260 SOUTH STREET 1 260 SOUTH STREET NY, NY 260 SOUTH STREET NY, NY CB3 LAND USE COMMITTEE MEETING 2.15.17 CB3 LAND USE COMMITTEE MEETING 2.15.17 TWO BRIDGES ASSOCIATES, L.P. TWO BRIDGES ASSOCIATES, L.P. OWNERSHIP INTRODUCTION TWO BRIDGES


slide-1
SLIDE 1

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 1

260 SOUTH STREET

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17

slide-2
SLIDE 2

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 2

TWO BRIDGES ASSOCIATES, L.P.

  • JOINT VENTURE: CIM GROUP & L+M DEVELOPMENT
  • NOVEMBER 2013:

ACQUIRED 265 AND 275 CHERRY STREET IMMEDIATELY ENGAGING WITH RESIDENTS TO ADDRESS ONGOING CONCERNS

  • MAY 2014:

ACQUIRED THE PARKING LOT AND ASSOCIATED DEVELOPMENT RIGHTS

  • JUNE 2014:

WORKED WITH CITY TO PRESERVE AFFORDABILITY AT 265 AND 275 CHERRY STREET FOR 40 YEARS

  • FEBRUARY 2015:

C&C MANAGEMENT BEGAN MANAGEMENT OF 265 AND 275 CHERRY STREET

OWNERSHIP INTRODUCTION

slide-3
SLIDE 3

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 3

  • PRESERVE LONG-TERM AFFORDABILITY AT LANDS END II COMPLEX AND BUILD

NEW MIXED-INCOME HOUSING

  • PROTECT EXISTING BUILDINGS ON SITE FROM FLOODING BY IMPLEMENTING

RESILIENCY STRATEGY

  • INCREASE GREEN AREAS AND REDUCE IMPERMEABLE PAVING
  • PROVIDE PASSIVE AND ACTIVE RECREATIONAL SPACES
  • IMPROVE AND EXPAND RETAIL PRESENCE ALONG CHERRY STREET
  • PROVIDE SECURE COVERED PARKING
  • UPGRADE COMMUNITY ROOM
  • MAINTAIN SIGHT LINES FROM CHERRY STREET AND COURTYARD TO WATER
  • MITIGATE DISRUPTION DURING CONSTRUCTION THROUGH COMMUNICATION

WITH RESIDENTS

  • SET BEST EFFORTS LOCAL HIRING GOAL DURING CONSTRUCTION

PROJECT GOALS: ENTIRE BLOCK

SOUTH ST. FDR

BUILDING LINE SOFT EDGE

+13.00’

PEDESTRIAN ACCESS RUTGERS SLIP JEFFERSON STREET

slide-4
SLIDE 4

CHERRY STREET SOUTH STREET RUTGERS SLIP RUTGERS PARK JEFFERSON STREET COURTYARD 260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 4

EXISTING SITE CONDITIONS AND USES

RETAIL (1760 SF) FENCED-IN PLAY AREA (SCHOOL AGE) FENCED-IN SERVICE ALLEY COMMUNITY ROOM PLAY AREA (PRE-SCHOOL) GAME TABLES SITTING AREA PARKING LOT PROPERTY FENCED-IN BASKETBALL COURT

BASE FLOOD ELEVATION = 12’-0” BASE FLOOD ELEVATION = 11’-0”

LEGEND ASPHALT/PAVED GREEN

TOTAL SITE EXISTING GREEN/PERMEABLE AREA

  • 19% GREEN/EARTH

BASE FLOOD ELEVATION = HIGHEST EXPECTED ELEVATION OF WATER DURING THE 1% ANNUAL CHANCE FLOOD (100-YEAR FLOOD)

