SLIDE 1
A crane lowers a girder into place at constant speed. Consider the work WG done by gravity and the work WT done by the tension in the cable. Which is true?
A. WG > 0 and WT > 0 B. WG > 0 and WT < 0 C. WG < 0 and WT > 0 D. WG < 0 and WT < 0 E. WG = 0 and WT = 0
Slide 9-1