacing and insufficient length – 600’ to closest stop. Reinstate 1 parking space.

2109

slide-16
SLIDE 16

6/8/2012 16

06/07/2012 31

Belmont opp Payson IB Add shelter with curb extension.

2110

06/07/2012

2111

32

Belmont @ Carver IB Remove stop to improve stop spacing – 500’ to closest stop. Maintain no parking.

slide-17
SLIDE 17

6/8/2012 17

06/07/2012 33

Belmont @ Winsor IB Relocate stop to nearside Langdon to provide bus door access to curb. No parking impact.

2112

06/07/2012 34

Belmont @ Woodleigh IB Relocate stop to nearside Woodleigh to provide bus door access to curb. Remove 2 parking spaces, and reinstate 1 space at existing stop.

2113

slide-18
SLIDE 18

6/8/2012 18

06/07/2012 35

Belmont @ Falmouth OB Relocate stop to farside of Falmouth due to insufficient stop length and driveway. Remove 2 parking spaces. No parking gain due to crosswalk curb extension.

2122

06/07/2012 36

Belmont @ Templeton IB

Remove stop to improve traffic flow and stop spacing – 400’ to previous stop at Woodleigh. Maintain no parking.

2114

slide-19
SLIDE 19

6/8/2012 19

06/07/2012 37

Belmont @ Marion OB Relocate stop to farside of Marlboro to provide bus doors access to curb. No parking impact.

2121

06/07/2012 38

Belmont @ Oxford OB

Remove stop to improve stop spacing – 400’ to

  • Marlboro. No parking gain due to crosswalk curb

extension.

2120

slide-20
SLIDE 20

6/8/2012 20

06/07/2012 39

Belmont @ Prentiss IB Add shelter with curb extension.

2115

06/07/2012 40

Belmont @ Brimmer IB

Remove stop due to low ridership and to improve stop spacing. Reinstate 1 parking space. Distance to Prentiss 500’.

21171

slide-21
SLIDE 21

6/8/2012 21

06/07/2012 41

Belmont opp Cushing IB

Relocate stop to farside of St. Mary’s to improve stop

  • spacing. Remove 2 parking spaces and reinstate 2‐3

spaces at existing stop. Add narrow shelter.

2117

06/07/2012

Summary of Recommendations – Route 73

Add shelters, benches, trash receptacles Lengthen stops for accessibility Relocate stops Consolidate stops

Current Stop Plan 19 IB/17 OB Proposed Stop Plan 14 IB/15 OB

Sidewalk improvements

42

slide-22
SLIDE 22

6/8/2012 22

06/07/2012

Summary of Proposed Recommendations

43

IB OB Total Total Stops 19 17 36 Existing stops lengthened 9 7 16 Proposed stops relocated 5 5 10 Proposed stops eliminated 5 2 7 Proposed curb extensions 3 1 4 Proposed shelters 7 7 Proposed benches 6 6

06/07/2012

Public Outreach

Community meetings for each route Flyers, e-mail blasts, mailings, newspaper ads Outreach to public and elected officials Key Bus Route project website

44

slide-23
SLIDE 23

6/8/2012 23

06/07/2012 06/07/2012

Comments and Next Steps

Project Updates at www.mbta.com/keybusroutes Mail to MBTA Operations and Service Development, 45 High St, Boston, MA 02110 Email to keybusroutes@mbta.com Submit comments by Thursday, June 21, 2012 Discussion

46