Abington Memorial Hospital Abington Memorial Hospital Abington, Pennsylvania Abington, Pennsylvania Brian Nussbaum Brian Nussbaum Construction Management Construction Management Spring 2004 Senior Thesis Presentation Spring 2004 Senior Thesis


slide-1
SLIDE 1

Abington Memorial Hospital Abington Memorial Hospital

Abington, Pennsylvania Abington, Pennsylvania

Brian Nussbaum Brian Nussbaum

Construction Management Construction Management Spring 2004 Senior Thesis Presentation Spring 2004 Senior Thesis Presentation

slide-2
SLIDE 2

Abington Memorial Hospital

Abington, Pennsylvania

Outline Outline

  • Project Information

Project Information

  • Steel Connection Redesign

Steel Connection Redesign

  • Mold in Exterior Insulation Finish Systems

Mold in Exterior Insulation Finish Systems

  • Green Healthcare Facilities

Green Healthcare Facilities

  • Conclusion, Questions

Conclusion, Questions

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-3
SLIDE 3

Abington Memorial Hospital

Abington, Pennsylvania

  • Building Size: 360,000 SF

Building Size: 360,000 SF

  • Construction Cost: $98.4 million

Construction Cost: $98.4 million

  • $94.6 million New Construction

$94.6 million New Construction

  • $3.8 million Renovations

$3.8 million Renovations

  • Joint Venture between Intech Construction and

Joint Venture between Intech Construction and L.F. Driscoll Construction L.F. Driscoll Construction

Building Information Building Information

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-4
SLIDE 4

PARKING GARAGE

HOSPITAL PARKING UPPER LEVELS CONTRACTOR PARKING LOWEST LEVEL

HOSPITAL ADDITION

TOWER CRANE HOIST HIGHLAND AVENUE PARKING

N

OLD YORK RD (RT. 611) KEITH ROAD

ABINGTON MEMORIAL HOSPITAL SITE PLAN

E X I S T I N G H O S P I T A L WOODLAND ROAD

slide-5
SLIDE 5

Abington Memorial Hospital

Abington, Pennsylvania

Steel Connection Redesign Steel Connection Redesign

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-6
SLIDE 6

Abington Memorial Hospital

Abington, Pennsylvania

Current Steel Erection: Current Steel Erection:

  • 2200 tons of Steel

2200 tons of Steel

  • Divided into 28

Divided into 28 Derricks Derricks

  • 83 days Duration

83 days Duration

Steel Connection Redesign Steel Connection Redesign

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-7
SLIDE 7

Existing Existing Proposed Proposed

slide-8
SLIDE 8

Abington Memorial Hospital

Abington, Pennsylvania

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-9
SLIDE 9

Abington Memorial Hospital

Abington, Pennsylvania

Key Changes in Design: Key Changes in Design:

  • Elimination of Double Channels

Elimination of Double Channels

  • Replaced by series of angles

Replaced by series of angles

  • Prefabrication:

Prefabrication:

  • Connection between W

Connection between W‐ ‐shape and Tube Steel shape and Tube Steel

  • Includes 5/16” plate, two angles

Includes 5/16” plate, two angles

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-10
SLIDE 10

Cost: Cost:

Labor Labor $ 5,130 $ 5,130 $ 1,710 $ 1,710 Material Material $ 8,558 $ 8,558 $ 7,591 $ 7,591 Delivery Delivery $ 389 $ 389 $ 1,035 $ 1,035 Prefabrication Prefabrication $ 0 $ 0 $ 3,174 $ 3,174 $14,077 $14,077 $13,511 $13,511

Abington Memorial Hospital

Abington, Pennsylvania

Erection Erection

1.9 Hours per connection 1.9 Hours per connection 0.72 Hours per connection 0.72 Hours per connection

Time: Time:

