10 26 27 2011 nepsr pipeline safety seminar cape codder
play

10/26-27/2011 NEPSR Pipeline Safety Seminar Cape Codder Resort & - PowerPoint PPT Presentation

10/26-27/2011 NEPSR Pipeline Safety Seminar Cape Codder Resort & Spa, Hyannis MA PHMSA (Office of Training & Qualification and Eastern Region) New England Pipeline Safety Representatives (State Programs) New England Pipeline Operators


  1. 10/26-27/2011 NEPSR Pipeline Safety Seminar Cape Codder Resort & Spa, Hyannis MA PHMSA (Office of Training & Qualification and Eastern Region) New England Pipeline Safety Representatives (State Programs) New England Pipeline Operators New England pipeline safety collaborative

  2. The Vermont Department of Public Service 112 State St. Montpelier, VT 05620-2601 Gas Pipeline Safety Program Hans Mertens GC Morris Director Engineer Services & Chief Engineer Gas Engineer 802-828-4007 802-828-4073

  3. Gas Pipeline Facilities

  4. Records required prior to pipeline Operation and Maintenance §192.503 Pressure Test §192.605 Plot Plan §192.605 Bill of Material §192.619 MAOP establishment §192.605 Construction Records

  5. 49CFR192 areas of Design and Construction Subpart B Materials Subpart C Pipe Design Subpart D Component Design Subpart E Welding Subpart F Joining Subpart G Construction Subpart H Meters, Regulators & Services Subpart I Corrosion Control

  6. Vermont Public Service Board Rule 6.157 Maps of Transmission and Distribution System Upon request of the Board or Department of Public Service, the Gas Corporation shall file with the Board and the Department of Public Service a complete set of maps of the requested area showing the location of the pipes and grids, pipe sizes, operating pressures, valves, regulator stations, and other pertinent data showing that the transmission or distribution system has been constructed or reconstructed in accordance with these Rules.

  7. Design and Construction records are critical to determine operation and maintenance actions Knowledge of specific Pipeline System attributes are needed to: Develop and execute safe pipeline O&M procedures

  8. Design and Construction records are critical Example Records of system Materials, Components are needed to: Establish MAOP

  9. Design and Construction records are critical Example Records of system Materials, Components are needed to: Establish adequate Over Pressure Protection

  10. Design and Construction records are critical Example Records of system Materials, Components are needed to: Designate specific Critical Valves

  11. Design and Construction records are critical Example Records of system Materials, Components are needed to: Establish appropriate Leak Survey methods

  12. Design and Construction records are critical Example Records of system Materials, Components are needed to: Establish appropriate Corrosion Control methods

  13. Complete Design Layout and System Mapping Map Integration is required to: Ensure pipeline system testing and maintenance is comprehensive and are performed for all areas (segments, sections, regions) Pressure tests Continuing surveillance Leak Surveys Corrosion Control tests/surveys Critical Valve tests Over Pressure protection assurance

  14. Questions ? End

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.