2019 2021 2022 2030 2031 2040 2041 2050
play

2019-2021 2022-2030 2031-2040 2041-2050 Current CIP Replace - PowerPoint PPT Presentation

2019-2021 2022-2030 2031-2040 2041-2050 Current CIP Replace schools / Manage any Group A Group C system failures in the interim MM Spend Plan Based on FCA - Renovate Refurbish Schools Group B develop 20-year 10-year life expectancy


  1. 2019-2021 2022-2030 2031-2040 2041-2050 Current CIP Replace schools / Manage any Group A Group C system failures in the interim MM Spend Plan Based on FCA - Renovate Refurbish Schools Group B develop 20-year 10-year life expectancy repairs / replacement and minimal major maintenance Group C major investment maintenance New FCA strategy 20 to 25-year system life Group D Group D expectancy repairs and major (+new schools) (+new schools) maintenance replacement cycles 2

  2. 3

  3. FY 2019 - 2023 4

  4. ● $900K additional funding from County in FY2019 ○ $600K for HVAC PM of all equipment EXCEPT chillers and cooling towers using County scope of work and contract as basis ○ $300K for BAS system PM and reprogramming ● Using 4 open HVAC mechanic positions, create 2 PM teams for chillers and cooling towers ○ Upgrade 2 positions for higher grade HVAC tech ○ Downgrade 2 positions to HVAC apprentice ○ Use apprentice positions to support succession planning program ● Current plan is to begin HVAC preventive maintenance by spring of 2019 5

  5. ● ● ● ● 6

  6. 7

  7. 8

  8. ● ● ● ● ● ● ● ● ● ● ● ● Summary Note: All refurbishment recommendations are based on FCA. FFE full replacement is not recommended unless FFE are beyond economic repair or do not meet safety standards. 9

  9. ● ● ● ● ● ● ● ● Summary Note: All refurbishment recommendations are based on FCA. FFE full replacement is not recommended unless FFE are beyond economic repair or do not meet safety standards. 10

  10. 11

  11. ● ● ● ● ● ● ● ● ● 12

  12. ● ● ● ● ● ● ● ● 13

  13. Annualized Repair Cost Annualized EMG Estimates EMG with design, Esc w/design, permitting, Replacement Replacement Projects Age 20-yr Repair permitting, contingency Cost Esc to 2023 Cost (60-yr Cost Esc (MIN) contingency (20-yr LE) (final capacity) LE) MIN Cost $8.9M $10.7M $535,000 $49.5M (900) $825,000 AM Davis* 54 $10.8M $12.9M $645,000 $45.6M (750) $760,000 Bensley*! 64 $14.8M $17.7M $885,000 $65.1M (1300) $1,085,000 Falling Creek MS 52 $10.3M $12.3M $615,000 $44.1M (1100) $735,000 Matoaca MS Phase 2 56 *Pod at Davis and Bensley 34 and 44 years old respectively. Predates ADA and Energy Code. Building materials indicate 25-30 year useful life. !Bensley may require new site. Land costs not included in costs. 14

  14. 15

  15. ● ○ ● ○ ○ ● ○ ○ 16

  16. 2019-2021 2022-2030 2031-2040 2041-2050 MM Spend Plan Group A Group C Based on Replace schools / Manage any FCA - system failures in the interim $57.3M $95.1-$308.4M $110.7-$205.7M* develop Renovate Refurbish Schools Group B - $106.9M 20-year replacement 10-year life expectancy repairs / and major minimal major maintenance Group C - $39.3M maintenance investment strategy New FCA 20- to 25-year system life Group D Group D expectancy repairs and major $41-$57M/yr** $41-$57M/yr** maintenance replacement cycles * Costs escalated to 2023 only **/yr - greater clarification and not included in original presentation; includes 2013 bond school estimates; high end 17 assumes only major maintenance and no replacement or refurbishments for 2022 bond referendum

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.