1 Our Vision: Fastest Train in World 2 Who are We? - - PowerPoint PPT Presentation

1 our vision fastest train in world
SMART_READER_LITE
LIVE PREVIEW

1 Our Vision: Fastest Train in World 2 Who are We? - - PowerPoint PPT Presentation

1 Our Vision: Fastest Train in World 2 Who are We? Baltimore-Washington Rapid Rail (BWRR) is a Maryland-based franchise railroad affiliated with: The Northeast Maglev (TNEM) American company formed to support the deployment of SCMAGLEV in


slide-1
SLIDE 1

1

slide-2
SLIDE 2

2

Our Vision: Fastest Train in World

slide-3
SLIDE 3

Who are We?

Baltimore-Washington Rapid Rail (BWRR) is a Maryland-based franchise railroad affiliated with: The Northeast Maglev (TNEM) ▪ American company formed to support the deployment

  • f SCMAGLEV in the Northeast Corridor

Central Japan Railway Company (JR Central) ▪ Developer of Superconducting Maglev system ▪ Operator of Tokaido Shinkansen “bullet train” since 1964 ▪ Manufacturing team includes Mitsubishi, Sumitomo, Hitachi, Nippon Steel and Kyosan companies

3

slide-4
SLIDE 4

4

Advisory Board

slide-5
SLIDE 5

5

The NEC: Big and Getting Bigger

slide-6
SLIDE 6

6

Broken Infrastructure / Growing Problems

slide-7
SLIDE 7

7

SCMAGLEV History

slide-8
SLIDE 8

8

How SCMAGLEV Works

slide-9
SLIDE 9

9

The Future Has Arrived!

slide-10
SLIDE 10

10

Alignment Alternatives

slide-11
SLIDE 11

SCMAGLEV Technical Requirements

  • Strict geometry is necessary to ensure highest practical

speed can be attained by SCMAGLEV technology

  • Tunnel or viaduct alignments allow for increased safety

and minimizes disruption

  • Shifting direction at top speed must be safely

accomplished over a long and gradual geometry to ensure passenger comfort

1 1

slide-12
SLIDE 12

Typical Cross Sections

Typical Viaduct Section Typical Tunnel Section

1 2

slide-13
SLIDE 13

Baltimore-Washington Project Schedule

13 * Schedule includes securing financing and procurement

Revenue Service Begins Design / Construction Commences

Winter 2019

EIS Completion

Summer 2019

Construction duration depends on alignment selected and construction methodology

slide-14
SLIDE 14

Preparing for the Future

Setting up programs and training for new era technology careers – and more

1 4

slide-15
SLIDE 15

Expected Regional Job Opportunities

Construction and operation of the SCMAGLEV will result in increased demand for jobs in a variety of sectors

15

Construction

Logistics Assembly Planning & Supervision

Engineering

Software Electrical & Mechanical Fire, Life, Safety

Maintenance

Inspection Infrastructure Testing

Operations

Operators On-Board Services Systems Analysis

Stations

Ticketing Cleaning Security

Facilities

Yard Management Rail Control Center Vehicle Maintenance & Repair

slide-16
SLIDE 16

16

Expected Project Benefits

slide-17
SLIDE 17

Summary

The future is underway SCMAGLEV is ready, willing and able Our infrastructure is broken and we have a solution

Welcome Aboard!

17