9 9 Days on overall schedule

Days on overall schedule

3 3 Days on overall schedule

Days on overall schedule

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

Existing Existing Proposed Proposed

$ 566 $ 566 6 days 6 days

slide-11
SLIDE 11

Abington Memorial Hospital

Abington, Pennsylvania

Exterior Insulation Finish System (EIFS): Exterior Insulation Finish System (EIFS): Resistance to Mold Resistance to Mold

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-12
SLIDE 12

Abington Memorial Hospital

Abington, Pennsylvania

  • Insulation Board,

Insulation Board, Reinforcing Mesh, Reinforcing Mesh, Base Coat & Base Coat & Finish Coat Finish Coat

  • $ 1.7 million EIFS Contract

$ 1.7 million EIFS Contract

  • Used EIFS system to match

Used EIFS system to match existing hospital structure existing hospital structure

Exterior Insulation Finish System (EIFS) Exterior Insulation Finish System (EIFS)

Adhesive Adhesive Substrate Substrate Reinforcing Reinforcing Mesh Mesh Insulation Insulation Board Board Finish Coat Finish Coat

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-13
SLIDE 13

Abington Memorial Hospital

Abington, Pennsylvania

Exterior Insulation Finish System (EIFS) Exterior Insulation Finish System (EIFS)

  • Advantages:

Advantages:

  • Cheap & efficient

Cheap & efficient

  • Lightweight

Lightweight

  • Low maintenance

Low maintenance

  • Ideal for renovations

Ideal for renovations

  • No drainage system

No drainage system

  • Easily damaged

Easily damaged

  • Sealant failures

Sealant failures

  • Disadvantages

Disadvantages:

:

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-14
SLIDE 14

Abington Memorial Hospital

Abington, Pennsylvania

Mold Mold

  • Type of fungus which can be found where there is water or

moisture

  • Health problems associated with mold:
  • Respiratory Disease
  • Coughing
  • Sneezing
  • Skin Rashes

MOLD AND HOSPITALS DON’T MIX! MOLD AND HOSPITALS DON’T MIX!

Brian Nussbaum Spring 2004 Senior Thesis Construction Management Pennsylvania State University

slide-15
SLIDE 15

Abington Memorial Hospital

Abington, Pennsylvania

Moisture intrusion can occur in several ways: Moisture intrusion can occur in several ways:

  • Improper sealing around windows, doors, roof

Improper sealing around windows, doors, roof

  • Moldings, railings, vents

Moldings, railings, vents

  • Cracked or damaged surface

Cracked or damaged surface Lack of Drainage promotes moisture problems and mold growth Lack of Drainage promotes moisture problems and mold growth

Mold in Exterior Insulation Finish System (EIFS) Mold in Exterior Insulation Finish System (EIFS)

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-16
SLIDE 16

Abington Memorial Hospital

Abington, Pennsylvania

EIFS Do’s EIFS Do’s

  • Document Review

Document Review

  • Inspections

Inspections

  • Training

Training

  • Protect EIFS from weather prior to installation

Protect EIFS from weather prior to installation

EIFS Don’ts EIFS Don’ts

  • Leave any joint unsealed (windows, doors)

Leave any joint unsealed (windows, doors)

  • Install without manufacturer approval

Install without manufacturer approval

Mold in Exterior Insulation Finish System (EIFS) Mold in Exterior Insulation Finish System (EIFS)

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-17
SLIDE 17

Abington Memorial Hospital

Abington, Pennsylvania

Abington Memorial Hospital is taking an active stance on Abington Memorial Hospital is taking an active stance on moisture protection moisture protection

EIFS manufacturer offers services to prevent improper installati EIFS manufacturer offers services to prevent improper installation

  • n
  • Plan Reviews

Plan Reviews

  • Quality Management Program

Quality Management Program

  • Pre

Pre‐ ‐construction Meeting construction Meeting

  • Third

Third‐ ‐party inspection party inspection

Mold in Exterior Insulation Finish System (EIFS) Mold in Exterior Insulation Finish System (EIFS)