slide-5
SLIDE 5

CHERRY STREET SOUTH STREET RUTGERS SLIP RUTGERS PARK JEFFERSON STREET COURTYARD

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 5

1 4 5 3 2

EXISTING OUTDOOR SPACES

KEY PLAN VIEW 1 VIEW 4 VIEW 2 VIEW 5 VIEW 3

slide-6
SLIDE 6

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 6

CHERRY STREET RUTGERS PARK EXISTING DELI KEY PLAN 1 4 2 3 5

EXISTING RETAIL

VIEW 1 VIEW 4 VIEW 2 VIEW 5 VIEW 3

slide-7
SLIDE 7

SOUTH STREET JEFFERSON STREET COURTYARD

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 7

EXISTING PARKING

1 2 3 4 5 KEY PLAN EXISTING PARKING LOT VIEW 1 VIEW 4 VIEW 2 VIEW 5 VIEW 3

slide-8
SLIDE 8

KEY PLAN

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 8

1 3 5 4 2 EXISTING COMMUNITY ROOM STORAGE WC KITCHEN WC

EXISTING COMMUNITY ROOM

VIEW 1 VIEW 4 VIEW 2 VIEW 5 VIEW 3

slide-9
SLIDE 9

5 4B 4A 6B 6A 7

FLOOR AREA SUMMARY: ZONING FLOOR AREA AVAILABLE1

LSRD BOUNDARY ESTABLISHED BY: CP-21885 MAY 17, 1972 ZONING LOT LSRD SITE 5 NYC BLOCK #247 = LSRD SITE NUMBER

10 26 26 3 3 1 2 19 17 27 21

LSRD SITE 5: ZONING LOT AREA = 145,031 SF @ 12 FAR = 1,740,372 ZFA PERMITTED SUBTRACT FLOOR AREA USED = 615,071 ZFA (265-275 Cherry St.) 1,125,301 ZFA AVAILABLE

#

FOOTNOTE:

  • 1. AS PERMITTED BY EXISTING C6-4 ZONING WITH INCLUSIONARY HOUSING BONUS

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 9

slide-10
SLIDE 10

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 10

PROPOSED DESIGN

75 FEET BETWEEN VOLUMES AT UPPER PORTION 60 FOOT MINIMUM DISTANCE BETWEEN VOLUMES RETAINS VIEWS AND ALLOWS FOR LIGHT PENETRATION INTO COURTYARD GLASS AT GROUND FLOOR MAINTAINS VISUAL CONNECTION TO RIVER FROM COURTYARD

COURTYARD VIEW LOOKING SOUTH

+798’

69 floors 62 floors

+728’

slide-11
SLIDE 11

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 11

PROJECT MASSING

+/- 50 FLOORS +/- 600’

VIEW FROM SOUTHWEST VIEW FROM NORTHEAST

REMOVE MASS TO PROVIDE LIGHT PENETRATION TO COURTYARD REDISTRIBUTE AREA BETWEEN TWO VOLUMES TO AVOID SINGLE SOLID BUILDING PROVIDE VIEW CORRIDOR TO EAST RIVER THROUGH GLASS LOBBY

PROPOSED MASSING REJECTED MASSING

slide-12
SLIDE 12

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 12

LANDSCAPED AREA AT SOUTH STREET EXPANDED, LANDSCAPED PUBLIC WALKWAY KIDS PLAY AREA GARDEN* LANDSCAPED AREA WITH SEATING SENIOR SITTING AND RECREATIONAL AREA* *BASED ON AMENITIES REQUESTED IN RESIDENT SURVEY KIDS PLAY AREA SENIOR SITTING AREA

PROPOSED SITE LANDSCAPING AND PROGRAMMING

IMPROVEMENTS TO JEFFERSON STREET SLOPED MULTIPURPOSE LAWN* TOTAL SITE PROPOSED GREEN/PERMEABLE AREA

  • 33% GREEN/EARTH

ROOF LINE, TYP.

