ACRS CRS MEE MEETING TING WITH WITH THE THE U.S. .S. NUCLE - PowerPoint PPT Presentation

ACRS CRS MEE MEETING TING WITH WITH THE THE U.S. .S. NUCLE NUCLEAR AR REGU REGULA LATOR ORY Y COMM COMMISSION ISSION March 5, 2015 Ov Over erview view John W. Stetkar 2 Accomplishments Since our last meeting with the


  1. ACRS CRS MEE MEETING TING WITH WITH THE THE U.S. .S. NUCLE NUCLEAR AR REGU REGULA LATOR ORY Y COMM COMMISSION ISSION March 5, 2015

  2. Ov Over erview view John W. Stetkar 2

  3. Accomplishments • Since our last meeting with the Commission on October 2, 2014, we issued 8 Reports • Topics: – Watts Bar Unit 2 Operating License – Draft Branch Technical Position 8-9 on Open Phase Conditions in Electric Power Systems – Assessment of the Quality of Selected NRC Research Projects – FY 2014 3 3

  4. • Topics (cont.): – Report on the Safety Aspects of the Nuclear Innovation North America, LLC Combined License Application for South Texas Project Nuclear Station, Units 3 and 4 – Report of the Safety Aspects of the License Renewal Application of the Callaway Plant, Unit 1 4 4

  5. • Topics (cont.): – Commission Paper, “Integration of Mitigating Strategies for Beyond- Design-Basis External Events and the Reevaluation of Flooding Hazards” – Standard Review Plan Chapter 19 and Section 17.4 – Draft Generic Letter 20XX-XX, “Treatment of Natural Phenomena Hazards in Fuel Cycle Facilities” 5 5

  6. Ongoing / Future Reviews • New Plants – Design Certification Application for US EPR – Reference COLA for US EPR (Calvert Cliffs) – Subsequent COLAs for AP1000 (Levy) and ESBWR (North Anna) 6 6

  7. Ongoing / Future Reviews • PSEG Early Site Permit • Small Modular Reactors (NuScale) • SHINE Medical Radioisotope Production Facility • License Renewal – Sequoyah – Byron/Braidwood – Seabrook – Davis-Besse – Indian Point 7 7

  8. Ongoing / Future Reviews • Technical Issues for Subsequent License Renewal – Concrete Structures – Reactor Vessel and Internals – Electrical Cables – Others as Identified • Risk-Informed Resolution of GSI-191, “ Ex Experimenta perimental l Stu Studies of dies of Los Loss-of of- Coolant Coolant-Accident Accident-Gener Generated De ted Debris bris Accumula Accumulation and tion and Head Loss wit Head Loss with h Emp Emphas hasis is on the E on the Effects ects of of Calcium Calcium Silicate Insulation” 8 8

  9. Ongoing / Future Reviews • Fukushima Proposed Rulemaking – Mitigation Strategies for Beyond- Design-Basis External Events – Interim Staff Guidance in Support of Order EA-13-109 (Reliable Hardened Vents) Phase 2 – Containment Protection and Release Reduction for BWRs with Mark I and Mark II Containments 9 9

  10. Ongoing / Future Reviews • Grand Gulf MELLLA+ • Nine Mile Point Unit 2 MELLLA+ • Topical Report NEDE- 33766P , “GEH Simplified Stability Solution (GS3)” • Westinghouse Realistic Full Spectrum LOCA Methodology 10 10

  11. Ongoing / Future Reviews • Risk Prioritization Initiative / Cumulative Effects of Regulation • Risk Management Regulatory Framework • Updated Regulatory Analysis Guidance • Level 3 PRA • Human Reliability Analysis Methods 11 11

  12. Review view of of TV TVA A Oper Operating ting License A License Applica pplication tion for or Watts tts Bar Nuc Bar Nuclear lear Plan Plant, t, Unit Unit 2 Harold B. Ray 12

  13. Background • Watt tts s Bar Bar Unit Unit 2 (WBN 2 (WBN 2) i 2) is s th the e se seco cond nd un unit it of of a a du dual al-un unit it plan plant • Par art t 50 50 co cons nstr truc uctio tion n pe permit mit for or bo both th un units its issu issued ed in in 1973 1973 • Watt tts s Bar Bar Unit Unit 1 (WBN 1 (WBN 1) be 1) bega gan n op oper eration tion in in 1996 1996 • Co Cons nstr truc uctio tion n of of W WBN BN 2 w 2 was as su susp spen ende ded d 1985 1985 – 2006 2006 • SRM SRM in 200 in 2007 7 af affi firmed med tha that t th the e li lice cens nsing ing ba basis sis for or WBN WBN 2 w 2 wou ould ld be be th the e sa same me as as WBN WBN 1, 1, co cons nsiste istent nt with pr with prior ior du dual al-un unit it plan plants ts 13

