a leading
play

A Leading Copper Resource Company: From Under the Radar July 2013 - PowerPoint PPT Presentation

Aeon Metals Limited ASX: AQR A Leading Copper Resource Company: From Under the Radar July 2013 1 DISCLAIMER Presentation July 2013 DISCLAIMER: This document has been prepared by Aeon Metals Limited ("Aeon") for the purpose of


  1. Aeon Metals Limited ASX: AQR A Leading Copper Resource Company: From Under the Radar July 2013 1

  2. DISCLAIMER Presentation July 2013 DISCLAIMER: This document has been prepared by Aeon Metals Limited ("Aeon") for the purpose of providing a comprehensive company and technical overview to interested analysts and investors. Any statements, opinions, projections, forecasts or other material contained in this document do not constitute any commitments, representations or warranties by Aeon or its Directors, agents and employees. Except as required by law, Aeon shall in no way be liable to any person or body for any loss, claim, or in connection with the information contained in this document. This document includes certain statements, opinions, projections, forecasts and other material which reflect various assumptions. The assumptions may or may not prove to be correct. Recipients of this document must make their own independent investigations, consideration and evaluation. By accepting this document, the recipient agrees that if it proceeds further with its investigations, consideration or evaluation of investing in the Company, it shall make and rely solely upon its own investigations and enquiries, and will not in any way rely upon this document. Aeon recommends that all potential investors consult their professional advisor/s as an investment in the Company is considered to be speculative in nature. 2 www.aeonmetals.com.au

  3. CORPORATE OVERVIEW (as at 16 July, 2013) Presentation July 2013 Capital Structure Share Price Graph • Aeon Metals Limited (ASX:AQR) • 174,049,709 shares on issue • 14.3m options • Cash - ~$1m • Share Price - ~$0.20 • Market Capitalisation (undiluted) – ~$35m Board of Directors Shareholders • Goody Investments (Director) 18.7% • Thomas Mann Chairman • Washington H Soul Pattinson 10.2% • Hamish Collins Managing Director • SLW Minerals Corp Pty Ltd 9.2% • John Goody Executive Director • SLG Australia Pty Ltd 6.4% • Ed Newman Director Top 20 shareholders control 68% of company . 3 www.aeonmetals.com.au

  4. ASSET LOCATION Presentation July 2013 • Copper Province within large, contiguous tenement holding . • Actively advancing copper asset base to feasibility status: • Greater Whitewash • Ben Hur (a combined John Hill/Kiwi Carpet) • 7B • Rio Tinto JV • Proximity to all necessary infrastructure. • 150km by road Gladstone. • Best in class location . 4 www.aeonmetals.com.au

  5. PROJECTS OVERVIEW – REAL ASSETS Presentation July 2013 1. Greater Whitewash & Ben Hur: • Large Nth-Sth striking copper porphyry style mineralisation. • Objective to delineate over 500mt, long mine life copper resources – open pittable. • Greater Whitewash - 242mt resource • Ben Hur – undertaking JORC resource assessment. 7B Copper Project – New Discovery: 2. • Greenfields copper-gold discovery. • 2,524m RC drilling now complete: • Geological model indicate mineralisation consistent with a volcanic hosted massive sulphide environment. 3. Rio Tinto earn-in and JV agreement (EPM17060) has vindicated regional geological model . 5 www.aeonmetals.com.au

  6. BEN HUR COPPER PROJECT Presentation July 2013 • Major new discovery of a large copper porphyry orebody . • Nominee for 2012 Queensland Explorer of the Year Award based on the discovery. Modelled Plan view (at 350 mRL) • Total metres of drilling since commencing in early 2012 of approximately 5,510m . www.aeonmetals.com.au 6

  7. BEN HUR COPPER PROJECT Presentation July 2013 • Porphyry style mineralisation is peripheral to a large quartz feldspar stock that generally runs around 500ppm copper. • Porphyritic monzonite intrusion hosting a stockwork of fractures - Chalcopyrite mineralisation is along fractures and disseminated. Section view (at 7267000N) through the Ben Hur Co-Mo Porphyry deposit www.aeonmetals.com.au 7

