admini nistration n proced edures es agend nda
play

ADMINI NISTRATION & N & PROCED EDURES ES Agend nda - PowerPoint PPT Presentation

Modul ule 3 3: ADMINI NISTRATION & N & PROCED EDURES ES Agend nda Ove vervi view o of ReZo eZone Syracuse P e Projec ect Overview of Module 3 3: Admin inistratio ion a and Pro rocedu dure res Quest


  1. Modul ule 3 3: ADMINI NISTRATION & N & PROCED EDURES ES

  2. Agend nda • Ove vervi view o of ReZo eZone Syracuse P e Projec ect • Overview of Module 3 3: Admin inistratio ion a and Pro rocedu dure res • Quest stions s and D Discuss ssion 2

  3. PROJECT OVERVIEW 3 3

  4. Proje ject O Overvie iew • Project I Initiation Fall 2015 Public input - Spring 2016 • Research a and Analy lysis is • Technical R l Review a and May Public input 2016 Asse sessm ssment R Report June • Annotated O Outlin line 2016 • Content Drafting ng 2016/2017 Public input • Final Re Review a and A Adop option on o of Early Public input 2018 Ordina nanc nce/Map 4

  5. Dr Drafti ting th the New O Ordinance Module 1: Zoning Districts and 1 Use Regulations • What can I do on my property? • Where can I do it? • How much / how big? 2 Module 2: Development Standards • What level of quality is required? • What about redevelopment? Module 3: Administration and 3 Procedures • How do I get a project approved? • Are there exceptions? 5

  6. Dr Drafti ting th the New O Ordinance 1 • Staff Draft • Public Draft Late 2017 Consolidated Draft 2 • Staff Draft Early 2018 • Public Draft Adoption Draft Staff Review Additional Public Meetings 3 • Staff Draft Adoption • Public Draft Final Ordinance 6

  7. Assessm ssment R Report 1. 1. Create a a User-Friendly y Ordinanc nce 2. Update t 2. e the Z e Zoning D Dist stricts s to Implement t the L LUDP 3. Modernize t 3. the L Land U Uses 4. 4. Streamline t the D Develop opment Review P Proc ocedures 5. 5. Introduce U Uniform S Standards to Improve t the Q Quality o y of Develop opment 7

  8. Assessm ssment R Report • Important p procedural steps are not c clear • All deve velopme ment p proposals (big or small) s subject t to to essenti tially t the same p procedures • Heavy reliance on Project t Site te Review a and S Special U Use P Permits ts – To address quality – Lack of predictability and consistency • Gene neral inf nflexibility re resul ults i in n many variance, w waivers, o or excepti tion ons 8

  9. Assessm ssment R Report Recommen endations: S Strea eamline P e Proced edures es • Clarif ify r responsib ibilit itie ies a and standardize p procedures • Incorporate e existing p g procedures s that work well • Introduce n new re review p proc ocedures that i include: – Major v minor project thresholds – Expanded administrative approvals 9

  10. ReZone Syracu cuse – Outline ne Article 1 1 – General P l Provis isions 1 Article 2 2 – Zonin ing D Distric icts Article 3 3 – Use R se Reg egulations 2 Article 4 4 – Develop opment S Standards Article 5 5 – Administration/ P Procedures 3 Article 6 6 – Definitions 10

  11. Article 1 GENERA RAL P PRO ROVISIONS 11 11

  12. Article 1 1: General P Prov ovisi sion ons 1.1 Title/Effective D Date 1.2 Purpo pose 1.3 Authority 1.4 Appli licabili lity a and Jurisdiction 1.5 Nonc nconf nformities 1.6 Enforcement 1.7 Severability 1.8 Trans nsition f n from P Prior Regula lations ns 12

  13. Nonc nconf nformit ities ies? (Uses, s structures, lots, s signs) • Tradition onal/st stricter a approa oaches: s: Nonconformit itie ies m may remain in, b but n no substantia ial modifica cations w without f full c code c compliance ce – Faster implementation of new plans/policies – Greater uniformity and easier administration • More l liberal a approaches: A wider r range o of modific icatio ions w will b be consid idered – High standards can discourage infill and redevelopment, especially on challenging sites – Nonconformities often provide unique character 13

  14. Nonconformit itie ies Propose osed S Syracuse se approach ch fo for u uses, structures, s, l lots: s: • Nonconf nformities c can con ontinue, b but n no m major or expansi sion ons Policy Qu Question: • To what e exte tent d do we requ quire r redevelo lopme ment projects t to upgrade t to meet n new s standa dards ds? 14