  14. Background (cont.) • TV TVA sub A submitted the op mitted the oper erating license ting license applica pplication f tion for WB or WBN 2 in N 2 in 2009 2009 • ACR CRS S has has held held 10 10 sub subcommittee committee meetings meetings betw between een Mar March 2009 h 2009 and and Januar anuary y 2015 2015 • An inte An interim lette rim letter w r was as issued issued in in No November ember 2013 2013 • The he interim interim letter letter listed spec listed specifi ific c issues issues f for fur or further ther ACR CRS S review view 14

  15. Final letter in Final letter in Febr bruar uary y 201 2015 5 reflected eflected luding : our comp our completed leted review view inc including • Gen Generic eric Letter Letter (GL) (GL) 200 2004- 02, “Potential Im Impact pact of of De Debris bris Bloc Blocka kage ge on on Emer Emergenc gency y Recir ecircula culation tion during during Des Design ign Bas Basis is Acc Accidents idents at t Pr Pres essu suriz rized ed-Water ter Reactors” • GSI GSI-191 191 issues issues, , inc including luding in in-vess essel el ef effects ects, r , res esolv olved ed bas based ed on lo on low w la latent tent de debris bris le levels els 15

  16. Final l Final letter in etter in Febr bruar uary y 2015 2015 reflected eflected our com our completed r pleted review view inc including luding: : (co (cont.) nt.) • Compliance Compliance with Gener with General al Design Design Criter Cri terion ion 5 5 concer concerning shar ning shared ed systems systems • Cyber Cyber secu security rity desig design n and and confir confirma mator tory y testing testing 16

  17. Febr bruar uary y 2015 2015 ACR CRS S letter r letter reflected eflected further fur ther review view of of spe specific issues cific issues (cont (cont.) .): • Calcula Calculation tion of of cor core fuel e fuel temperatur temper ture • Site Site licensing licensing basis basis hy hydr drolog ology • Fir Fire e pr protection r otection rela elated to ted to oper operator tor manual manual actions actions • Oper Operational r tional readiness eadiness pr prepar eparations tions 17

  18. Our conc Our conclusion lusion: Ther here e is is reaso easona nable ble assu assurance ance • tha that t WBN WBN 2 2 can oper can operate te as as the the seco second nd unit unit of of th the e dual dual unit unit Watts tts Bar Bar Nuc Nuclear lear Plant Plant wi withou thout t undu undue e risk risk to to the health the health and saf and safety ety of of the the pub publi lic c The he oper operating ting li licens cense e for WBN or WBN 2 2 • shou should ld be a be appr pproved ed foll ollowi wing ng completion completion of of r remaini emaining ng staf staff inspections and inspections and closur losure e of of remaini emaining ng open open items items 18

  19. • The he revise vised d Watt tts s Ba Bar r site site licen licensing sing ba basis sis reflect eflects s a a de dete terministica ministicall lly y es esta tablishe blished d Pr Prob obable ble Max Maximum imum Flood lood, , co cons nsiste istent nt with cu with curren ent t pr prac actice tice • We e disc discus usse sed d with NR with NRC C st staf aff t the he de develo elopm pmen ent t of of a a Pr Prob obabilistic bilistic Flood looding ing Hazar Hazard d Ana Analys ysis is metho met hodo dolog logy y for or f fut utur ure us e use • Sta Staff has has a 5 a 5-yea ear r res esea earch h plan plan; ; we su e supp ppor ort t th this is ef effor ort an t and d welco elcome me en enga gage gemen ment t with th with the e st staf aff 19

  20. Assessment of the Quality of NRC Research Projects Michael L. Corradini

  21. Bac Backgro kground und • Throughout its history, an essential activity of the ACRS has been reviewing the research sponsored by the NRC. Currently, such review includes: – Review of research conducted in support of specific regulatory activities – Episodic review of particularly important ongoing research – Biennial review of the overall reactor safety research program – Research Quality Reviews 21

  22. Motivation Motiv ation for Quality for Quality Rev Review iew • Independent evaluation of the quality and utility of research programs • GPRA requirement • ACRS agreed to undertake this task in partial fulfillment of the Commission direction for ACRS to assume role previously performed by NSRRC 22

  23. Quality Review P Quality Review Process rocess • Review criteria originally developed by ACRS & RES • ACRS typically selects two or three Projects from a list proposed by RES • A panel of three ACRS members assigned to each project to do an in- depth review 23

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.