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-18
SLIDE 18

Abington Memorial Hospital

Abington, Pennsylvania

Green Healthcare Facilities Green Healthcare Facilities

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-19
SLIDE 19

Abington Memorial Hospital

Abington, Pennsylvania

Average between 70 to 75 million square feet of construction eac Average between 70 to 75 million square feet of construction each year h year Over $20 billion in construction costs Over $20 billion in construction costs Hospital services: Hospital services:

Healthcare Facilities Healthcare Facilities

Inpatient Inpatient Outpatient Outpatient Service (food, supply) Service (food, supply) Administrative Administrative Diagnostic and treatment Diagnostic and treatment Research and teaching Research and teaching

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-20
SLIDE 20

Abington Memorial Hospital

Abington, Pennsylvania

Healthcare facilities are highly intensive and demanding in Healthcare facilities are highly intensive and demanding in terms of resources… terms of resources…

… … operational 24 hours/ day

  • perational 24 hours/ day

… … employs over 6.2 million people, 6% of the workforce employs over 6.2 million people, 6% of the workforce … … occupies far more square feet per building than any other build

  • ccupies far more square feet per building than any other building type

ing type … … creates over 5 million tons of solid waste annually creates over 5 million tons of solid waste annually

HEALTHCARE FACILITIES ARE HIGHLY SUITABLE FOR HEALTHCARE FACILITIES ARE HIGHLY SUITABLE FOR SUSTAINABLE DESIGN SUSTAINABLE DESIGN

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-21
SLIDE 21

Abington Memorial Hospital

Abington, Pennsylvania

Minimal effect on the environment: Minimal effect on the environment:

  • Construction materials

Construction materials

  • Construction methods

Construction methods

  • Energy use

Energy use

  • Operating and Maintenance methods

Operating and Maintenance methods U.S. Green Building Council has established the LEED U.S. Green Building Council has established the LEEDtm

tm

rating system for sustainable construction rating system for sustainable construction

Green Building Design Green Building Design

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-22
SLIDE 22

Abington Memorial Hospital

Abington, Pennsylvania

A survey was created for owners, buildings, and designers A survey was created for owners, buildings, and designers with experience in sustainable healthcare construction with experience in sustainable healthcare construction Goals of the survey: Goals of the survey:

  • Why go for sustainable construction?

Why go for sustainable construction?

  • Why aren’t more healthcare facilities sustainable?

Why aren’t more healthcare facilities sustainable?

  • What benefits are you attempting to achieve?

What benefits are you attempting to achieve?

Greening of Healthcare Facilities Survey Greening of Healthcare Facilities Survey

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-23
SLIDE 23

Abington Memorial Hospital

Abington, Pennsylvania

There are many ways a building can benefit from sustainable There are many ways a building can benefit from sustainable construction: construction:

  • Reduced operating costs

Reduced operating costs

  • Enhanced public image

Enhanced public image

  • Increased productivity

Increased productivity

  • Corporate responsibility

Corporate responsibility

  • Environmentally friendly

Environmentally friendly

  • Financial incentives

Financial incentives

  • Marketing device

Marketing device

  • Enhanced well

Enhanced well‐ ‐being of occupants being of occupants

  • Increased property value

Increased property value

  • Improve market performance

Improve market performance Increased productivity Increased productivity Enhanced well Enhanced well‐ ‐being of occupants being of occupants

Green Building Design Green Building Design

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-24
SLIDE 24

Abington Memorial Hospital

Abington, Pennsylvania

An improvement in productivity could result in: An improvement in productivity could result in:

  • Treatment of more patients

Treatment of more patients

  • More productive procedures

More productive procedures

  • Higher quality treatment

Higher quality treatment

Students in sunlit classrooms scored Students in sunlit classrooms scored 20 20‐ ‐26% higher scores 26% higher scores and and absent 3 absent 3– –4 days less 4 days less than conventionally lit classrooms than conventionally lit classrooms U.S. Green Building Council suggests a 6 U.S. Green Building Council suggests a 6‐ ‐16% increase in 16% increase in productivity productivity