  15. Nonc nconf nforming ng Site F Featur ures Parking 15

  16. Nonc nconf nforming ng Site F Featur ures Loading ng A Area S Screeni ning 16

  17. Nonc nconf nforming ng Site F Featur ures Buffer ering a and S Screen eening 17

  18. Nonc nconf nforming ng Site F Featur ures Propose osed App pproach Establish shes t s triggers f s for w when s site f features a are r required t to be brought in into c complia iance w wit ith n new ordin inance Off-Street P Of Par arking • – Increase in building area by ≥50% over 2 -yr period – Remodeling ≥ 50% of assessed value over 2 -yr period Buffers, L Lan andscap aping, g, S Screening, g, L Ligh ghting • – Increase in vehicular use area – Increase in building area by 500 square feet or 20% – Building elevation changes by 50 percent – Increase in outdoor storage areas • Gene nerally lly: a a balance b between c complia iance w wit ith n new stand ndards, b but not d discour uraging ng r reinv nvestment nt 18

  19. Article 5 ADMINIS ISTRATIO ION A AND PROCED EDURES ES 19 19

  20. Artic icle e 5: Adminis inistratio ion n & Proced edur ures es 5.1 Purpose a and Organi nization 5.2 Summ mmary T Table o of Proc ocedures 5.3 Comm mmon R Review Proc ocedures 5.4 Develo lopment nt P Permits Proc ocedures 5.5 Flexibili lity a and R Relief Proc ocedures 5.6 Ordinanc nce A Amend ndment nt Proc ocedures 5.7 Review & & Decision-Mak Making Bodies 20

  21. Summary Table e of Rev evie iew Proced edur ures es 21

  22. Common Re Review P Pro rocedure res • Apply t to multip iple s specif ific ic 1 app pplication t types. Pre-Application Conference ( 5.3.B ) • Prevent r t repeti titi tion ( (and Application Submittal and 2 Processing ( 5.3.C ) Submittal potential i incon onsi sist stency) and Internal Review 3 Staff Review and Action ( 5.3.D ) wit ithin s specif ific a appl plication proced edures es. Scheduling and Notice of Public 4 Hearings ( 5.3.E ) Hearings and Decision- • Speci cific a c applica cation Making 5 Review and Decision ( 5.3.F ) proced edures es r refer er b back t to Post-Decision Actions and 6 common r rev eview p proced edures es. Limitations ( 5.3.G ) 22

  23. 5.4: : Dev evel elopment ent Permit it Proced edur ures es • Site P Plan R Review[new] Administrative Manual • Special ial U Use P Permit it Not part of Zoning • Ordinance • Sign R Review Can be physical • • Temporary U Use P Permit [new] manual or online content • Certif ific icat ate o of includes application • submittal Appr ppropr priateness requirements, review time periods, fees, • Cons nstruc uction P n Plans ns [new] and other technical information 23

  24. 5.4: Develop opment P Permits Site P e Plan R Rev eview ew ( (5.4A) • Replaces P Proje ject S Sit ite R Revie iew wit ith new sit ite p plan revie iew ( (min inor and m majo jor) • Site plan re review is common i in NY and across t the country ry 24

  25. 5.4: Develop opment P Permits Site P e Plan R Rev eview ew ( (5.4A) Ensur ures c complianc nce w with d design & n & development nt s stand ndards • Applic icabil ilit ity • – New construction – Alteration, repairs, additions that increase GFA ≥25% – Exterior renovations facing street – Demolitions – Projects affecting landmarks and eligible properties Exemptions • – Change in use, conversion up to three dwelling units, small alterations, etc. Site p plan a n approval r requi uired p prior t to s submitting ng c construc uction p n plans ns • – (unless applicant opts to submit concurrently) Referra rral: A Administra rator r may ay refer m minor or s site p plans t to P PC • 25

  26. 5.4: Develop opment P Permits Spec ecial U Use P e Permits ( (5.4B) B) • Requires a a public hearin ing t to evaluate s special or unique u uses • Clarifie ies P Planning C Commissio ion a as d decis ision- make ker • Optiona nal concur urrent nt s submission w n with s site plan ( (to ex expedite o e overall p proces ess) 26

  27. 5.4: Develop opment P Permits Sig ign R Revie iew ( (5.4C) • Simplif lifies t text a and p process • Dist stinguish shes s – Sign permits (Building Official decision) – Additional sign review for certain sign types • Generally Zoning Administrator • Sometimes Planning Commission (off-premises advertising, historic areas) 27

  28. 5.4: Develop opment P Permits Construction P n Plans ( (5.4F) • Propos osed n new p process f for r reviewing engin ineerin ing a and o other d detail ailed m material ials • Ensures c complia iance w wit ith s sit ite p plan an • Responds t to concerns a about t too m much d detail require red u upfro ront • Lets a s applicants p s post stpone $ $ comm mmitme ment u until gettin ing z zonin ing/s /sit ite p plan a approval al • Could b be admin inis istered b by ZA, or outsid ide z zonin ing 28

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend