2018 Neighborhood Safety Program Energizing Kirklands Neighborhoods City Council April 17, 2018 2018 Neighborhood Safety Recommendations Top Priority Projects Score NSP # Project Name/Location Rough Estimate 136 18NSP01 Bicycle


slide-1
SLIDE 1

2018 Neighborhood Safety Program

Energizing Kirkland’s Neighborhoods

City Council April 17, 2018

slide-2
SLIDE 2

2018 Neighborhood Safety Recommendations

Top Priority Projects Score NSP # Project Name/Location Rough Estimate

136 18NSP01 Bicycle Improvements 98th Ave and 100th Ave NE $35-50K 132 18NSP02 Radar Speed Sign on 132nd Ave NE from NE 128th to NE 144th Street $35-50K 127 18NSP03 Radar Speed Sign on Kirkland Way at CKC $35-50K 119 18NSP04 Trail Connection on the CKC at NE 53rd Street $4-14K 117 18NSP05 Walkway Improvement on 7th Ave from 4th to 6th Streets $35-50K 109 18NSP06 Stair Improvements for CKC connection along NE 100 Street at Cotton Hill Park $35-50K 109 18NSP07 Rapid Flashing Beacon on NE 70th Street at 120th Ave $35-50K+

slide-3
SLIDE 3

Juanita: Green pavement marking/bicycle lanes 100th Ave NE

slide-4
SLIDE 4

Juanita: Green pavement marking/bicycle lanes 98th Ave

  • Compliments existing plans and projects
  • Ped/bike crash history
  • High speeds and volumes
slide-5
SLIDE 5

Evergreen Hill: Radar Speed Sign 132nd Ave NE from NE 128th to NE 144th St

  • Ped/bike crash history
  • School walk route
  • High health equity score
slide-6
SLIDE 6

Everest: Radar Speed Sign Kirkland Way at CKC

  • High speeds and moderate volumes
  • High public benefit by panel
slide-7
SLIDE 7

Central Houghton: Asphalt trail connection CKC at NE 53rd Street

  • Connects to School Walk Route
  • High walkability
  • Improves maintenance – by paving dirt path
slide-8
SLIDE 8

Norkirk: Asphalt walkway (gaps) 7th Ave from 4th to 6th Streets

  • School Walk Route
  • High walkability
  • No crashes – but near misses
slide-9
SLIDE 9

Highlands: Bicycle runnel and hand rail on stairs NE 100 Street at Cotton Hill Park

  • Connections to Parks and CKC
  • Connects to School Walk Route
  • Moderate walkability
slide-10
SLIDE 10

South Rose Hill/Bridle Trails: Rapid Flashing Beacons NE 70th Street at 120th Ave

  • High speeds – moderate volumes
  • School Walk Route
  • High walkability
slide-11
SLIDE 11

2018 Neighborhood Safety Recommendations

Moderate Priority Projects Score NSP # Project Name/Location Rough Estimate

107 18NSP08 Crosswalk at Lakeshore Plaza at Marina Park $35-50K 106 18NSP09 Radar Speed Sign on 131st Way east of 94th Ave NE $35-50K

slide-12
SLIDE 12

Moss Bay: Crosswalk and ADA ramp Lakeshore Plaza at Marina Park

  • High walkability
  • Accessibility (ADA ramp)
  • Link to transit and ped/bike facilities
slide-13
SLIDE 13

Finn Hill: Radar Speed Sign 131st Way east of 94th Ave NE

  • Not a School Walk Route (but connects to SWR)
  • Moderate speeds and volumes
  • Moderate walkability (but connects to high)
slide-14
SLIDE 14

Questions/Comments?

slide-15
SLIDE 15

Street Light Projects

City Council April 17, 2018

slide-16
SLIDE 16

2018 S Str treet Li Light P Projects ts Green = een = High h pr priority Brown = = Moderately h high p priority Bl Blue = ue = LED c conver ersion n (ther

ere m e may b be more) e)

Not mapped: Approximately 70 lower priority locations

slide-17
SLIDE 17

Questions/Comments?