$15.8B 29.1% 51.8% Costs of Manually Claims due to Solutions - - PowerPoint PPT Presentation

15 8b 29 1 51 8
SMART_READER_LITE
LIVE PREVIEW

$15.8B 29.1% 51.8% Costs of Manually Claims due to Solutions - - PowerPoint PPT Presentation

55% $15.8B 29.1% 51.8% Costs of Manually Claims due to Solutions that Interoperability transfer data inaccurate data dont integrate Point Solutions Estimating Software Accounting GC/Owner Project Management Owner Change Orders


slide-1
SLIDE 1
slide-2
SLIDE 2
slide-3
SLIDE 3

$15.8B

Costs of Interoperability

29.1%

Solutions that don’t integrate

55%

Claims due to inaccurate data

51.8%

Manually transfer data

slide-4
SLIDE 4
slide-5
SLIDE 5

GC/Owner Project Management Accounting Point Solutions Estimating Software

slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8

General Contractor

Owner Designer

Electrical Drywall Fire Protection

Plans Daily Reports Time Cards Submittals RFIs Change Orders

Steel Glazing Mechanical

Engineer Architect

slide-9
SLIDE 9

Field Project Manager VDC

Clark Construction Procore

Electrical*

Field Project Manager VDC

Mechanical*

Field Project Manager VDC

Steel*

Plan Management Daily Reports Time Cards Submittals RFIs Change Orders

DPR Aconex

Electrical Mechanical Steel

Turner Construction Kahua

Electrical Steel *Avg. 26 Trades per Project

Subs log into GC System Use Multiple Systems

Mechanical

Siloed Field to Office Subs Don’t Own Their Data

slide-10
SLIDE 10

Contractual Risk Contractual Risk

Owner Hires Architect for Design.

Architect not Liable for Constructability of Design

Owner Hires GC. GC not Liable for Constructability of Design.

Owner passes down Contractual Risk to GC for Timely Completion
  • f Project

Knows nothing about Constructability Knows nothing about Constructability

GC Hires Subs off of Bids based on Designs that are 30% to 50% complete at Bid time.

GC passes down Contractual Risk to Subs for Timely Completion of Project.

Constructability Experts Perform all the Labor

Owner Architect General Contractor Subcontractors

1 2 3

slide-11
SLIDE 11

RISK RISK ACCOUNTABILITY TO FIELD WORKERS FIELD WORKERS MUST DOCUMENT TO UPHOLD ACCOUNTABILITY

Owner General Contractor Subcontractors

slide-12
SLIDE 12

Subcontractor Driven Workflow Coordination - Field and Office Subs Own their Data Archive of the Project Proactively Initiating Docs from Field vs. Reactively Doing Work and Trying to get Paid for it

Field Project Manager Accountant Design

Plan Management Time Cards 2 Way Email Contacts Issues Change Orders RFIs Field Notes Correspondence Audit Log Daily Reports Calendar Project Files Reminders Submittals Purchase Orders Milestones Resource Management

GC1 GC2 GC3

slide-13
SLIDE 13
slide-14
SLIDE 14

Design Collaboration Pre- Construction Construction Handover & Operations

Field Collaboration Project Management

COST (FIELD)
slide-15
SLIDE 15

Design Collaboration Pre- Construction Construction Handover & Operations

Field Collaboration

eSUB Field Works eSUB Time

Project Management

eSUB Project Management eSUB Job Cost Management eSUB Resource Management
slide-16
SLIDE 16
slide-17
SLIDE 17

ACCESS to BIM 360 DOCS from eSUB

slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20

General Contractor

Sent RFI

Email, date and time Stamp, status

Approved RFI Project Manager

Pins copy of RFI to model / plans

Field Workers

Get approval and retrieve details

slide-21
SLIDE 21

Design/Estimate Project Management / Cost Management Accounting Software

Field Productivity

slide-22
SLIDE 22
slide-23
SLIDE 23 23
slide-24
SLIDE 24

Quality Cost Function Time to Market

DFMA

Declining Labor Productivity Cost of Changes Constructability Experts

slide-25
SLIDE 25

POWER

TO THE TRADES

Consultative Conversations Educational Webinars Best Practice Guides

www.eSUB.com

slide-26
SLIDE 26
slide-27
SLIDE 27
slide-28
SLIDE 28
slide-29
SLIDE 29
slide-30
SLIDE 30
slide-31
SLIDE 31

Original Budgets including Change Orders Costs to Date Project Managers Projections on Remaining Costs Projected Costs to Completion

slide-32
SLIDE 32

STREAMLINING SUBMITTAL PROCESS

slide-33
SLIDE 33
slide-34
SLIDE 34
slide-35
SLIDE 35

Punch In and Comment Daily Field Reports

Features

  • Punch In/Out
  • Switch Tasks
  • Break Out/In
  • “Chat-like” commenting with back-office
  • Manual time entry by time in/out or

total hours worked

  • Notifications of key events (ready to

sign, new comment, rejection)

  • In-app Timecard Signing
  • All features available when offline.

Background sync when online.

  • Daily Reports create Time Cards
slide-36
SLIDE 36