Increased Physician/Staff Productivity Increased Physician/Staff Productivity

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-25
SLIDE 25

Abington Memorial Hospital

Abington, Pennsylvania

Poor Indoor Air Quality (IAQ) is one of top five environmental Poor Indoor Air Quality (IAQ) is one of top five environmental risks to public health, according to EPA risks to public health, according to EPA One of six requirements for LEED One of six requirements for LEEDtm

tm certification is a healthy IAQ

certification is a healthy IAQ Healthy IAQ can lead to: Healthy IAQ can lead to: Reduced absenteeism Reduced absenteeism Improved recruitment Improved recruitment Increased staff retention Increased staff retention Increased productivity Increased productivity

Enhanced Well Enhanced Well‐ ‐Being of Occupants Being of Occupants

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-26
SLIDE 26

Abington Memorial Hospital

Abington, Pennsylvania

Study of Patients with views Study of Patients with views

  • f brick wall vs. scenic view
  • f brick wall vs. scenic view

Patients with outside view Patients with outside view

  • Shorter length of stay

Shorter length of stay

  • Fewer medical problems

Fewer medical problems

  • Required less pain

Required less pain medication medication

Enhanced Well Enhanced Well‐ ‐Being of Occupants Being of Occupants

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-27
SLIDE 27

Abington Memorial Hospital

Abington, Pennsylvania

LEED LEEDtm

tm rating system is not highly applicable to healthcare facilities

rating system is not highly applicable to healthcare facilities American Society for Healthcare Engineering (ASHE) has developed American Society for Healthcare Engineering (ASHE) has developed a rating system, based on LEED a rating system, based on LEEDtm

tm which focuses on issues specific to

which focuses on issues specific to healthcare facilities healthcare facilities 109 points, as opposed to 109 points, as opposed to LEED LEEDtm

tm’s

’s 69 points 69 points

Green Guidelines for Healthcare Construction (GGHC) Green Guidelines for Healthcare Construction (GGHC)

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-28
SLIDE 28

Abington Memorial Hospital

Abington, Pennsylvania

Credits more applicable to healthcare facilities, such as Credits more applicable to healthcare facilities, such as

  • Environmental Health Mission Statement & Program

Environmental Health Mission Statement & Program

  • Building Orientation

Building Orientation

  • Medical Equipment Efficiency

Medical Equipment Efficiency

  • Toxin Elimination

Toxin Elimination

Green Guidelines for Healthcare Construction (GGHC) Green Guidelines for Healthcare Construction (GGHC)

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-29
SLIDE 29

Abington Memorial Hospital

Abington, Pennsylvania

Self Self‐ ‐Certifying Certifying Topics designed to: Topics designed to:

  • Support the healing environment

Support the healing environment

  • Reduce energy demand

Reduce energy demand

  • Minimize waste

Minimize waste

  • Protect IAQ

Protect IAQ

  • Maximize daylight

Maximize daylight

Green Guidelines for Healthcare Construction (GGHC) Green Guidelines for Healthcare Construction (GGHC)

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-30
SLIDE 30

Abington Memorial Hospital

Abington, Pennsylvania

Conclusions Conclusions

Steel Connection Redesign Steel Connection Redesign

  • Prefabrication requires less erection time

Prefabrication requires less erection time

  • Savings of 6 days on schedule

Savings of 6 days on schedule

EIFS Resistance to Mold EIFS Resistance to Mold

  • Ensure proper installation to prevent moisture and mold growth

Ensure proper installation to prevent moisture and mold growth

Green Healthcare Facilities Green Healthcare Facilities

  • Sustainability proposes many benefits to healthcare facilities

Sustainability proposes many benefits to healthcare facilities

  • Improved productivity and enhanced well

Improved productivity and enhanced well‐ ‐being of occupants being of occupants

Brian Nussbaum Brian Nussbaum Spring 2004 Senior Thesis Spring 2004 Senior Thesis Construction Management Construction Management Pennsylvania State University Pennsylvania State University

slide-31
SLIDE 31

Abington Memorial Hospital

Abington, Pennsylvania

Questions? Questions?