3/10/2010 1
2009 ODU / CREED INDUSTRIAL REVIEW
Presented by: William C. Throne, CCIM, SIOR, ALC
2009 ODU / CREED INDUSTRIAL REVIEW
3 NUMBERS
2009 ODU / CREED INDUSTRIAL REVIEW 12 94 12 94
First Number:
12.94 12.94 2009 ODU / CREED INDUSTRIAL REVIEW
Hampton Roads Industrial Vacancy Rate
First Number:
12.94% 12.94% 2009 ODU / CREED INDUSTRIAL REVIEW
Hampton Roads Industrial Vacancy Rate
First Number:
87.06% occupied!
12.94% 12.94% 2009 ODU / CREED INDUSTRIAL REVIEW
Hampton Roads Industrial Vacancy Rate
First Number: