835 acres 76% impervious Combined and separately sewered areas - - PowerPoint PPT Presentation
835 acres 76% impervious Combined and separately sewered areas - - PowerPoint PPT Presentation
835 acres 76% impervious Combined and separately sewered areas Two outfalls Downtown Stormwater Modeling Project, March 2017, CDM Smith Downtown Stormwater Modeling Project, March 2017, CDM Smith Route 34 and Union Ave 8.8-8.9 feet
835 acres 76% impervious Combined and separately sewered areas Two outfalls
Downtown Stormwater Modeling Project, March 2017, CDM Smith
Downtown Stormwater Modeling Project, March 2017, CDM Smith
Higher High Tide about 4.4 feet (NAVD88) Brewery St Ext 5.45 feet (NAVD88) Route 34 and Union Ave 8.8-8.9 feet (NAVD88)
Downtown Stormwater Modeling Project, March 2017, CDM Smith
Downtown Stormwater Modeling Project, March 2017, CDM Smith
- 5-year, 1 hour storm (1.5 inches)
Date Duration (hrs) Max 5 min volume (in) Max 30 min volume (in) Total volume (in) 4/6/2017 2.25 0.12 0.48 0.64
2010 – Cardinal 2014 – PB 2016 – CDM Smith
2010: Large Infrastructure Solution ($54-59 M 2012 dollars including pump station)
2014: Diversion to West River ($25 M 2013 dollars)
2016: Pump Station to Harbor ($37 M 2019 dollars- Phase 1)
Downtown Stormwater Modeling Project, March 2017, CDM Smith
Downtown Stormwater Modeling Project, March 2017, CDM Smith
Preliminary results of research by Gaboury Benoit, Yale F&ES