slide-13
SLIDE 13

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 13

PROPOSED SITE RESILIENCY DESIGN ELEMENTS

BERMS BERMS FLOOD WALLS FLOOD WALLS DEPLOYABLE FLOOD GATES AND BARRIERS GRADE CHANGE

slide-14
SLIDE 14

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 14

PROPOSED RUTGERS PARK LANDSCAPE AND PROGRAMMING

GARDEN

RUTGERS SLIP CHERRY STREET

PLAY AREA FOR SCHOOL AGE KIDS SEATING AND RECREATIONAL AREA FOR SENIORS

PLAYGROUND : WEST THAMES PARK PLAYGROUND : NEWPORT GREEN DOROTHY STRELSIN GARDEN DOROTHY STRELSIN GARDEN SEATING : COLUMBUS PARK CHESS TABLES : WASHINGTON SQUARE

slide-15
SLIDE 15

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 15

PROPOSED RUTGERS PARK RENDERING

VIEW FROM CHERRY STREET

slide-16
SLIDE 16

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 16

PROPOSED COURTYARD LANDSCAPE AND PROGRAMMING

PLAY AREA FOR TODDLERS SEATING AND RECREATIONAL AREA FOR SENIORS MULTIPURPOSE LAWN

CHILDRENS PLAY EQUIPMENT FAMILY SPORTS: SOUTH END AVE ROLLING PLAY LAWN: WASHINGTON SQUARE PARK TAI CHI : LOWER EAST SIDE EVENTS FOR CHILDREN

CHERRY STREET

CHESS TABLES : WASHINGTON SQUARE

slide-17
SLIDE 17

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 17

INITIAL OPEN SPACE WORKSHOP

slide-18
SLIDE 18

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 18

LANDSCAPED ENTRYWAY EXPANDED WEST RETAIL, 3830 SQ.FT. NEW EAST RETAIL, 3370 SQ.FT.

PROPOSED CHERRY STREET RETAIL AND PARKING

VEHICULAR ENTRY FROM SOUTH STREET VEHICULAR EXIT TO SOUTH STREET RESIDENT ELEVATOR TO NEW PARKING GARAGE GARAGE ENTRY AND EXIT RAMP PROPOSED LOCATION OF NEW COMMUNITY ROOM

slide-19
SLIDE 19

RUTGERS SLIP

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 19

PROPOSED COMMUNITY ROOM

COMMUNITY ROOM WOMEN’S WC MEN’S WC KITCHEN STORAGE

COMMUNITY ROOM DESIGN EXAMPLES COMMUNITY ROOM SAMPLE LAYOUT

slide-20
SLIDE 20

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 20

PROPOSED CHERRY STREET RETAIL RENDERING

VIEW FROM CHERRY STREET

slide-21
SLIDE 21

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 21

AFFORDABILITY SUMMARY

  • 490 EXISTING APARTMENTS AT 265 AND 275 CHERRY STREET

TO REMAIN AFFORDABLE FOR 40 YEARS PER THE 2014 REGULATORY AGREEMENT

  • UP TO 1,350 NEW APARTMENTS TO BE BUILT1
  • COMMITMENT THAT 25% OR UP TO 338 OF THE NEW

APARTMENTS WILL BE AFFORDABLE2

  • UPON COMPLETION OF CONSTRUCTION, APPROXIMATELY

45% OF THE APARTMENTS ON THE BLOCK WILL BE AFFORDABLE

FOOTNOTES:

  • 1. TOTAL NUMBER OF APARTMENTS MAY VARY AS DESIGN DEVELOPS
  • 2. PERCENTAGE OF AFFORDABLE UNITS ASSUMES 421A PROGRAM OR

EQUIVALENT

NEW DEVELOPMENT ENTIRE BLOCK AFFORDABLE

25% 45%

AFFORDABLE MARKET RATE MARKET RATE

slide-22
SLIDE 22

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 22

EFFORTS DURING CONSTRUCTION

  • REGULAR UPDATES TO RESIDENTS AND COMMUNITY ABOUT CONSTRUCTION

STATUS AND PROGRESS

  • BEST EFFORTS LOCAL HIRING GOAL
  • ASSISTANCE WITH CREDIT COUNSELING AND AFFORDABLE HOUSING LOTTERY

APPLICATIONS

slide-23
SLIDE 23

260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P. CB3 LAND USE COMMITTEE MEETING 2.15.17 23 260 SOUTH STREET NY, NY TWO BRIDGES ASSOCIATES, L.P.

THANK YOU