  8. BEN HUR COPPER PROJECT Presentation July 2013 www.aeonmetals.com.au 8

  9. BEN HUR COPPER PROJECT Presentation July 2013 • Significant intercepts - 2012 : • Significant intercepts - 2013 : Cu Equiv 1 Intersect Intersect Cu Equiv 1 Hole No. Cu Mo Ag From To Hole No. Cu Mo Ag From To m m % ppm ppm m m % % ppm ppm m m % 25 141 47 0.31 315 1.6 25 73 54 0.22 69 0.9 45 186 128 51 0.21 71 0.9 26 154 incl 41 0.32 111 1.2 46 87 0.38 Inc 13 0.27 161 0.9 102 115 0.44 incl 6 0.78 81 1.05 46 52 0.83 22 0.17 250 2.1 330 352 0.30 incl 4 0.99 82 1.05 47 51 1.04 Inc 5 0.18 580 6.2 346 351 0.50 130 60 0.25 63 1.1 53 183 0.29 41 53 0.31 18 0.1 14 55 inc 63 0.28 77 1.2 54 117 0.32 Inc 21 0.41 13 0.2 28 49 and 11 0.32 115 1 54 65 0.38 125 0.18 153 0.9 228 353 0.25 202 63 0.25 178 1.2 42 244 Inc 10 0.22 234 1.1 290 300 0.33 inc 166 0.26 203 1.2 78 244 0.36 494 55 0.22 163 1.0 25 519 inc 77 0.38 290 1.8 78 155 0.52 incl 35 0.32 63 0.5 25 60 incl 44 0.49 248 2.2 78 122 0.62 incl 20 0.41 48 0.3 39 59 287 64 0.22 161 1.2 41 328 incl 10 0.49 54 0.3 39 49 inc 111 0.26 212 1.4 177 288 0.37 58 56 0.34 183 1.0 55 113 inc 14 0.26 251 1.3 197 211 0.39 inc 13 0.79 150 1.1 56 69 0.86 and 10 0.31 244 2.1 218 228 0.44 200 58 0.31 100 1.5 46 246 and 7 0.26 260 1.6 273 280 0.39 inc 152 0.32 102 1.5 63 215 inc 51 0.42 124 2.1 87 138 0.50 inc 8 0.55 113 2.2 127 135 0.62 1 Cu Eqiv Formula = (Copper grade + (Mo grade*(Mo price/Cu price) + Ag grade*((Ag Note: Certain intercepts not reported in CuEquiv as top component of hole in oxide zone. A price/0.0625)/Cu price)) composite sample from 12KC051 91to 92m and 12KC055 80 to 85m that assayed 0.4% Cu, Metal Prices used: Copper = A$3.25/lb, Molybdenum = A$14/lb, Silver = A$25/oz 1ppm Ag and 190ppm Mo was submitted to ALS Ammtec Laboratories in Sydney in May 2012 for a demonstration floatation test to determine possible rates of recovery. This test indicated a recovery of 91% for Cu, 65% for Ag and 95% for Mo. www.aeonmetals.com.au 9

  10. BEN HUR COPPER PROJECT Presentation July 2013 • The known mineralisation at Ben Hur (the combined John Hill and Kiwi Carpet) is 6.3km long and 2km wide - LARGE . • 59 holes have been drilled into Kiwi Carpet (1970 ’s), 1km north of John Hill , by Kennecott: • All shallow holes historically targeting copper oxides. • Codelco’s El Teniente lookalike – 15bt @ 0.46% Cu = “super porphyry” • Objective to delineate over a 500mt (inc Whitewash) resource base . Ben Hur Cu Project = Combined John Hill & Kiwi Carpet El Teniente vs 10 www.aeonmetals.com.au

  11. BEN HUR COPPER PROJECT Presentation July 2013 • BEN HUR Next Steps: • JORC Resource - in progress by SRK Consultants • Combined centralised processing plant assessment. • Further drilling along north strike. www.aeonmetals.com.au 11

  12. NEW DISCOVERY: 7B Cu-Au PROJECT Presentation July 2013 • 2 RC Drill campaigns now completed • 31 holes for 2,524m . • IP survey also recently completed. • 2 areas 500m apart – Wild Chilli and Meat Ant; • Copper lode now defined at Wild Chilli. 12 www.aeonmetals.com.au

  13. 7B Cu-Au PROJECT Presentation July 2013 • Horizontal shallow lodes show continuity. • Examples of lode:  26m @ 0.78% Cu, 0.1g/t Au and 11g/t Au from 6m.  20m @ 0.93% Cu, 0.1g/t Au and 14g/t Ag from 8m.  10m @ 0.87% Cu, 0.6g/t Au and 3g/t Ag from 12m. www.aeonmetals.com.au 13

  14. 7B Cu-Au PROJECT Presentation July 2013 • Horizontal shallow lodes show continuity. • Examples of lode:  13m @ 1.00% CuEquiv 1 from 55.  9m @ 1.67% CuEquiv 1 from 30.  9m @ 0.90% CuEquiv 1 from 72. www.aeonmetals.com.au 14

  15. 7B Cu-Au PROJECT Presentation July 2013 100m 100m www.aeonmetals.com.au 15

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend